Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000261/2023003 | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 |
ML23041A227 | 13 February 2023 | 2022 Q4 Robinson_Workflow Final |
IR 05000261/2022003 | 3 November 2022 | Integrated Inspection Report 05000261 2022003 |
IR 05000261/2022011 | 19 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 |
IR 05000261/2022001 | 2 May 2022 | Integrated Inspection Report 05000261/2022001 |
IR 05000261/2021003 | 4 November 2021 | Integrated Inspection Report 05000261/2021003 |
IR 05000261/2021001 | 10 May 2021 | Integrated Inspection Report 05000261/2021001 |
IR 05000261/2020004 | 9 February 2021 | Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 |
ML20156A093 | 22 September 2020 | Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic |
IR 05000261/2020001 | 15 April 2020 | Integrated Inspection Report 05000261/2020001 |
ML20083F617 | 6 April 2020 | Correction to Amendment No. 266 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
IR 05000261/2019004 | 13 February 2020 | Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 |
RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error | 21 January 2020 | Request to Correct Administrative Renewed Facility Operating License Error |
RA-19-0452, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident | 12 December 2019 | Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident |
ML19205A289 | 24 September 2019 | Issuance of Amendment No. 266 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML19158A307 | 15 August 2019 | Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b |
RA-19-0154, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | 6 May 2019 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors |
IR 05000261/2018004 | 7 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000261/2018004 |
RA-18-0193, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power .. | 13 November 2018 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power .. |
RA-18-0194, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 | 13 November 2018 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 |
IR 05000261/2018003 | 7 November 2018 | Nuclear Regulatory Commission Inspection Report 05000261/2018003 |
ML18288A019 | 12 October 2018 | NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 |
ML18274A263 | 28 September 2018 | NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 |
ML18099A130 | 5 April 2018 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. |
IR 05000261/2018010 | 22 March 2018 | NRC Evaluation of Changes, Tests, and Experiments Report Number 05000261/2018010 |
IR 05000261/2017004 | 29 January 2018 | NRC Integrated Inspection Report 05000261/2017004 |
ML20311A419 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000261/2017002 | 25 July 2017 | NRC Integrated Inspection Report 05000261/2017002 |
ML17066A374 | 26 April 2017 | Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) |
ML16337A264 | 3 February 2017 | Issuance of Amendments Regarding National Fire Protection Association Standard 805 |
ML16336A527 | 1 December 2016 | H.B. Robinson, Unit 2, and ISFSI - Transmittal of Emergency Plan and Emergency Implementing Procedures Revisions and 10 CFR 50.54(q) Summary of Analyses |
IR 05000261/2016003 | 4 November 2016 | NRC Integrated Inspection Report 05000261/2016003 |
ML16201A195 | 11 October 2016 | Issuance of Amendment to Extend Containment Leakage Test Frequencies |
RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis | 20 September 2016 | Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis |
RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process | 23 June 2016 | Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process |
RNP-RA/16-0022, Report of Changes Pursuant to 10 CFR 50.59 | 21 April 2016 | Report of Changes Pursuant to 10 CFR 50.59 |
RNP-RA/16-0001, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. | 13 January 2016 | Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. |
IR 05000261/2015003 | 29 October 2015 | IR 05000261/2015003, on July 1, 2015, Through September 30, 2015; H.B. Robinson Steam Electric Plant, Unit 2, Integrated Inspection Report |
RNP-RA/15-0034, Proposed Changes to Emergency Plan | 13 May 2015 | Proposed Changes to Emergency Plan |
ML15084A179 | 23 March 2015 | Mitigating Strategies Onsite Audit Results for Orders EA-12-049 and EA-12-051 |
IR 05000261/2014005 | 28 January 2015 | IR 05000261/2014005, October 1, 2014 Through December 31, 2014; Duke Energy Progress, Inc., H.B. Robinson Steam Electric Plant, Unit 2, Adverse Weather Protection |
IR 05000261/2014004 | 28 October 2014 | IR 05000261/2014004, on July 1, 2014 Through September 30, 2014; H. B. Robinson Steam Electric Plant, Unit 2; Integrated Inspection Report |
ML13365A291 | 19 February 2014 | Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14027A063 | 24 January 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 |
ML13344B140 | 30 November 2013 | Initial Exam 2013-301 Draft Administrative Jpms |
IR 05000261/2013004 | 30 October 2013 | IR 05000261-13-004, on 07/01/2013 - 09/30/2013; H.B. Robinson Steam Electric Plant, Unit 2; Integrated Inspection |
IR 05000261/2012002 | 30 April 2012 | IR 05000261-12-002, Carolina Power and Light Company, on 01/01/2012-03/31/2012, H.B. Robinson Steam Electric Plant, Unit 2, Operability Evaluations, Refueling and Outage Activities |
RNP-RA/11-0057, LER 011-001-00 for H. B. Robinson, Unit 2, Regarding Condition Prohibited by Technical Specifications When Non-Seismic System Was Aligned to Refueling Water Storage Tank Due to Regulatory Requirements Not Adequately Incorporated in Pl | 30 June 2011 | LER 011-001-00 for H. B. Robinson, Unit 2, Regarding Condition Prohibited by Technical Specifications When Non-Seismic System Was Aligned to Refueling Water Storage Tank Due to Regulatory Requirements Not Adequately Incorporated in Plant Do |
IR 05000261/2011011 | 13 May 2011 | NRC Temporary Instruction 2515/183 Inspection Report 05000261/2011011 |
IR 05000261/2010004 | 12 November 2010 | IR 05000261-10-004 & 05000261-10-501, on 07/01/10 - 09/30/10; Carolina Power & Light Co.; H.B. Robinson, Unit 2; Post Maintenance Testing, Licensed Operator Requalification, & Event Follow-up, Inspection Report with Assessment Letter |