Issue date | Title | |
---|---|---|
ML23310A051 | 6 November 2023 | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document |
ML23293A265 | 24 October 2023 | 3rd Quarter 2023 Integrated Inspection Report |
ML23278A095 | 5 October 2023 | EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021 |
ML23228A025 | 25 September 2023 | Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
IR 05000483/2023002 | 10 July 2023 | Integrated Inspection Report 05000483/2023002 |
ML23088A254 | 23 March 2023 | EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document |
ML23062A644 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML23067A150 | 29 December 2022 | Renewed Facility Operating License |
ML22307A312 | 3 November 2022 | Evaluation of the Proposed Change |
ML22307A313 | 3 November 2022 | Attacchment 1: 54032-CALC-01, Revision 1,Callaway Plant: Evaluation of Risk Significance of Permanent ILRT Extension |
ML22220A132 | 21 October 2022 | Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach |
ML22299A235 | 21 October 2022 | HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station |
IR 05000483/2022003 | 17 October 2022 | Integrated Inspection Report 05000483/2022003 |
ML22242A293 | 29 August 2022 | Attachment 5 to Enclosure 1 - Criticality Safety Evaluation Report |
IR 05000483/2022002 | 27 July 2022 | Integrated Inspection Report 05000483/2022002 |
ML22181B139 | 30 June 2022 | Attachment 9 - Responses to NRC Audit Questions |
ML22181B141 | 30 June 2022 | Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 |
IR 05000483/2022001 | 26 April 2022 | Integrated Inspection Report 05000483/2022001 |
ML22061A004 | 7 March 2022 | Audit Questions for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505 and TSTF-439, Revision 2 |
ML22048A002 | 18 February 2022 | Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2 and TSTF-439, Revision 2 |
ML22027A807 | 27 January 2022 | Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 |
ULNRC-06690, Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138) | 27 January 2022 | Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138) |
ML21344A005 | 29 December 2021 | Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants |
ML21356B507 | 22 December 2021 | Enclosure 1: Mark-up of Operating License (OL) |
ML21356B508 | 22 December 2021 | Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) |
ML21294A412 | 21 October 2021 | Enclosure 12 - Risk Management Action Examples |
ML21294A409 | 21 October 2021 | Enclosure 9 - Key Assumptions and Sources of Uncertainty |
ML21294A402 | 21 October 2021 | Enclosure 2 - Information Supporting Consistency with Regulatory Guide 1.200, Revision 2 |
ML21294A404 | 21 October 2021 | Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models |
ML21294A405 | 21 October 2021 | Enclosure 5 - Baseline Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) |
ML21294A408 | 21 October 2021 | Enclosure 8 - Attributes of the Real Time Risk Model |
ML21280A381 | 7 October 2021 | License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 |
IR 05000483/2021002 | 5 August 2021 | Integrated Inspection Report 05000483/2021002 and Independent Spent Fuel Storage Installation Report 07201045/2021001 |
ML21210A027 | 29 July 2021 | Evaluation of the Proposed Change |
ULNRC-06651, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 | 22 July 2021 | License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 |
ML21139A022 | 9 June 2021 | Audit Summary for License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
IR 05000483/2021001 | 11 May 2021 | Integrated Inspection Report 05000483/2021001 |
ML21110A123 | 27 April 2021 | Audit Questions for License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
ML21090A187 | 31 March 2021 | Enclosure 2 - License Amendment Request for Callaway Risk-Informed Approach to Resolution of Generic Letter 2004-02 |
ML21039A222 | 18 February 2021 | Audit Plan and Setup of Online Reference Portal for License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML20304A456 | 30 October 2020 | Enclosures to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ULNRC-06550, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 30 October 2020 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
IR 05000483/2020002 | 29 July 2020 | Integrated Inspection Report 05000483/2020002 |
ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1 | 10 July 2020 | Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1 |
IR 05000483/2020001 | 20 April 2020 | Integrated Inspection Report 05000483/2020001 |
IR 05000483/2020011 | 15 April 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000483/2020011 |
ML19225D324 | 12 August 2019 | Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 10 CFR 50.54(1) Letter with Regard to NTTF 2.1: Seismic |
IR 05000483/2019002 | 9 August 2019 | Integrated Inspection Report 05000483/2019002 |
ML19051A139 | 20 February 2019 | Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages |
IR 05000483/2018004 | 28 January 2019 | NRC Integrated Inspection Report 05000483/2018004 |