Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23310A0516 November 2023EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document
ML23293A26524 October 20233rd Quarter 2023 Integrated Inspection Report
ML23278A0955 October 2023EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021
ML23228A02525 September 2023Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
IR 05000483/202300210 July 2023Integrated Inspection Report 05000483/2023002
ML23088A25423 March 2023EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document
ML23062A64429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23067A15029 December 2022Renewed Facility Operating License
ML22307A3123 November 2022Evaluation of the Proposed Change
ML22307A3133 November 2022Attacchment 1: 54032-CALC-01, Revision 1,Callaway Plant: Evaluation of Risk Significance of Permanent ILRT Extension
ML22220A13221 October 2022Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach
ML22299A23521 October 2022HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station
IR 05000483/202200317 October 2022Integrated Inspection Report 05000483/2022003
ML22242A29329 August 2022Attachment 5 to Enclosure 1 - Criticality Safety Evaluation Report
IR 05000483/202200227 July 2022Integrated Inspection Report 05000483/2022002
ML22181B13930 June 2022Attachment 9 - Responses to NRC Audit Questions
ML22181B14130 June 2022Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688
IR 05000483/202200126 April 2022Integrated Inspection Report 05000483/2022001
ML22061A0047 March 2022Audit Questions for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505 and TSTF-439, Revision 2
ML22048A00218 February 2022Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2 and TSTF-439, Revision 2
ML22027A80727 January 2022Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02
ULNRC-06690, Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138)27 January 2022Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138)
ML21344A00529 December 2021Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants
ML21356B50722 December 2021Enclosure 1: Mark-up of Operating License (OL)
ML21356B50822 December 2021Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change)
ML21294A41221 October 2021Enclosure 12 - Risk Management Action Examples
ML21294A40921 October 2021Enclosure 9 - Key Assumptions and Sources of Uncertainty
ML21294A40221 October 2021Enclosure 2 - Information Supporting Consistency with Regulatory Guide 1.200, Revision 2
ML21294A40421 October 2021Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models
ML21294A40521 October 2021Enclosure 5 - Baseline Core Damage Frequency (CDF) and Large Early Release Frequency (LERF)
ML21294A40821 October 2021Enclosure 8 - Attributes of the Real Time Risk Model
ML21280A3817 October 2021License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02
IR 05000483/20210025 August 2021Integrated Inspection Report 05000483/2021002 and Independent Spent Fuel Storage Installation Report 07201045/2021001
ML21210A02729 July 2021Evaluation of the Proposed Change
ULNRC-06651, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-0222 July 2021License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02
ML21139A0229 June 2021Audit Summary for License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
IR 05000483/202100111 May 2021Integrated Inspection Report 05000483/2021001
ML21110A12327 April 2021Audit Questions for License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors
ML21090A18731 March 2021Enclosure 2 - License Amendment Request for Callaway Risk-Informed Approach to Resolution of Generic Letter 2004-02
ML21039A22218 February 2021Audit Plan and Setup of Online Reference Portal for License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML20304A45630 October 2020Enclosures to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ULNRC-06550, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors30 October 2020Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
IR 05000483/202000229 July 2020Integrated Inspection Report 05000483/2020002
ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.110 July 2020Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1
IR 05000483/202000120 April 2020Integrated Inspection Report 05000483/2020001
IR 05000483/202001115 April 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000483/2020011
ML19225D32412 August 2019Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 10 CFR 50.54(1) Letter with Regard to NTTF 2.1: Seismic
IR 05000483/20190029 August 2019Integrated Inspection Report 05000483/2019002
ML19051A13920 February 2019Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages
IR 05000483/201800428 January 2019NRC Integrated Inspection Report 05000483/2018004