Semantic search

Jump to navigation Jump to search
 Start dateSiteTitle
05000390/FIN-2018003-0130 September 2018 23:59:59Watts BarConfiguration Control Error Results in Actual Auxiliary Building Internal Flooding Event
05000410/FIN-2017004-0331 December 2017 23:59:59Nine Mile PointInadequate Operability Determination forImpairedInternal Flood Barrier
05000483/FIN-2017007-0330 September 2017 23:59:59CallawayInputs to Internal Flooding Calculations Not Translated into Procedures or Instructions
05000482/FIN-2017002-0130 June 2017 23:59:59Wolf CreekFailure to Ensure Safety-Related Valves were Adequately Protected from Internal Flooding Hazards
05000390/FIN-2017001-0131 March 2017 23:59:59Watts BarFailure to Maintain the Abnormal Operating Instruction for Tornados
05000400/FIN-2017001-0131 March 2017 23:59:59HarrisLicensee-Identified Violation
05000249/FIN-2016010-0131 December 2016 23:59:59DresdenFailure to Verify the Adequacy of Design for the Unit 3 HPCI AOP Motor Shunt Resistor Setting
05000247/FIN-2016004-0431 December 2016 23:59:59Indian PointFailure to Follow RPS Logic Train B Actuation Logic Test
05000286/FIN-2016004-0231 December 2016 23:59:59Indian PointInadequate Operability Evaluation of Leak in Service Water Pump Discharge Pipe
05000263/FIN-2016010-0130 September 2016 23:59:59MonticelloFailure to Plan and Perform maintenance to Correct HPCI Oil Leak
05000289/FIN-2016003-0130 September 2016 23:59:59Three Mile IslandEmergency Diesel Generator Internal Flooding Risk Not Evaluated
05000388/FIN-2016003-0130 September 2016 23:59:59SusquehannaInadequate Work Instructions for Breaching Internal Flood Barrier
05000456/FIN-2016007-0230 September 2016 23:59:59BraidwoodOperation of SX System Valves Results in Cavitation Damage and Pipe Leakage
05000454/FIN-2016002-0130 June 2016 23:59:59ByronFailure to Perform ASME Code Case Required Extent of Condition to Identify Unacceptable Piping Flaws
05000313/FIN-2016007-0331 March 2016 23:59:59Arkansas NuclearInadequate Operating Experience Evaluations
05000483/FIN-2016001-0231 March 2016 23:59:59CallawayInadequate Operability Evaluation for Degraded Flood Mitigation Capability in Piping Penetration Room
05000352/FIN-2016001-0331 March 2016 23:59:59LimerickInadequate Work Staging and Housekeeping Walkdowns During PreOutage Preparations
05000266/FIN-2015003-0230 September 2015 23:59:59Point BeachPotential Failure of Multiple Safety-Related Trains During Flooding Events
05000400/FIN-2015003-0530 September 2015 23:59:59HarrisFailure to implement EQ Program Requirements
05000458/FIN-2015003-0130 September 2015 23:59:59River BendFailure to Operate the Unit 1 Feedwater System In Accordance With Procedures
05000289/FIN-2015003-0130 September 2015 23:59:59Three Mile IslandInternal Flooding Licensing Basis Commitment Not Met
05000348/FIN-2015001-0231 March 2015 23:59:59FarleyFailure to maintain AFW pump room watertight doors
05000397/FIN-2015001-0131 March 2015 23:59:59ColumbiaFailure to Comply with ECCS Technical Specifications
05000341/FIN-2015001-0131 March 2015 23:59:59FermiFailure to Correct a Nonconforming Condition Adversely Affecting Plant Safety with the Reactor Building Steam Tunnel Floor Drain
05000400/FIN-2014005-0131 December 2014 23:59:59HarrisFailure to Adequately Implement the Equipment Clearance Procedure
05000341/FIN-2014005-0131 December 2014 23:59:59FermiPotential Missile Hazards from Unrestrained Equipment Near the 345-Kilovolt and 120-Kilovolt Switchyards
05000282/FIN-2014005-0431 December 2014 23:59:59Prairie IslandLicensee-Identified Violation
05000285/FIN-2013018-0431 December 2014 23:59:59Fort CalhounFailure to Promptly Identify and Correct Inadequate Internal Flooding Analysis
05000456/FIN-2014004-0130 September 2014 23:59:59BraidwoodAdverse Impact of Floor Drain Design on Flooding Analysis
05000456/FIN-2014003-0330 June 2014 23:59:59BraidwoodCorrective Actions to Address NCV 05000456/2012005-01; 05000457/2012005-01, "Failure to Maintain Watertight Door Safety Function After Routine Passage"
05000354/FIN-2014003-0130 June 2014 23:59:59Hope CreekInadequate Procedural Guidance for Responding to an Internal Flooding Event in the HPCI and RCIC Rooms
05000298/FIN-2014002-0131 March 2014 23:59:59CooperFailure to Implement Risk Management Actions for Maintenance Activities
05000266/FIN-2014007-0231 March 2014 23:59:59Point BeachFailure to Maintain External Flooding Procedure to Address All Possible CLB Floods
05000313/FIN-2013012-0331 March 2014 23:59:59Arkansas NuclearFailure to Scope Required Components in the Stations Maintenance Rule Monitoring Program
05000313/FIN-2013012-0131 March 2014 23:59:59Arkansas NuclearFailure to Adequately Develop and Implement Adequate Procedural Controls to Remediate the Anticipated Effects of Internal Flooding for Either Unit
05000266/FIN-2014002-0331 March 2014 23:59:59Point BeachFailure to Perform Flood Reviews of Material That Could Affect Flood Relief Paths
05000321/FIN-2014002-0331 March 2014 23:59:59HatchFailure to Operate the Unit 2 Master Feedwater Controller In Accordance With Procedures
05000368/FIN-2013012-0531 March 2014 23:59:59Arkansas NuclearFailure to Follow the Materials Handling Program during the Unit 1 Generator Stator Move
05000259/FIN-2013005-0531 December 2013 23:59:59Browns FerryFailure to Maintain Emergency Diesel Room Floor Drains
05000397/FIN-2013005-0131 December 2013 23:59:59ColumbiaFailure to Translate Internal Flooding Design into Station Procedures
05000387/FIN-2013005-0131 December 2013 23:59:59SusquehannaInadequate Procedural Guidance for Responding to an Internal Flooding Event in ECCS Rooms
05000259/FIN-2013005-0131 December 2013 23:59:59Browns FerryFailure to Document Service Water Freeze Protection Deficiencies
05000361/FIN-2013003-0230 June 2013 23:59:59San OnofreProcedure Adequacy for Responding to External Flooding Events
05000298/FIN-2013003-0130 June 2013 23:59:59CooperFailure to Adequately Assess Risk and Implement Risk Management Actions for Proposed Maintenance
05000341/FIN-2013009-0130 June 2013 23:59:59FermiFailure to Implement Foreign Material Exclusion Procedure Requirements Adversely Affected the Reliability of the Main Turbine Generator and Caused a Reactor Scram
05000298/FIN-2013002-0231 March 2013 23:59:59CooperFailure to Maintain Design Control of the Internal Flooding Analysis
05000327/FIN-2013002-0231 March 2013 23:59:59SequoyahInadequate Abnormal Operating Procedure for Internal Flood Mitigation Strategy
05000282/FIN-2013002-0131 March 2013 23:59:59Prairie IslandFailure to Properly Secure Materials Near Critical Drainage Path
05000390/FIN-2012009-0531 March 2013 23:59:59Watts BarFailure to Correct Conditions Adverse to Quality Related to IPS CKV-040-0604 and IPS 3A and 3B Sump Pumps
05000282/FIN-2012005-1131 December 2012 23:59:59Prairie IslandLicensee-Identified Violation