Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23107A038 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems |
ML22322A276 | 18 November 2022 | HOL011 - Ocrwm Mission Plan Amendment (June 1987) |
ML21354A753 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 |
ML21354A750 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 5 of 18 |
ML21354A748 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 3 of 18 |
ML21152A113 | 1 June 2021 | Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes |
PNP 2021-008, 5 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis |
ML21125A312 | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems, Sections |
ML20226A272 | 18 August 2020 | Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI |
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) | 12 August 2020 | Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) |
PNP 2019-004, License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b | 28 March 2019 | License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b |
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 | 31 January 2019 | Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 |
ML18270A322 | 27 September 2018 | Attachment 1: Description and Evaluation of Technical Specifications Changes |
ML18128A067 | 8 June 2018 | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 |
ML18135A263 | 21 May 2018 | Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant Condition |
CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) | 29 March 2018 | Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) |
PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases | 8 November 2017 | Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases |
ML21067A498 | 7 September 2017 | Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System |
ML17194A807 | 14 August 2017 | Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval |
ML17082A465 | 30 May 2017 | Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing |
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | 20 December 2016 | Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 |
PNP 2016-005, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. | 11 July 2016 | License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. |
PNP 2016-006, Inservice Testing Program Plan Fifth 10-Year Interval | 28 April 2016 | Inservice Testing Program Plan Fifth 10-Year Interval |
ML16043A485 | 14 March 2016 | Relief Request Number RR 4-24 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination |
PNP 2015-089, Inservice Inspection Master Program Fifth 10-Year Interval | 9 December 2015 | Inservice Inspection Master Program Fifth 10-Year Interval |
ML15320A244 | 25 November 2015 | Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities |
ML15106A682 | 23 November 2015 | Issuance of Amendment License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis |
ML15220A000 | 7 August 2015 | Petitioners' Brief in Opposition to Entergy Appeal of LBP-15-20 |
ML15194A503 | 13 July 2015 | Entergy'S Notice of Appeal of LBP-15-20 |
ML15169A273 | 18 June 2015 | Memorandum and Order (Granting Petition to Intervene and Request for a Hearing) (LBP-15-20) |
ML15120A227 | 1 May 2015 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 |
PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities | 29 April 2015 | Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities |
ML15093A456 | 3 April 2015 | NRC Staff Answer to Petition to Intervene and Hearing Request Filed by Beyond Nuclear, Don'T Waste Michigan, Michigan Safe Energy Future Shoreline Chapter and the Nuclear Energy Information Service |
ML14357A593 | 15 December 2014 | Chapter 14 UFSAR, Rev. 31, Section 14.1 -Table 14.14-7, Revision 28, Page 1 of 1 |
ML14344A321 | 8 December 2014 | Amended Petition for Petition to Intervene and for a Public Adjudication Hearing of Entergy License Amendment Request for Authorization to Implement 10 CFR 50.61a |
ML14335A807 | 1 December 2014 | Petition to Intervene and for a Public Adjudication Hearing of Entergy License Amendment Request for Authorization to Implement 10 CFR Section 50.61a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shoc |
NRC-2014-0207, Comment (3) of Kevin Kamps on Behalf of Beyond Nuclear on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | 31 October 2014 | Comment (3) of Kevin Kamps on Behalf of Beyond Nuclear on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
PNP 2014-080, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors | 14 August 2014 | Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors |
ML14142A104 | 21 May 2014 | NRR E-mail Capture - Request for Additional Information - PRA - Palisades - NFPA 805 LAR - MF0382 |
PNP 2013-076, License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process | 11 December 2013 | License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process |
ML13018A312 | 24 January 2013 | Correction to Amendment No. 245 Regarding Primary Coolant System Pressure-Temperature Limits |
PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers | 6 September 2012 | License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers |
PNP 2012-035, Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination | 26 April 2012 | Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination |
ML120670463 | 12 March 2012 | Relief from the Requirements of the ASME Code for the Third 10-Year Inservice Inspection Interval |
ML113480303 | 19 January 2012 | Issuance of Amendment Primary Coolant System Pressure-Temperature Limits |
PNP 2011-067, Response to Request for Additional Information - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years | 28 October 2011 | Response to Request for Additional Information - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years |
ML102110090 | 26 July 2010 | License Amendment Withdrawal and Request - Cyber Security Plan |
ML081270073 | 5 May 2008 | Application to Eliminate License Condition 2.F Requiring Reporting of Violations of Section 2.C of Operating License Using the Consolidated Line Item Improvement Process |
ML072630427 | 21 September 2007 | Relief, Request Relief No. 1 - from Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Repair of Pressurizer Nozzle Penetrations |
ML072040399 | 18 September 2007 | Request for Relief from ASME Section Xl Code Requirements for Repair of Pressurizer Nozzle Penetrations - Relief Request # 2 |