Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23111A213 | 21 April 2023 | Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities |
ML22257A022 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22073A185 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22007A317 | 18 January 2022 | 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML21354A748 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 3 of 18 |
ML21354A750 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 5 of 18 |
ML21354A753 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 |
ML21294A067 | 28 October 2021 | Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing Frequency |
ML21175A287 | 14 July 2021 | Updated NRC Staff Draft White Paper Analysis of Applicability of NRC Regulations for Non-LWRs |
ML21158A300 | 7 June 2021 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI |
ML21019A219 | 24 February 2021 | Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval |
ML21039A276 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21039A339 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20344A057 | 10 December 2020 | Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors |
ML20226A272 | 18 August 2020 | Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI |
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) | 12 August 2020 | Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) |
GNRO-2020/00022, Report of Technical Specification Bases Changes | 21 July 2020 | Report of Technical Specification Bases Changes |
ML20134H877 | 12 May 2020 | Technical Specification Bases 3.0 |
ML20091M363 | 31 March 2020 | Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test |
GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | 19 February 2020 | License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies |
ML19266A586 | 11 October 2019 | Relief Request GG-ISI-023, Examination Coverage of Class 1 Piping and Vessel Welds |
ML19123A014 | 18 June 2019 | Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis |
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 | 31 January 2019 | Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 |
ML18128A067 | 8 June 2018 | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 |
ML18085A579 | 26 March 2018 | Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals |
GNRO-2018/00002, Nuclear. Station, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis Supplement Regarding De Minimis Penetrations | 22 January 2018 | Nuclear. Station, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis Supplement Regarding De Minimis Penetrations |
GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis | 3 November 2017 | License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis |
ML17235A533 | 31 August 2017 | Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice Inspection |
GNRO-2017/00053, Response to Eseb RAI-1, Results of IWE and Iwl Inspections | 25 August 2017 | Response to Eseb RAI-1, Results of IWE and Iwl Inspections |
GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass | 29 December 2016 | License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass |
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | 20 December 2016 | Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 |
ML16243A024 | 8 December 2016 | Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1 |
GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. | 26 October 2016 | Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. |
ML16278A017 | 19 October 2016 | Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code |
CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) | 2 June 2016 | Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) |
CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code | 20 November 2015 | Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code |
ML15120A227 | 1 May 2015 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 |
ML14184A782 | 1 August 2014 | Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, B13.10, Categories B-N-1 and B-N-2, Third 10-Year Inservice Inspection Interval |
ML14148A262 | 30 June 2014 | Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, Third 10 -Year Inservice Inspection Interval |
ML14051A671 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
ML13364A286 | 30 December 2013 | Maximum Extended Load Mine Limit Analysis Plus (Mella+) License Amendment Request-Responses to Requests for Supplemental Information |
GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. | 8 November 2013 | LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. |
ML13316B024 | 8 November 2013 | Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States |
ML13261A264 | 25 September 2013 | Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition |
ML12326A331 | 30 November 2012 | Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval |
CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc | 15 October 2012 | Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc |
ML12214A318 | 17 August 2012 | Relief Request ISI-17, Use of ASME Code Cases N-638-4 and N-504-4 for Alternative Repair of RHR LPCI Weld During Refueling Outage RF-18, Third 10-Year Inservice Inspection Interval |
GNRO-2012/00071, Response to Request for Additional Information (RAI) Dated June 5, 2012 | 3 July 2012 | Response to Request for Additional Information (RAI) Dated June 5, 2012 |
GNRO-2012/00036, Response to Request for Additional Information (RAI) Dated April 12, 2012 | 9 May 2012 | Response to Request for Additional Information (RAI) Dated April 12, 2012 |