Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23111A21321 April 2023Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities
ML22257A0228 September 2022Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22073A1858 March 2022Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22007A31718 January 20221, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI
ML21354A74820 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 3 of 18
ML21354A75020 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 5 of 18
ML21354A75320 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18
ML21294A06728 October 2021Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing Frequency
ML21175A28714 July 2021Updated NRC Staff Draft White Paper Analysis of Applicability of NRC Regulations for Non-LWRs
ML21158A3007 June 2021Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI
ML21019A21924 February 2021Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval
ML21039A27627 January 2021Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21039A33927 January 2021Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20344A05710 December 2020Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors
ML20226A27218 August 2020Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)
GNRO-2020/00022, Report of Technical Specification Bases Changes21 July 2020Report of Technical Specification Bases Changes
ML20134H87712 May 2020Technical Specification Bases 3.0
ML20091M36331 March 2020Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test
GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies19 February 2020License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies
ML19266A58611 October 2019Relief Request GG-ISI-023, Examination Coverage of Class 1 Piping and Vessel Welds
ML19123A01418 June 2019Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 431 January 2019Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4
ML18085A57926 March 2018Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals
GNRO-2018/00002, Nuclear. Station, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis Supplement Regarding De Minimis Penetrations22 January 2018Nuclear. Station, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis Supplement Regarding De Minimis Penetrations
GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis3 November 2017License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis
ML17235A53331 August 2017Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice Inspection
GNRO-2017/00053, Response to Eseb RAI-1, Results of IWE and Iwl Inspections25 August 2017Response to Eseb RAI-1, Results of IWE and Iwl Inspections
GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass29 December 2016License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 201520 December 2016Entergy - Form 10-K for Fiscal Year Ended December 31, 2015
ML16243A0248 December 2016Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1
GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..26 October 2016Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..
ML16278A01719 October 2016Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code
CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2 June 2016Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)
CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code20 November 2015Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code
ML15120A2271 May 2015Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015
ML14184A7821 August 2014Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, B13.10, Categories B-N-1 and B-N-2, Third 10-Year Inservice Inspection Interval
ML14148A26230 June 2014Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, Third 10 -Year Inservice Inspection Interval
ML14051A6714 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20144 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML13364A28630 December 2013Maximum Extended Load Mine Limit Analysis Plus (Mella+) License Amendment Request-Responses to Requests for Supplemental Information
GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..8 November 2013LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..
ML13316B0248 November 2013Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States
ML13261A26425 September 2013Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition
ML12326A33130 November 2012Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval
CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc15 October 2012Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc
ML12214A31817 August 2012Relief Request ISI-17, Use of ASME Code Cases N-638-4 and N-504-4 for Alternative Repair of RHR LPCI Weld During Refueling Outage RF-18, Third 10-Year Inservice Inspection Interval
GNRO-2012/00071, Response to Request for Additional Information (RAI) Dated June 5, 20123 July 2012Response to Request for Additional Information (RAI) Dated June 5, 2012
GNRO-2012/00036, Response to Request for Additional Information (RAI) Dated April 12, 20129 May 2012Response to Request for Additional Information (RAI) Dated April 12, 2012