Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program |
ML23269A066 | 28 September 2023 | Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval |
ML23265A132 | 27 September 2023 | Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval |
ML23205A136 | 20 September 2023 | Proposed Alternative Request RV-02D Associated with the Sixth IST Interval |
ML23114A252 | 28 April 2023 | Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI |
IR 05000237/2023010 | 9 March 2023 | Biennial Problem Identification and Resolution Inspection Report 05000237/2023010 and 05000249/2023010 |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML22179A291 | 27 October 2022 | Withdrawal of Proposed Alternative to Use ASME Code Case N-921 for the Sixth Inservice Inspection Intervals |
RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 | 19 July 2022 | Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 |
RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals | 9 June 2022 | Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals |
ML22062B649 | 24 May 2022 | Supplemental Information Needed for Acceptance of Proposed Alternative to Use ASME Code Case N-921 |
ML22094A001 | 15 April 2022 | Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) |
ML22060A078 | 7 March 2022 | Summary of Meeting with Constellation Energy Generation, LLC Regarding a Proposed Alternative to Extend the In-service Inspection Intervals |
ML22053A291 | 22 February 2022 | NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities |
RS-21-009, Proposed Relief Request Associated with Code Case N-921 | 18 January 2022 | Proposed Relief Request Associated with Code Case N-921 |
ML21267A317 | 13 December 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting (6th ISI Interval) (Epids L-2021-LLR 0029, 0030) |
ML21333A153 | 30 November 2021 | Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval |
ML21230A206 | 3 September 2021 | Proposed Alternative to Use ASME OM Code Case OMN-28 |
ML21216A220 | 5 August 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting |
ML21166A168 | 25 June 2021 | |
ML21139A185 | 22 June 2021 | Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting |
ML21179A028 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML21179A034 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21179A036 | 21 June 2021 | Letter and Attachments Regarding Updated Final Safety Analysis Report (Ufsar), Revision 14 and Fire Protection Report (Fpr), Amendment 23 |
ML21117A044 | 26 April 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting |
ML21077A177 | 8 April 2021 | Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) |
JAFP-21-0014, Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs | 3 March 2021 | Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs |
ML21062A065 | 1 March 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting |
ML21028A673 | 3 February 2021 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 |
ML21005A061 | 14 January 2021 | Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) |
ML20351A283 | 18 December 2020 | Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs |
ML20323A033 | 1 December 2020 | Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs |
ML20269A200 | 30 September 2020 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a |
RS-20-110, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 2 September 2020 | Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
RS-20-111, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 2 September 2020 | Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML20099D955 | 17 April 2020 | Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations |
ML20008D276 | 13 January 2020 | Safety Evaluation in Support of Request for Relief Associated with the Fifth Ins)Inservice Inspection Interval Relief Request I5R-04, Revision 2 |
ML19269C534 | 27 September 2019 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques |
JAFP-19-0084, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 27 August 2019 | Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML19192A244 | 18 July 2019 | Proposed Alternative to Use ASME Code Cases N-878 and N-880 |
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 27 June 2019 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability |
ML19162A027 | 21 June 2019 | Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 |
ML18060A324 | 9 March 2018 | Relief Request I5R-16 Approval of Alternative to Use the Performance Demonstration Initiative Program for Weld Overlay Inspection Qualifications |
ML18022A616 | 24 January 2018 | Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) |
ML17121A049 | 30 October 2017 | Safety Evaluation by the Office of Nuclear Reactor Regulation for the Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography |
SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December | 29 August 2017 | Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December |
RS-17-082, Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 | 21 June 2017 | Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 |