Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23321A047 | 20 December 2023 | Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application |
L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD | 12 September 2023 | Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD |
IR 05000440/2023001 | 4 May 2023 | Integrated Inspection Report (05000440/2023001) |
L-22-271, Emergency Plan | 20 December 2022 | Emergency Plan |
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | 18 November 2022 | Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 |
IR 05000440/2022002 | 8 August 2022 | Integrated Inspection Report 05000440/2022002 |
ML21361A222 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.0 to 2.4 (Redacted) |
ML22165A327 | 19 February 2021 | 2021 Perry Ile Administered Written Exam with Reference Handouts-Final |
L-21-039, Ohio National Pollution Discharge Elimination System (NPDES) Permit 3I800016 | 15 February 2021 | Ohio National Pollution Discharge Elimination System (NPDES) Permit 3I800016 |
IR 05000440/2020002 | 14 August 2020 | Integrated Inspection Report 05000440/2020002 |
ML20115E243 | 7 May 2020 | Staff Assessment of Flooding Focused Evaluation |
L-19-266, Focused Evaluation Regarding Near-Term Task Force Recommendation 2.1 for Flooding | 18 November 2019 | Focused Evaluation Regarding Near-Term Task Force Recommendation 2.1 for Flooding |
ML19022A324 | 25 February 2019 | Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency |
IR 05000440/2018004 | 12 February 2019 | NRC Integrated Inspection Report 05000440/2018004 and 07200069/2018001 |
IR 05000440/2018003 | 8 November 2018 | NRC Integrated Inspection Report 05000440/2018003 |
IR 05000440/2018002 | 10 August 2018 | NRC Integrated Inspection Report 05000440/2018002 |
L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency | 7 March 2018 | License Amendment Request to Extend Containment Leakage Test Frequency |
IR 05000440/2017008 | 3 January 2018 | NRC Design Bases Assurance Inspection (Teams) Inspections Report 05000440/2017008 (DRS-N.Feliz-Adorno) |
IR 05000440/2017001 | 15 May 2017 | Reissue - Perry Nuclear Power Plant - NRC Integrated Inspection Report 05000440/2017001 |
ML17131A207 | 11 May 2017 | NRC Integrated Inspection Report 05000440/2017001 |
ML16274A062 | 16 September 2016 | Revision 48 to Emergency Plan |
ML16158A331 | 14 September 2016 | Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan |
ML16207A311 | 12 July 2016 | Revision 47 to Emergency Plan |
ML16056A560 | 16 May 2016 | Unit No.1 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 |
IR 05000440/2016001 | 13 May 2016 | NRC Integrated Inspection Report 05000440/2016001 |
ML15307A349 | 23 February 2016 | Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) |
IR 05000440/2015004 | 11 February 2016 | NRC Integrated Inspection Report 05000440/2015004 |
L-15-097, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 March 2015 | Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML14141A460 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident |
L-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b | 25 March 2014 | License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b |
IR 05000440/2013005 | 6 February 2014 | Re-Issued Inspection Report (IR) 05000440-13-005, 10/01/2013 - 12/31/2013; Perry Nuclear Power Plant |
ML14028A478 | 28 January 2014 | IR 05000440-13005, on 10/01/2013 - 12/31/2013; Perry Nuclear Power Plant, NRC Integrated Inspection Report |
ML13338A460 | 22 January 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies |
ML14014A209 | 14 January 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Perry Nuclear Power Plant, Unit 1, TAC No.: MF0962 (Revision 1) |
ML14003A186 | 3 January 2014 | IR 05000440-13-007; 11/04/2013 - 11/22/2013; Perry Nuclear Power Plant; Biennial PI&R Inspection |
L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 27 November 2012 | FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident |
L-12-373, Submittal of Emergency Plan Changes, Revision 37 | 24 October 2012 | Submittal of Emergency Plan Changes, Revision 37 |
IR 05000440/2012003 | 31 July 2012 | IR 05000440-12-003; 04/01/2012 - 06/30/2012; Perry Nuclear Power Plant; Operability Determinations and Functionality Assessments; Radiological Hazard Assessment and Exposure Controls; Problem Identification and Resolution |
IR 05000440/2012002 | 24 April 2012 | IR 05000440-12-002, on 01/01/2012 - 03/31/2012, Perry Nuclear Power Plant, Outage Activities, Integrated Inspection Report |
L-12-136, Revision of the National Pollutant Discharge Elimination System Permit | 12 April 2012 | Revision of the National Pollutant Discharge Elimination System Permit |
ML12056A047 | 12 March 2012 | Enclosure 1 - Recommendation 2.1: Seismic |
ML12056A048 | 12 March 2012 | Enclosure 2 - Recommendation 2.1: Flooding |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
L-11-293, CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds | 14 November 2011 | CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds |
ML112860245 | 17 October 2011 | Issuance of Amendment No. 160, Revise Technical Specification 3.8.1, AC Sources - Operating, Regarding Use of a Delayed Circuit as a Required Offsite Circuit (Emergency Circumstances) |
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | 11 October 2011 | License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. |
IR 05000440/2011002 | 28 April 2011 | IR 05000440-11-002, on 01/01/2011 - 03/31/2011; Radiological Hazard Assessment and Exposure Controls |
IR 05000440/2010005 | 1 February 2011 | IR 05000440-10-005, on 10/01/2010 - 12/31/2010, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, and Problem Identification and Resolution |
ML102170193 | 18 July 2010 | 2010 Perry Plant Initial License Examination Proposed Written Examination |