 Issue dateTitle
ML23321A04720 December 2023Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application
L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD12 September 2023Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD
IR 05000440/20230014 May 2023Integrated Inspection Report (05000440/2023001)
L-22-271, Emergency Plan20 December 2022Emergency Plan
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 2218 November 2022Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22
IR 05000440/20220028 August 2022Integrated Inspection Report 05000440/2022002
ML21361A22220 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.0 to 2.4 (Redacted)
ML22165A32719 February 20212021 Perry Ile Administered Written Exam with Reference Handouts-Final
L-21-039, Ohio National Pollution Discharge Elimination System (NPDES) Permit 3I80001615 February 2021Ohio National Pollution Discharge Elimination System (NPDES) Permit 3I800016
IR 05000440/202000214 August 2020Integrated Inspection Report 05000440/2020002
ML20115E2437 May 2020Staff Assessment of Flooding Focused Evaluation
L-19-266, Focused Evaluation Regarding Near-Term Task Force Recommendation 2.1 for Flooding18 November 2019Focused Evaluation Regarding Near-Term Task Force Recommendation 2.1 for Flooding
ML19022A32425 February 2019Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency
IR 05000440/201800412 February 2019NRC Integrated Inspection Report 05000440/2018004 and 07200069/2018001
IR 05000440/20180038 November 2018NRC Integrated Inspection Report 05000440/2018003
IR 05000440/201800210 August 2018NRC Integrated Inspection Report 05000440/2018002
L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency7 March 2018License Amendment Request to Extend Containment Leakage Test Frequency
IR 05000440/20170083 January 2018NRC Design Bases Assurance Inspection (Teams) Inspections Report 05000440/2017008 (DRS-N.Feliz-Adorno)
IR 05000440/201700115 May 2017Reissue - Perry Nuclear Power Plant - NRC Integrated Inspection Report 05000440/2017001
ML17131A20711 May 2017NRC Integrated Inspection Report 05000440/2017001
ML16274A06216 September 2016Revision 48 to Emergency Plan
ML16158A33114 September 2016Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan
ML16207A31112 July 2016Revision 47 to Emergency Plan
ML16056A56016 May 2016Unit No.1 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
IR 05000440/201600113 May 2016NRC Integrated Inspection Report 05000440/2016001
ML15307A34923 February 2016Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106)
IR 05000440/201500411 February 2016NRC Integrated Inspection Report 05000440/2015004
L-15-097, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 March 2015Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14141A46030 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
L-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b25 March 2014License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b
IR 05000440/20130056 February 2014Re-Issued Inspection Report (IR) 05000440-13-005, 10/01/2013 - 12/31/2013; Perry Nuclear Power Plant
ML14028A47828 January 2014IR 05000440-13005, on 10/01/2013 - 12/31/2013; Perry Nuclear Power Plant, NRC Integrated Inspection Report
ML13338A46022 January 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML14014A20914 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Perry Nuclear Power Plant, Unit 1, TAC No.: MF0962 (Revision 1)
ML14003A1863 January 2014IR 05000440-13-007; 11/04/2013 - 11/22/2013; Perry Nuclear Power Plant; Biennial PI&R Inspection
L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident27 November 2012FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
L-12-373, Submittal of Emergency Plan Changes, Revision 3724 October 2012Submittal of Emergency Plan Changes, Revision 37
IR 05000440/201200331 July 2012IR 05000440-12-003; 04/01/2012 - 06/30/2012; Perry Nuclear Power Plant; Operability Determinations and Functionality Assessments; Radiological Hazard Assessment and Exposure Controls; Problem Identification and Resolution
IR 05000440/201200224 April 2012IR 05000440-12-002, on 01/01/2012 - 03/31/2012, Perry Nuclear Power Plant, Outage Activities, Integrated Inspection Report
L-12-136, Revision of the National Pollutant Discharge Elimination System Permit12 April 2012Revision of the National Pollutant Discharge Elimination System Permit
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: Seismic
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: Flooding
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
L-11-293, CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds14 November 2011CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds
ML11286024517 October 2011Issuance of Amendment No. 160, Revise Technical Specification 3.8.1, AC Sources - Operating, Regarding Use of a Delayed Circuit as a Required Offsite Circuit (Emergency Circumstances)
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.11 October 2011License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.
IR 05000440/201100228 April 2011IR 05000440-11-002, on 01/01/2011 - 03/31/2011; Radiological Hazard Assessment and Exposure Controls
IR 05000440/20100051 February 2011IR 05000440-10-005, on 10/01/2010 - 12/31/2010, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, and Problem Identification and Resolution
ML10217019318 July 20102010 Perry Plant Initial License Examination Proposed Written Examination