Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
L-21-005, Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 2021 | 4 November 2021 | Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 2021 |
ML20281A412 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Except 2.6 Figures |
IR 05000133/2016001 | 3 March 2016 | IR 050-00133/16-001 |
IR 05000133/1998004 | 20 November 1998 | Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Major Areas Inspected:Review Work Activities Associated with Removal of 250 Ft Tall Ventilation Stack |
Information Notice 1996-36, Degradation of Cooling Water Systems Due to Icing | 12 June 1996 | Degradation of Cooling Water Systems Due to Icing |
Information Notice 1993-95, Storm-Related Loss of Offsite Power Events Due to Salt Buildup on Switchyard Insulators | 13 December 1993 | Storm-Related Loss of Offsite Power Events Due to Salt Buildup on Switchyard Insulators |
Information Notice 1992-49, Recent Loss or Severe Degradation of Service Water Systems | 2 July 1992 | Recent Loss or Severe Degradation of Service Water Systems |
ML20127N680 | 11 June 1985 | Insp Rept 50-133/85-02 on 850513-16.Violations Noted:Failure to Follow Fuel Handling Procedures,Failure to Control Access to High Radiation Areas & Failure to Make Records of Required Radiation Surveys |