IR 05000324/2021002 | 11 August 2021 | Integrated Inspected Report 05000324/2021002 and 05000325/2021002 |
ML21034A625 | 3 February 2021 | 301 2A Exam Final Items (2 Year Delayed Release) |
ML21015A016 | 15 January 2021 | 301 1A Final RO Written Exam (2-Year Delayed Release) |
ML21015A020 | 15 January 2021 | 301 1A Final SRO Written Exam (2-Year Delayed Release) |
IR 05000324/2020001 | 12 May 2020 | Integrated Inspection Report Report 05000324/2020001 and 05000325/2020001 |
ML17181A395 | 30 June 2017 | Exam Final Items 2B - Delay Release |
ML17017A385 | 27 January 2017 | Final SRO Written Exam - Delay Release 2 Years |
ML17012A304 | 27 January 2017 | Final RO Written Exam - Delay Release 2 Yrs |
IR 05000324/2016003 | 9 November 2016 | NRC Integrated Inspection Report 05000325/2016003 and 05000324/2016003 and Exercise of Enforcement Discretion |
ML14350A134 | 16 December 2014 | Initial Exam 2014-301 Draft Simulator Scenarios |
ML14350A161 | 16 December 2014 | Initial Exam 2014-301 Final Simulator Scenarios |
ML13032A562 | 29 January 2013 | Initial Exam 2012-301 Final Simulator Scenarios |
ML13032A198 | 29 January 2013 | Initial Exam 2012-301 Draft Simulator Scenarios |
ML111020318 | 6 April 2011 | Initial Exam 2010-302 Draft RO Written Exam |
ML110240253 | 24 January 2011 | Initial Exam 2010-302 Final RO Written Exam |
ML101590080 | 3 May 2010 | Initial Exam 2010-301 Draft Simulator Scenarios |
ML101590074 | 3 May 2010 | Initial Exam 2010-301 Draft RO Written Exam |
ML101590095 | 3 May 2010 | Initial Exam 2010-301 Final Administrative Documents |
ML101590173 | 3 May 2010 | Initial Exam 2010-301 Final Simulator Scenarios |
ML101240859 | 20 April 2010 | Initial Exam 2010-301 Final SRO Written Exam |
ML101240843 | 20 April 2010 | Initial Exam 2010-301 Final RO Written Exam |
ML083380359 | 3 December 2008 | November 2008 Exam 05000325, 324/2008302 - Final Combined Ro/Sro Written Exam with Kas, Answers, & References |
ML090270038 | 10 November 2008 | 302 RO Written Exam |
IR 05000324/2008003 | 30 July 2008 | IR 05000324-08-003, 05000325-08-003; 04/01/2008 - 06/30/2008; Brunswick Steam Electric Plant Unit 1 and Unit 2; Routine Baseline Inspection Report, Plant Modifications, Post Maintenance Testing, and Public Radiation Safety |
ML081220301 | 17 April 2008 | April 2008 Retake Exam 05000325/2008301 - Final RO Written Exam & Answer Key |
ML072960488 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (4 of 4) |
ML072970102 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 4 of 4) (Section 1 of 2) |
IR 05000325/2003301 | 9 September 2002 | February 50-325/2003-301 Exam Draft Simulator Scenarios |
BSEP-98-0178, Responds to NRC Re Violations Noted in Insp Repts 50-324/98-07 & 50-325/98-07.Corrective Actions:On 980505 Breaker Was Properly Tested & Returned to Service IAW 0PM-BKR008 | 10 September 1998 | Responds to NRC Re Violations Noted in Insp Repts 50-324/98-07 & 50-325/98-07.Corrective Actions:On 980505 Breaker Was Properly Tested & Returned to Service IAW 0PM-BKR008 |
IR 05000324/1998007 | 11 August 1998 | Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
ML20237B921 | 11 August 1998 | Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples |
IR 05000324/1998005 | 1 June 1998 | Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support |
ML20197A937 | 25 February 1998 | Rev 4 to 0AP-025, Bnp Integrated Scheduling |
ML20199J571 | 14 November 1997 | Rev 3 to 0AP-025, Bnp Integrated Scheduling |
ML20198F410 | 1 August 1997 | Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000324/1997007 | 20 June 1997 | Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support |
BSEP-95-0561, Application for Amends to Licenses DPR-62 & DPR-71,modifying RPS Electrical Protective Assemblies Channel Functional Test Surveillance Interval in TS SR 4.8.2.5.a,per GL 91-09 | 15 November 1995 | Application for Amends to Licenses DPR-62 & DPR-71,modifying RPS Electrical Protective Assemblies Channel Functional Test Surveillance Interval in TS SR 4.8.2.5.a,per GL 91-09 |
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems | 25 November 1994 | Inadequate DC Ground Detection in Direct Current Distribution Systems |
ML20077B415 | 4 November 1994 | Provides NRC W/Encl Exam Comments for Exam Given on 941024 at Plant |
ML20118B026 | 21 September 1992 | Responds to Violations Noted in Insp Repts 50-324/92-21 & 50-325/92-21.Corrective Actions:Mgt Directive Implemented Requiring Clearances to Be Hung on Test Boundary Isolation Valves Only & LLRT Procedure Test Lineup Revised |
PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys | 5 February 1992 | PNO-II-92-007:on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys |
ML20079G892 | 27 August 1991 | Part 21 Rept Re Failure of Normally Energized Asco Model L206-832 Solenoid Valves Due to Gelling of Lubricant (Dow Corning 550).Initially Reported on 910826 Via Telcon.Ler 2-91-005 Re ESF Actuations Caused by Transient Encl |
NRC Generic Letter 1991-09 | 27 June 1991 | NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
ML19354E565 | 24 January 1990 | LER 89-021-00:on 891225,electrical Protection Assembly Output Breakers Associated W/Bus a of Reactor Protection Sys Tripped Open.Cause of Trip Unknown.Voltage & Frequency Output of Motor Generator a monitored.W/900124 Ltr |
ML19354D895 | 16 January 1990 | LER 89-020-00:on 891217,relay in Reactor Protection Sys B Motor Generator Set Control Panel Burned Out,Resulting in Logic Trip of Bus B & Isolation of Standby Gas Treatment Sys.Caused by Circuit malfunction.W/900116 Ltr |
ML20247M191 | 25 May 1989 | Safety Evaluation Re Denial of Amend Request to Licenses DPR-71 & DPR-62 |
ML20246L186 | 16 March 1989 | Proposed Tech Specs to Incorporate Test Frequency Changes for Rosemount Analog Trip Unit Sys |
ML20246L179 | 16 March 1989 | Application for Amends to Licenses DPR-71 & DPR-62.Amends Revise Tech Specs to Incorporate Test Frequency Changes for Rosemount Analog Trip Unit Systems |
ML20196G888 | 3 March 1988 | Headquarters Daily Rept for 880303 |
ML20235Z199 | 27 August 1987 | Forwards Exam Comments for Exam Given on 870824 at Plant |