Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000324/202100211 August 2021Integrated Inspected Report 05000324/2021002 and 05000325/2021002
ML21034A6253 February 2021301 2A Exam Final Items (2 Year Delayed Release)
ML21015A01615 January 2021301 1A Final RO Written Exam (2-Year Delayed Release)
ML21015A02015 January 2021301 1A Final SRO Written Exam (2-Year Delayed Release)
IR 05000324/202000112 May 2020Integrated Inspection Report Report 05000324/2020001 and 05000325/2020001
ML17181A39530 June 2017Exam Final Items 2B - Delay Release
ML17017A38527 January 2017Final SRO Written Exam - Delay Release 2 Years
ML17012A30427 January 2017Final RO Written Exam - Delay Release 2 Yrs
IR 05000324/20160039 November 2016NRC Integrated Inspection Report 05000325/2016003 and 05000324/2016003 and Exercise of Enforcement Discretion
ML14350A13416 December 2014Initial Exam 2014-301 Draft Simulator Scenarios
ML14350A16116 December 2014Initial Exam 2014-301 Final Simulator Scenarios
ML13032A56229 January 2013Initial Exam 2012-301 Final Simulator Scenarios
ML13032A19829 January 2013Initial Exam 2012-301 Draft Simulator Scenarios
ML1110203186 April 2011Initial Exam 2010-302 Draft RO Written Exam
ML11024025324 January 2011Initial Exam 2010-302 Final RO Written Exam
ML1015900803 May 2010Initial Exam 2010-301 Draft Simulator Scenarios
ML1015900743 May 2010Initial Exam 2010-301 Draft RO Written Exam
ML1015900953 May 2010Initial Exam 2010-301 Final Administrative Documents
ML1015901733 May 2010Initial Exam 2010-301 Final Simulator Scenarios
ML10124085920 April 2010Initial Exam 2010-301 Final SRO Written Exam
ML10124084320 April 2010Initial Exam 2010-301 Final RO Written Exam
ML0833803593 December 2008November 2008 Exam 05000325, 324/2008302 - Final Combined Ro/Sro Written Exam with Kas, Answers, & References
ML09027003810 November 2008302 RO Written Exam
IR 05000324/200800330 July 2008IR 05000324-08-003, 05000325-08-003; 04/01/2008 - 06/30/2008; Brunswick Steam Electric Plant Unit 1 and Unit 2; Routine Baseline Inspection Report, Plant Modifications, Post Maintenance Testing, and Public Radiation Safety
ML08122030117 April 2008April 2008 Retake Exam 05000325/2008301 - Final RO Written Exam & Answer Key
ML07296048831 January 2007July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (4 of 4)
ML07297010231 January 2007July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 4 of 4) (Section 1 of 2)
IR 05000325/20033019 September 2002February 50-325/2003-301 Exam Draft Simulator Scenarios
BSEP-98-0178, Responds to NRC Re Violations Noted in Insp Repts 50-324/98-07 & 50-325/98-07.Corrective Actions:On 980505 Breaker Was Properly Tested & Returned to Service IAW 0PM-BKR00810 September 1998Responds to NRC Re Violations Noted in Insp Repts 50-324/98-07 & 50-325/98-07.Corrective Actions:On 980505 Breaker Was Properly Tested & Returned to Service IAW 0PM-BKR008
IR 05000324/199800711 August 1998Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
ML20237B92111 August 1998Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples
IR 05000324/19980051 June 1998Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support
ML20197A93725 February 1998Rev 4 to 0AP-025, Bnp Integrated Scheduling
ML20199J57114 November 1997Rev 3 to 0AP-025, Bnp Integrated Scheduling
ML20198F4101 August 1997Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000324/199700720 June 1997Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support
BSEP-95-0561, Application for Amends to Licenses DPR-62 & DPR-71,modifying RPS Electrical Protective Assemblies Channel Functional Test Surveillance Interval in TS SR 4.8.2.5.a,per GL 91-0915 November 1995Application for Amends to Licenses DPR-62 & DPR-71,modifying RPS Electrical Protective Assemblies Channel Functional Test Surveillance Interval in TS SR 4.8.2.5.a,per GL 91-09
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
ML20077B4154 November 1994Provides NRC W/Encl Exam Comments for Exam Given on 941024 at Plant
ML20118B02621 September 1992Responds to Violations Noted in Insp Repts 50-324/92-21 & 50-325/92-21.Corrective Actions:Mgt Directive Implemented Requiring Clearances to Be Hung on Test Boundary Isolation Valves Only & LLRT Procedure Test Lineup Revised
PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys5 February 1992PNO-II-92-007:on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys
ML20079G89227 August 1991Part 21 Rept Re Failure of Normally Energized Asco Model L206-832 Solenoid Valves Due to Gelling of Lubricant (Dow Corning 550).Initially Reported on 910826 Via Telcon.Ler 2-91-005 Re ESF Actuations Caused by Transient Encl
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
ML19354E56524 January 1990LER 89-021-00:on 891225,electrical Protection Assembly Output Breakers Associated W/Bus a of Reactor Protection Sys Tripped Open.Cause of Trip Unknown.Voltage & Frequency Output of Motor Generator a monitored.W/900124 Ltr
ML19354D89516 January 1990LER 89-020-00:on 891217,relay in Reactor Protection Sys B Motor Generator Set Control Panel Burned Out,Resulting in Logic Trip of Bus B & Isolation of Standby Gas Treatment Sys.Caused by Circuit malfunction.W/900116 Ltr
ML20247M19125 May 1989Safety Evaluation Re Denial of Amend Request to Licenses DPR-71 & DPR-62
ML20246L18616 March 1989Proposed Tech Specs to Incorporate Test Frequency Changes for Rosemount Analog Trip Unit Sys
ML20246L17916 March 1989Application for Amends to Licenses DPR-71 & DPR-62.Amends Revise Tech Specs to Incorporate Test Frequency Changes for Rosemount Analog Trip Unit Systems
ML20196G8883 March 1988Headquarters Daily Rept for 880303
ML20235Z19927 August 1987Forwards Exam Comments for Exam Given on 870824 at Plant