ML21214A101 | 3 August 2021 | Enclosure - Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Caisson Survey Units NOL01-09/NOL01-09-FSR Safety Evaluation Report |
HBL-20-011, Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR | 20 July 2020 | Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR |
ML21165A116 | 14 February 2018 | NX-503 Rev 0 Part 1 |
ML15093A336 | 31 March 2015 | Safstor/Decommissioning Offsite Dose Calculation Manual, Revision 22, Including Changes Made During 2012 |
ML14091A436 | 19 March 2014 | Annual Radioactive Effluent Release Report- January 1 Through December 31, 2013 |
HBL-13-004, ODCM, Revision 22, Volume 4, Safstor/Decommissioning Offsite Dose Calculation Manual. | 20 July 2012 | ODCM, Revision 22, Volume 4, Safstor/Decommissioning Offsite Dose Calculation Manual. |
ML12094A020 | 30 March 2012 | 8 of the Hbpp Safstor/Decommissioning Offsite Dose Calculation Manual (ODCM) |
HBL-12-003, Revision 9 to the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance Plan | 21 February 2012 | Revision 9 to the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance Plan |
HBL-10-011, Annual Radioactive Effluent Release Report for 2009 | 30 March 2010 | Annual Radioactive Effluent Release Report for 2009 |
HBL-10-005, Revision 8 to the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications Bases | 3 March 2010 | Revision 8 to the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications Bases |
ML091040716 | 12 January 2009 | Revision 15 to Safstor Offsite Dose Calculation Manual |
L-08-002, Independent Spent Fuel Storage Installation - Transmittal of Characterization of Spent Fuel | 24 April 2008 | Independent Spent Fuel Storage Installation - Transmittal of Characterization of Spent Fuel |
ML040860722 | 31 March 2004 | Defueled Safety Analysis Report, Revision 5 |
HBL-03-003, Annual Radioactive Effluent Release Report for 2002 | 28 March 2003 | Annual Radioactive Effluent Release Report for 2002 |
ML021000117 | 29 March 2002 | Annual Radioactive Effluent Release Report for 2001 from Pacific Gas & Electric Re Humboldt Bay Power Plant Unit 3 |
ML20205G918 | 31 December 1998 | Revs 1,1A & 2,Vol 4 to Safstor Odcm |
ML20205F423 | 31 December 1998 | Annual Facility Status & Survey Rept,For Jan-Dec 1998 |
IR 05000133/1998003 | 22 May 1998 | Insp Rept 50-133/98-03 on 980427-30.No Violations Noted. Major Areas Inspected:Decommissioning Performance & Status, Organization,Mgt & Cost Controls & Radioactive Waste Treatment,Effluents & Environ Monitoring |
ML20217P154 | 31 December 1997 | Annual Facility Status & Survey Rept for 970101-1231 |
ML20217P014 | 31 December 1997 | Annual Radioactive Effluent Release Rept,Jan-Dec 1997 |
ML20132C739 | 9 December 1996 | Rev 0 to Safstor Odcm |
Information Notice 1994-62, Operational Experience on Steam Generator Tube Leaks & Tube Ruptures | 30 August 1994 | Operational Experience on Steam Generator Tube Leaks & Tube Ruptures |
Information Notice 1994-43, Determination of Primary-to-Secondary Steam Generator Leak Rate | 10 June 1994 | Determination of Primary-to-Secondary Steam Generator Leak Rate |
Information Notice 1991-43, Recent Incidents Involving Rapid Increases in Primary-To-Secondary Leak Rate | 5 July 1991 | Recent Incidents Involving Rapid Increases in Primary-To-Secondary Leak Rate |
Information Notice 1988-99, Detection and Monitoring of Sudden And/Or Rapidly Increasing Primary-To-Secondary Leakage | 20 December 1988 | Detection and Monitoring of Sudden And/Or Rapidly Increasing Primary-To-Secondary Leakage |
IR 05000133/1987006 | 12 January 1988 | Insp Rept 50-133/87-06 on 871215-18.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Mgt Organization & Controls,Radwaste Mgt,Transportation, Followup on IE Info Notices & Followup on LER |
IR 05000133/1987002 | 19 June 1987 | Insp Rept 50-133/87-02 on 870602-05.Major Areas Inspected: Actions on Previous Findings,Fire Protection,Operator & Plant Radiation Protection Training & Qualification, Procedures,Operational Safety & Surveillance Procedures |
ML20206F892 | 30 June 1986 | Evaluation of Nuclear Facility Decommissioning Projects Status Report - Humboldt Bay Power Plant Unit 3 Safstor Decommissioning |
ML20138N784 | 30 October 1985 | Provides Info on 850911 Hearing in Eureka,Ca Re Disposal of Water Containing Dissolved Chromium & Low Level Radioactive Matls,In Response to 850901 Request from Constituent J Rossman |
HBL-85-047, Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ Plan | 7 October 1985 | Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ Plan |
ML20215N495 | 31 July 1985 | Extended Fuel Storage in Existing Onsite Humboldt Bay, Unit 3,Storage Pool |
ML20125C994 | 31 December 1984 | Forwards Comments Re Tech Specs for Possession Only License. Opportunity for Further Comment Prior to Issuance of License & Tech Specs Requested.Related Documents Encl |
ML20125C972 | 10 September 1984 | Transcript of ACRS Subcommittees on Humboldt Bay Project & Reactor Radiological Effects 840910 Meeting in Eureka,Ca Re Review of Util Decommissioning Plan.Pp 1-144 |