Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23312A183 | 14 November 2023 | Integrated Inspection Report 05000382/2023003 and Notice of Violation |
IR 05000382/2023001 | 24 April 2023 | Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion |
IR 05000382/2022013 | 28 November 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 |
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt | 1 October 2021 | Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt |
W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 052 | 18 August 2021 | (Waterford 3) - Emergency Plan Revision 052 |
ML21175A287 | 14 July 2021 | Updated NRC Staff Draft White Paper Analysis of Applicability of NRC Regulations for Non-LWRs |
ML21082A302 | 19 May 2021 | Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
W3F1-2021-0035, Technical Requirements Manual Update | 18 May 2021 | Technical Requirements Manual Update |
W3F1-2021-0024, Emergency Preparedness Documents | 11 March 2021 | Emergency Preparedness Documents |
W3F1-2020-0062, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | 15 December 2020 | Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 |
ML20267A207 | 26 August 2020 | 08 Draft Written Exam |
ML20267A212 | 26 August 2020 | Examination Inspection Report 05000382/2020008 Final Written Exam |
W3F1-2020-0007, (Waterford 3) - Emergency Plan Revision 051 | 6 February 2020 | (Waterford 3) - Emergency Plan Revision 051 |
ML20258A071 | 11 September 2019 | 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted |
ML20258A088 | 11 September 2019 | 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted |
ML20258A087 | 11 September 2019 | 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted |
W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across | 19 January 2019 | (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across |
ML18323A103 | 30 November 2018 | NUREG-1437, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Steam Electric Station, Unit 3 - Final Report |
ML18207A274 | 8 August 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident |
ML20255A239 | 25 July 2018 | 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted |
ML20255A242 | 25 July 2018 | 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted |
ML20255A218 | 25 July 2018 | 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted |
W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | 17 May 2018 | (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update |
ML18127B723 | 14 May 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 |
ML18109A606 | 19 April 2018 | (Waterford 3) - Annual Radiological Environmental Operating Report for 2017 |
ML17311B351 | 30 November 2017 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism Reevaluation |
W3F1-2017-0037, Annual Radiological Environmental Operating Report - 2016 | 24 April 2017 | Annual Radiological Environmental Operating Report - 2016 |
ML17128A179 | 30 March 2017 | Emergency Plan, Revision 048 |
ML17045A148 | 3 March 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
IR 05000382/2016004 | 20 January 2017 | NRC Integrated Inspection Report 05000382/2016004 and 0720075/2016001 |
W3F1-2017-0003, Responses to Request for Additional Information Set 10 Regarding the License Renewal Application | 19 January 2017 | Responses to Request for Additional Information Set 10 Regarding the License Renewal Application |
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | 20 December 2016 | Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 |
W3F1-2016-0075, Responses to Request for Additional Information Set 6 Regarding the License Renewal Application | 7 December 2016 | Responses to Request for Additional Information Set 6 Regarding the License Renewal Application |
ML16287A675 | 13 October 2016 | Responses to Request for Additional Information Set 1 Regarding the License Renewal Application |
ML16256A452 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.5 |
ML16256A184 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7, Figures 3.7-1 Through 3.7-36 |
ML16256A154 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.5, Figures 2.5-1 Through 2.5-118 |
ML16344A051 | 25 August 2016 | Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.4 |
ML16256A201 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.6 - Protection Against Dynamic Effects Associated with Postulated Rupture of Piping |
ML16256A457 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.3 |
ML16256A121 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Table of Contents |
ML16256A436 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 8, Electric Power, Section 8.3 |
ML16256A153 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.5 |
ML16256A186 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8 - Design of Category I Structures |
ML16256A203 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7 - Seismic Design |
ML16256A273 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.2 |
ML16256A197 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.7A - Sesmic Design - Parametric Studies |
ML16256A195 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6A - Pipe Rupture Analysis |
ML16256A189 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.9A - Seismic Considerations for Equipment Specifications |
ML16256A287 | 25 August 2016 | Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.5 |