Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23173A03310 April 20239 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted
ML23173A01310 April 20239 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted
ML23173A04010 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted
ML23173A05910 April 20239 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted
ML23110A16310 April 20239 to Updated Final Safety Analysis Report, Appendix K, Exhibit V, Seismic Analysis of Reactor Vessel
ML23172A28110 April 20239 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted
ML23173A01710 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted
ML23173A03810 April 20239 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted
ML23110A25710 April 20239 to Updated Final Safety Analysis Report, Chapter 5, Containment
ML23173A03710 April 20239 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted
ML23172A27010 April 20239 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System - Redacted
ML23173A05710 April 20239 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted
ML23110A21610 April 20239 to Updated Final Safety Analysis Report, Appendix K, Exhibit I, Reactor Pressure Vessel Purchase Specification 21A1111
ML23173A04310 April 20239 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted
ML23110A18010 April 20239 to Updated Final Safety Analysis Report, Chapter 2, Site, Table of Contents
ML23173A05610 April 20239 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted
ML23110A19710 April 20239 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
ML23110A21910 April 20239 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Sections 1 Thru 8
ML23110A20210 April 20239 to Updated Final Safety Analysis Report, Chapter 9, Radioactive Waste Systems, Sections 1 Thru 4
ML23110A21410 April 20239 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Table of Contents and List of Tables and Figures
ML23172A28410 April 20239 to Updated Final Safety Analysis Report, Appendix C, Table of Contents - Redacted
ML23173A02510 April 20239 to Updated Final Safety Analysis Report, Appendix R, Second License Renewal UFSAR Supplement, Pages R-1 to R-89 - Redacted
ML23110A25610 April 20239 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML23110A20310 April 20239 to Updated Final Safety Analysis Report, Appendix M, Table of Contents
ML23062A4263 March 20238 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Through 8 (Redacted)
ML23062A4193 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted)
ML23062A2203 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23 (Redacted)
ML23062A4203 March 20238 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 Thru 24 (Redacted)
ML23062A2143 March 20238 to Updated Final Safety Analysis Report, Appendix C, Figures C.2.1 Through C.3.12L (Redacted)
ML23062A2163 March 20238 to Updated Final Safety Analysis Report, Chapter 12, Sections 1 Through 4 (Redacted)
ML23062A4173 March 20238 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns (Redacted)
ML23062A4303 March 20238 to Updated Final Safety Analysis Report, Chapter 2, Sections 1 Through 9. (Redacted)
ML23062A4273 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9 (Redacted)
ML23062A2193 March 20238 to Updated Final Safety Analysis Report, Chapter 4, Sections 1 Through 11 (Redacted)
ML23062A2153 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria, Table of Contents. (Redacted)
ML23062A2133 March 20238 to Updated Final Safety Analysis Report, Appendix R, Second License Renewal UFSAR Supplement, Pages R-1 to R-89 (4-22-20) (Redacted)
ML23062A4283 March 20238 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted)
ML23062A4293 March 20238 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts (Redacted)
IR 05000482/202100419 January 2022Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002
IR 05000482/20210035 November 2021Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch
ML21074A41114 May 2021Issuance of Amendment Nos. 338 and 341, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4B
ML21109A1068 April 20218 to Updated Final Safety Analysis Report, Chapter 1, Sections 1 Through 15
ML21109A0628 April 20218 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Table of Contents
ML21109A0678 April 20218 to Updated Final Safety Analysis Report, Chapter 3, Sections 1 Through 8
ML21109A0648 April 20218 to Updated Final Safety Analysis Report, Appendix K, Exhibit I, Reactor Pressure Vessel Purchase Specification 21A1111
ML21109A0468 April 20218 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
ML21109A1078 April 20218 to Updated Final Safety Analysis Report, Chapter 5, Sections 1 Thru 3
ML21109A0518 April 20218 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Through 4
ML21109A0178 April 20218 to Updated Final Safety Analysis Report, Appendix K, Exhibit V, Seismic Analysis of Reactor Vessel
ML21109A0328 April 20218 to Updated Final Safety Analysis Report, Chapter 2, Site, Table of Contents