Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX |
IR 05000269/2023003 | 14 November 2023 | Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion |
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 2022 | 26 April 2023 | Duke Energy Annual Radiological Environmental Operating Report - 2022 |
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 4 April 2023 | License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
ML22349A145 | 19 December 2022 | Non-Proprietary Safety Evaluation Related to the SLRA of Oconee Nuclear Station, Units 1, 2, and 3 |
RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations | 27 October 2022 | Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations |
RA-22-0082, and Independent Spent Fuel Storage Installation, 2021 ISFSI Annual Effluent Release Report | 28 February 2022 | and Independent Spent Fuel Storage Installation, 2021 ISFSI Annual Effluent Release Report |
ML22045A053 | 14 February 2022 | SLRA - Audit Report |
ML22042B286 | 11 February 2022 | Memorandum and Order (Denying Intervention and Terminating Proceeding) (LBP-22-01) |
ML21323A160 | 19 November 2021 | Transcript of Duke Energy Carolinas, Evidentiary Hearing, November 16, 2021 |
ML21270A250 | 27 September 2021 | Hearing Request and Petition to Intervene by Beyond Nuclear and Sierra Club and Petition for Waiver |
ML21155A213 | 26 August 2021 | Plant |
RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 8 | 7 June 2021 | Application for Subsequent Renewed Operating Licenses. Part 7 of 8 |
ML21158A196 | 7 June 2021 | Application for Subsequent Renewed Operating Licenses. Part 3 of 8 |
ML21158A195 | 7 June 2021 | Application for Subsequent Renewed Operating Licenses. Part 2 of 8 |
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 11 March 2021 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan |
RA-21-0074, Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 2020 ISFSI Annual Effluent Release Report | 25 February 2021 | Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 2020 ISFSI Annual Effluent Release Report |
ML21047A241 | 16 February 2021 | DPO-2019-001, Redacted Differing Professional Opinion (DPO) Case File (Public) |
ML20304A369 | 17 November 2020 | Documentation of the Completion of Required Action Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident |
IR 05000269/2020003 | 4 November 2020 | Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 |
ML20233A815 | 20 August 2020 | 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf |
ML20189A098 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML20189A083 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards |
ML20189A095 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML20189A077 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML20189A103 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations |
ML20189A072 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Tables |
ML20189A071 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML20189A092 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20189A080 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML20181A118 | 29 June 2020 | Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report |
ML20189A074 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML20189A075 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables |
ML20189A073 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures |
RA-20-0036, Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping | 2 March 2020 | Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping |
RA-19-0144, License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 19 February 2020 | License Amendment Request for Measurement Uncertainty Recapture Power Uprate |
ML19260E084 | 31 October 2019 | Issuance of Amendments 415, 417, and 416, Regarding the Updated Final Safety Analysis Report Description of Tornado Mitigation |
RA-19-0383, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program | 3 October 2019 | Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program |
ML19274B077 | 30 September 2019 | Non- Concurrence Process - Oconee Nuclear Station, Units 1, 2, and 3, Issuance of Amendments Regarding the Physical Security Plan |
RA-19-0253, Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building | 28 August 2019 | Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building |
RA-19-0301, Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information | 31 July 2019 | Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information |
ML19058A632 | 1 July 2019 | Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs |
ML19168A084 | 26 June 2019 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 |
RA-18-0280, Submittal of Ufsar/Selected Licensee Commitment Changes | 21 June 2019 | Submittal of Ufsar/Selected Licensee Commitment Changes |
RA-19-0226, 2018 Annual Radiological Environmental Operating Report (AREOR) | 15 May 2019 | 2018 Annual Radiological Environmental Operating Report (AREOR) |
ML18311A134 | 17 December 2018 | Non Proprietary - Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for the Standby Shutdown Facility |
IR 05000269/2018003 | 2 November 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000269/2018003, 05000270/2018003, and 05000287/2018003 |
RA-18-0026, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Sections Associated with the Oconee Tornado Licensing Basis | 14 September 2018 | Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Sections Associated with the Oconee Tornado Licensing Basis |
ML18197A201 | 25 July 2018 | Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementation Near- Task Force Recommendation 2.1: Seismic |
ML18192A500 | 29 June 2018 | Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 27 |