Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan | 4 December 2023 | Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan |
IR 05000341/2023003 | 7 November 2023 | Integrated Inspection Report 05000341/2023003 and 07200071/2023001 |
ML23297A051 | 30 October 2023 | Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) |
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 |
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 28 September 2023 | Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating |
ML23243A885 | 18 September 2023 | Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) |
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 10 August 2023 | Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
IR 05000341/2022004 | 22 June 2023 | Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004 |
IR 05000341/2022010 | 21 June 2023 | Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 |
NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval | 5 June 2023 | Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval |
NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | 28 April 2023 | Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report |
ML22325A124 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides |
ML22325A125 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML22325A130 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML22325A131 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML22325A132 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML22325A133 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML22325A134 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22325A135 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22325A136 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities |
ML22325A138 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22325A144 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML22325A142 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML22325A139 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
NRC-21-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | 28 April 2021 | Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report |
ML21055A075 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Appendix-B, Aging Management Programs and Activities |
ML21055A073 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21055A076 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21055A078 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML21055A080 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML21055A072 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21055A070 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML21055A069 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML21055A067 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML21055A066 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML21055A062 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML21055A061 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Appendix A.1, Division 1 Applicable Regulatory Guides |
ML22158A212 | 14 January 2021 | Fer 2020 Ile Administered-Scenarios 1 and 2 |
ML22158A215 | 14 January 2021 | Fer 2020 Ile Administered-Written Exam and Handouts |
NRC-20-0068, Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Biennial Review of the Fermi 1 Safety Analysis Report | 25 November 2020 | Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Biennial Review of the Fermi 1 Safety Analysis Report |
IR 05000341/2020003 | 3 November 2020 | Integrated Inspection Report 05000341/2020003 |
ML22158A333 | 3 November 2020 | Fer 2020 Ile Proposed-Scenarios 1 and 2 Final |
ML20217L633 | 14 August 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
ML22158A354 | 21 July 2020 | Fer 2020 ILE-Scenarios 1 and 2 D1s Final |
NRC-20-0005, Submittal of Revision 49 to the Fermi 2 Radiological Emergency Response Preparedness Plan | 13 January 2020 | Submittal of Revision 49 to the Fermi 2 Radiological Emergency Response Preparedness Plan |
ML19183A023 | 31 July 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
IR 05000341/2019012 | 29 July 2019 | Design Basis Assurance Inspection (Teams); Inspection Report 05000341/2019012 (DRS-N.Feliz-Adorno) |
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 14 December 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML18173A165 | 19 July 2018 | Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7828; EPID L-2016-JLD-0006) |
ML18144A064 | 17 July 2018 | Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink |