Semantic search

Jump to navigation Jump to search
 Issue dateTitle
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan4 December 2023Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan
IR 05000341/20230037 November 2023Integrated Inspection Report 05000341/2023003 and 07200071/2023001
ML23297A05130 October 2023Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances)
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 19 October 2023Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating28 September 2023Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating
ML23243A88518 September 2023Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances)
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)10 August 2023Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
IR 05000341/202200422 June 2023Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004
IR 05000341/202201021 June 2023Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010
NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval5 June 2023Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval
NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report28 April 2023Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report
ML22325A12417 November 20224 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides
ML22325A12517 November 20224 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22325A13017 November 20224 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML22325A13117 November 20224 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML22325A13217 November 20224 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML22325A13317 November 20224 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22325A13417 November 20224 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22325A13517 November 20224 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22325A13617 November 20224 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities
ML22325A13817 November 20224 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22325A14417 November 20224 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML22325A14217 November 20224 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML22325A13917 November 20224 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
NRC-21-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report28 April 2021Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report
ML21055A0752 February 20213 to Updated Final Safety Analysis Report, Appendix-B, Aging Management Programs and Activities
ML21055A0732 February 20213 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML21055A0762 February 20213 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML21055A0782 February 20213 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML21055A0802 February 20213 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML21055A0722 February 20213 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21055A0702 February 20213 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML21055A0692 February 20213 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML21055A0672 February 20213 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML21055A0662 February 20213 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML21055A0622 February 20213 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21055A0612 February 20213 to Updated Final Safety Analysis Report, Appendix A.1, Division 1 Applicable Regulatory Guides
ML22158A21214 January 2021Fer 2020 Ile Administered-Scenarios 1 and 2
ML22158A21514 January 2021Fer 2020 Ile Administered-Written Exam and Handouts
NRC-20-0068, Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Biennial Review of the Fermi 1 Safety Analysis Report25 November 2020Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Biennial Review of the Fermi 1 Safety Analysis Report
IR 05000341/20200033 November 2020Integrated Inspection Report 05000341/2020003
ML22158A3333 November 2020Fer 2020 Ile Proposed-Scenarios 1 and 2 Final
ML20217L63314 August 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML22158A35421 July 2020Fer 2020 ILE-Scenarios 1 and 2 D1s Final
NRC-20-0005, Submittal of Revision 49 to the Fermi 2 Radiological Emergency Response Preparedness Plan13 January 2020Submittal of Revision 49 to the Fermi 2 Radiological Emergency Response Preparedness Plan
ML19183A02331 July 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109
IR 05000341/201901229 July 2019Design Basis Assurance Inspection (Teams); Inspection Report 05000341/2019012 (DRS-N.Feliz-Adorno)
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
ML18173A16519 July 2018Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7828; EPID L-2016-JLD-0006)
ML18144A06417 July 2018Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink