Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23319A065 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML23319A067 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System |
ML23319A080 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML23319A069 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control |
ML23319A066 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML23319A071 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML23319A064 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
IR 05000348/2023010 | 29 June 2023 | Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 |
NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis | 21 September 2022 | License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis |
IR 05000348/2022002 | 12 August 2022 | Integrated Inspection Report 05000348/2022002 and 05000364/2022002 |
IR 05000348/2021003 | 10 November 2021 | Integrated Inspection Report 05000348/2021003, 05000364/2021003, and 07200042/2021001 |
ML21313A330 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML21313A335 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Redacted) |
ML21313A327 | 28 October 2021 | 0, Technical Specification Bases |
ML21313A336 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML21313A324 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control |
ML21313A328 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System |
ML21313A320 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML21313A322 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (Redacted) |
ML21313A318 | 28 October 2021 | 0 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
NL-21-0019, Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 2 March 2021 | Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML20342A206 | 7 December 2020 | 2A-2 Final Op Test Items - Delayed Release |
ML20121A283 | 9 October 2020 | Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate |
ML20132A207 | 8 May 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version |
ML20125A206 | 28 April 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 1 of 2 |
ML20125A207 | 28 April 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 2 of 2 |
ML20125A210 | 28 April 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power, Chapter 9, Auxiliary Systems, and Chapter 10, Steam and Power Conversion System |
ML20125A209 | 28 April 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, and Chapter 7, Instrumentation and Control |
ML20125A208 | 28 April 2020 | 9 to the Updated Final Safety Analysis Report, Chapter 4 ,Reactor, and Chapter 5, Reactor Coolant System and Connected System |
ML20125A212 | 28 April 2020 | Revisions to Technical Specification Bases Changes |
NL-19-0796, WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version) | 30 September 2019 | WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version) |
ML19175A243 | 23 August 2019 | Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A |
ML18334A228 | 10 December 2018 | Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03 |
ML18312A070 | 30 October 2018 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Part 1 |
ML18312A072 | 30 October 2018 | Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor and Chapter 5, Reactor Coolant System and Connected System |
ML18312A071 | 30 October 2018 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Part 2 |
ML18331A123 | 30 October 2018 | UFSAR Rev, 28, Chapter 1 and 2 Redacted Version |
ML18312A077 | 30 October 2018 | Technical Specifications Bases |
ML18278A280 | 10 October 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 |
ML18249A109 | 20 September 2018 | Documentation of the Completion of Required Actions Taken in Response to Fukushima Lessons Learned |
NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... | 27 July 2018 | License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... |
ML18226A095 | 10 April 2018 | Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis |
NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis | 10 April 2018 | Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis |
ML18065A025 | 6 March 2018 | Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures |
IR 05000348/2017004 | 12 February 2018 | NRC Integrated Inspection Report 05000348/2017004 and 05000364/2017004 |
ML17271A265 | 20 December 2017 | Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) |
NL-17-0480, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information | 22 June 2017 | License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information |
ML17090A457 | 24 April 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders Ea-12-049 and Ea-12-051 (CAC Nos. MF0716, MF0717, MF1429, and MF1430) |
ML17139C013 | 20 April 2017 | Updated Final Safety Analysis Report, Revision 27, Effective Page Listing, Table of Contents, Chapter 1 Redacted, Introduction and General Description of the Plant |
ML17117A368 | 20 April 2017 | Updated Final Safety Analysis Report, Revision 27, Chapter 3, Part 2 |