Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23319A06531 October 20231 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23319A06731 October 20231 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System
ML23319A08031 October 20231 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML23319A06931 October 20231 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML23319A06631 October 20231 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML23319A07131 October 20231 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML23319A06431 October 20231 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
IR 05000348/202301029 June 2023Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010
NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis21 September 2022License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis
IR 05000348/202200212 August 2022Integrated Inspection Report 05000348/2022002 and 05000364/2022002
IR 05000348/202100310 November 2021Integrated Inspection Report 05000348/2021003, 05000364/2021003, and 07200042/2021001
ML21313A33028 October 20210 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML21313A33528 October 20210 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Redacted)
ML21313A32728 October 20210, Technical Specification Bases
ML21313A33628 October 20210 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21313A32428 October 20210 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML21313A32828 October 20210 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System
ML21313A32028 October 20210 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML21313A32228 October 20210 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (Redacted)
ML21313A31828 October 20210 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
NL-21-0019, Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2 March 2021Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML20342A2067 December 20202A-2 Final Op Test Items - Delayed Release
ML20121A2839 October 2020Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate
ML20132A2078 May 20209 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version
ML20125A20628 April 20209 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 1 of 2
ML20125A20728 April 20209 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 2 of 2
ML20125A21028 April 20209 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power, Chapter 9, Auxiliary Systems, and Chapter 10, Steam and Power Conversion System
ML20125A20928 April 20209 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, and Chapter 7, Instrumentation and Control
ML20125A20828 April 20209 to the Updated Final Safety Analysis Report, Chapter 4 ,Reactor, and Chapter 5, Reactor Coolant System and Connected System
ML20125A21228 April 2020Revisions to Technical Specification Bases Changes
NL-19-0796, WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version)30 September 2019WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version)
ML19175A24323 August 2019Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A
ML18334A22810 December 2018Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03
ML18312A07030 October 2018Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Part 1
ML18312A07230 October 2018Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor and Chapter 5, Reactor Coolant System and Connected System
ML18312A07130 October 2018Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Part 2
ML18331A12330 October 2018UFSAR Rev, 28, Chapter 1 and 2 Redacted Version
ML18312A07730 October 2018Technical Specifications Bases
ML18278A28010 October 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018
ML18249A10920 September 2018Documentation of the Completion of Required Actions Taken in Response to Fukushima Lessons Learned
NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...27 July 2018License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...
ML18226A09510 April 2018Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis
NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis10 April 2018Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis
ML18065A0256 March 2018Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures
IR 05000348/201700412 February 2018NRC Integrated Inspection Report 05000348/2017004 and 05000364/2017004
ML17271A26520 December 2017Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019)
NL-17-0480, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information22 June 2017License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information
ML17090A45724 April 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders Ea-12-049 and Ea-12-051 (CAC Nos. MF0716, MF0717, MF1429, and MF1430)
ML17139C01320 April 2017Updated Final Safety Analysis Report, Revision 27, Effective Page Listing, Table of Contents, Chapter 1 Redacted, Introduction and General Description of the Plant
ML17117A36820 April 2017Updated Final Safety Analysis Report, Revision 27, Chapter 3, Part 2