Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000237/2022002 | 8 August 2022 | Integrated Inspection Report 05000237/2022002; 05000249/2022002 and 07200037/2022002 and Exercise of Enforcement Discretion |
RS-22-082, Defueled Safety Analysis Report Update, Revision 11 | 22 June 2022 | Defueled Safety Analysis Report Update, Revision 11 |
RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | 8 June 2022 | License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 |
IR 05000237/2021004 | 7 February 2022 | Integrated Inspection Report 05000237/2021004 and 05000249/2021004 |
ML21196A008 | 15 July 2021 | Redacted - Dresden, Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML21179A027 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21179A028 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML21179A031 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 8, Electrical Power |
ML21179A032 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21179A034 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21179A038 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21076A439 | 17 March 2021 | Attachment 1 - Requests for Exemptions from Portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2) and 10 CFR 50, Appendix E |
RS-21-021, License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition | 17 March 2021 | License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition |
ML21076A438 | 17 March 2021 | Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E |
ML20300A235 | 17 November 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident |
ML20307A445 | 2 November 2020 | Attachment 3 - Proposed Revision to Site Emergency Plan |
ML20307A455 | 2 November 2020 | Attachment 3 - Proposed Revision to Site Emergency Plan, Exhibit B, Radiological Emergency Plan Annex for Dresden Station (Procedure EP-AA-1004) |
ML20307A434 | 2 November 2020 | License Amendment Request - Proposed Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition |
ML20307A328 | 31 October 2020 | Attachment 3 - Standardized Radiological Emergency Plan Revision EP-BY-1000, Revision 0, Byron Station Radiological Emergency Plan |
ML20307A331 | 31 October 2020 | Attachment 5 - Standardized Radiological Emergency Plan Revision EP-DR-1000, Revision 0, Dresden Station Radiological Emergency Plan |
ML20265A240 | 23 October 2020 | Issuance of Amendment Nos. 272 and 265 to Increase Allowable Main Steam Isolation Valve Leakage |
IR 05000237/2020002 | 10 August 2020 | Integrated Inspection Report 05000237/2020002; 05000249/2020002; and 07200037/2020001 |
SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 | 2 July 2020 | Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 |
RS-20-070, Defueled Safety Analysis Report Update, Revision 10 | 22 June 2020 | Defueled Safety Analysis Report Update, Revision 10 |
ML20105A507 | 5 June 2020 | SPRA Report Staff Assessment |
RS-20-038, Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance | 6 May 2020 | Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance |
ML19331A725 | 14 February 2020 | Issuance of Amendments Revising Emergency Action Levels |
RS-19-101, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... | 30 October 2019 | Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... |
RS-19-067, Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, Figures | 21 June 2019 | Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, Figures |
ML19162A175 | 6 June 2019 | 10 CFR 50.54(q)(5) Procedure Change Summary Analysis |
ML19010A090 | 19 December 2018 | NRR E-mail Capture - Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima. |
NRC-2018-0138, Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima. | 19 December 2018 | Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima. |
ML18254A367 | 29 October 2018 | County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers |
ML18236A262 | 17 September 2018 | Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal |
RS-18-077, Defueled Safety Analysis Report Update, Revision 9 | 20 June 2018 | Defueled Safety Analysis Report Update, Revision 9 |
RS-18-053, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal | 4 May 2018 | Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal |
ML18079A382 | 27 April 2018 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
ML18065A204 | 6 March 2018 | Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. |
RS-18-022, Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | 14 February 2018 | Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. |
RS-17-170, Company Emergency Plan Annex and Addendum Revisions | 19 December 2017 | Company Emergency Plan Annex and Addendum Revisions |
ML17191A300 | 10 July 2017 | Final Safety Analysis Report |
ML17184A009 | 10 July 2017 | Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) |
ML17191A301 | 10 July 2017 | Final Safety Analysis Report |
ML17177A446 | 6 July 2017 | Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force |
ML18079B036 | 21 June 2017 | Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics |
RS-17-082, Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics | 21 June 2017 | Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics |
ML17124A389 | 4 May 2017 | 2016 Dresden Nuclear Station Initial License Examination Proposed Operating Test |
ML17037C929 | 16 February 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
RS-16-245, Radiological Emergency Plan Revisions | 9 December 2016 | Radiological Emergency Plan Revisions |
ML16337A127 | 1 December 2016 | 2016 Dresden Nuclear Station Initial License Examination Outline Files - Form ES-D-1 |