Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML023380388 | 26 November 2002 | Defueled Safety Analysis Report, Amendment 5 |
ML20155D480 | 27 October 1998 | Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode |
Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities | 4 October 1993 | Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities |
Information Notice 1993-78, Inoperable Safety Systems at a Non-Power Reactor | 4 October 1993 | Inoperable Safety Systems at a Non-Power Reactor |
Information Notice 1993-79, Core Shroud Cracking at Beltline Region Welds in Boiling-Water Reactors | 30 September 1993 | Core Shroud Cracking at Beltline Region Welds in Boiling-Water Reactors |
Information Notice 1993-76, Inadequate Control of Paint and Cleaners for Safety-Related Equipment | 21 September 1993 | Inadequate Control of Paint and Cleaners for Safety-Related Equipment |
Information Notice 1993-75, Spurious Tripping of Low-Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units | 17 September 1993 | Spurious Tripping of Low-Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units |
Information Notice 1993-74, High Temperatures Reduce Limitorque AC Motor Operator Torque | 16 September 1993 | High Temperatures Reduce Limitorque AC Motor Operator Torque |
Information Notice 1993-73, Criminal Prosecution of Nuclear Suppliers for Wrongdoing | 15 September 1993 | Criminal Prosecution of Nuclear Suppliers for Wrongdoing |
Information Notice 1993-72, Observations from Recent Shutdown Risk and Outage Management Pilot Team Inspections | 14 September 1993 | Observations from Recent Shutdown Risk and Outage Management Pilot Team Inspections |
Information Notice 1993-71, Fire at Chernobyl Unit 2 | 13 September 1993 | Fire at Chernobyl Unit 2 |
NRC Generic Letter 1992-09 | 31 December 1992 | NRC Generic Letter 1992-009: Limited Participation by NRC in IAEA International Nuclear Event Scale |
ML20247B134 | 12 May 1989 | Forwards State of CA 1987 Environ Radiological Measurements Rept,Per Cooperative Agreement NRC-32-83-684.No Outstanding Concerns Identified in Data Comparisions Between Util & State Measurements |
ML20196B502 | 20 May 1988 | Requests Comments on Encl B Moller Re Radioactive Water Release from Subj Plant |
ML20148H363 | 23 March 1988 | Responds to Forwarding B Moller Petition Requesting That Facility Not Be Restarted Until Complete Check of All Cables Undertaken. B Moller Request Denied Based on Reasons Set Forth in Encl Director'S Decision |
ML20151W768 | 18 February 1988 | Discusses Failure of Smud to Keep Pledge to Ratepayers to Go Beyond Minimal Get by Commitment of Mgt in Past to Be Thorough & Complete in Exploring All Possible Problems at Facility |
ML20195J057 | 31 December 1987 | Annual Radiological Environ Operating Rept,1987 |
ML20235Z291 | 9 July 1987 | Revised Restart Rept for Rancho Seco Nuclear Generating Station Following 851226 Overcooling Event |
ML20211Q472 | 15 December 1986 | Restart Rept for Rancho Seco Nuclear Generating Station Following 851226 Overcooling Event |
IR 05000312/1986020 | 23 June 1986 | Insp Rept 50-312/86-20 on 860602-06.No Violation or Deviation Noted.Major Areas Inspected:External Occupational Exposure Control,Radiation Protection,Chemistry,Radwaste & Environ Qualifications & IE Info Notices |
Information Notice 1986-46, Improper Cleaning and Decontamination of Respiratory Protection Equipment | 12 June 1986 | Improper Cleaning and Decontamination of Respiratory Protection Equipment |
Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches | 10 June 1986 | Erratic Behavior of Static O Ring Differential Pressure Switches |
Information Notice 1986-43, Problems with Silver Zeolite Sampling of Airborne Radioiodine | 10 June 1986 | Problems with Silver Zeolite Sampling of Airborne Radioiodine |
Information Notice 1986-44, Failure to Follow Procedures When Working in High Radiation Areas | 10 June 1986 | Failure to Follow Procedures When Working in High Radiation Areas |
Information Notice 1986-41, Evaluation of Questionable Exposure Readings of Licensee Personnel Dosimeters | 9 June 1986 | Evaluation of Questionable Exposure Readings of Licensee Personnel Dosimeters |
Information Notice 1986-42, Improper Maintenance of Radiation Monitoring Systems | 9 June 1986 | Improper Maintenance of Radiation Monitoring Systems |
Information Notice 1986-40, Degraded Ability to Isolate the Reactor Coolant System from Low-Pressure Coolant Systems in Bwrs | 5 June 1986 | Degraded Ability to Isolate the Reactor Coolant System from Low-Pressure Coolant Systems in Bwrs |
Information Notice 1986-40, Degraded Ability to Isolate the Reactor Coolant System from Low-Pressure Coolant Systems in BWRs | 5 June 1986 | Degraded Ability to Isolate the Reactor Coolant System from Low-Pressure Coolant Systems in BWRs |
Information Notice 1986-38, Deficient Operator Actions Following Dual Function Valve Failures | 20 May 1986 | Deficient Operator Actions Following Dual Function Valve Failures |
Information Notice 1986-39, Failures of RHR Pump Motors and Pump Internals | 20 May 1986 | Failures of RHR Pump Motors and Pump Internals |
Information Notice 1986-36, Change in NRC Practice Regarding Issuance of Confirming Letters to Principal Contractors | 16 May 1986 | Change in NRC Practice Regarding Issuance of Confirming Letters to Principal Contractors |
Information Notice 1986-37, Degradation of Station Batteries | 16 May 1986 | Degradation of Station Batteries |
Information Notice 1986-35, Fire in Compressible Material at Dresden Unit 3 | 15 May 1986 | Fire in Compressible Material at Dresden Unit 3 |
Information Notice 1986-32, Request for Collection of Licensee Radioactivity Measurements Attributed to Chernobyl Nuclear Plant Accident | 2 May 1986 | Request for Collection of Licensee Radioactivity Measurements Attributed to Chernobyl Nuclear Plant Accident |