Issue date | Title | |
---|---|---|
ML20217L633 | 14 August 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
ML17072A408 | 13 March 2017 | NRR E-mail Capture - NRC Issuance of an Expedited Amendment Associated with Emergency Core Cooling System |
ML16230A613 | 17 August 2016 | NRR E-mail Capture - Fermi 2 - NRC Issuance of Amendment Associated with Surveillance Requirement (SR) 3.5.1.4 |
ML16011A014 | 5 January 2016 | Comment (21) of Kevin Kamps Opposing Fermi 2 License Renewal |
ML16011A015 | 5 January 2016 | Comment (22) of Michael J Keegan Opposing Fermi 2 License Renewal Application Draft Supplemental Environmental Impact Statement |
ML16011A008 | 1 January 2016 | Comment (14) of Art Myatt Opposing the Construction of Fermi 3 and the Relicensing of Fermi 2 for the 2025-2045 Timeframe |
ML16011A030 | 28 December 2015 | Comment (37) of David Schonberger on Behalf of Alliance to Halt Fermi 3 on DTE Electric Company; Fermi 2 Nuclear Power Plant; Issuance of Draft Environmental Impact Statement |
ML15174A257 | 1 September 2015 | Letter to Licensees Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events |
ML15155B416 | 14 July 2015 | Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 |
ML15049A153 | 17 February 2015 | Speech-S-15-001: Prepared Remarks of NRC Chairman Stephen G. Burns Platts 11th Annual Nuclear Energy Conference February 17, 2015- Washington, D.C |
ML15037A618 | 6 February 2015 | Memorandum and Order (Ruling on Petitions to Intervene and Requests for a Hearing) LBP-15-5 |
ML14330A259 | 20 November 2014 | Transcript of Oral Arguments in the Matter of Fermi Nuclear Power Plant, Unit 2, Monroe, Michigan on November 20, 2014, Pages 1-233 |
ML14255A474 | 12 September 2014 | Applicant DTE Electric Company Answer Opposing Petitions to Intervene |
ML14245A386 | 29 August 2014 | NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014) |
ML14230B040 | 18 August 2014 | Petition for Leave to Intervene and Request for Hearing of Don'T Waste Michigan, Citizens Environment Alliance of Southwestern Ontario and Beyond Nuclear |
ML14111A147 | 9 May 2014 | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights |
ML14121A536 | 24 April 2014 | Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 |
ML14030A046 | 20 February 2014 | Letter from Eric J. Leeds Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 |
IR 05000341/2013008 | 29 October 2013 | IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI) |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) |
ML13044A561 | 1 March 2013 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Flooding Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML12172A192 | 19 March 2012 | 2012 Fermi Power Plant Initial License Examination Miscellaneous Correspondence |
ML12056A043 | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments |
ML12056A044 | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status |
ML12056A045 | 12 March 2012 | Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML12054A679 | 12 March 2012 | Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation |
ML12054A694 | 12 March 2012 | Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents |
ML12054A735 | 12 March 2012 | Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 12 March 2012 | Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status |
NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments |
ML11167A114 | 8 June 2011 | Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74 |
IR 05000341/2011002 | 2 May 2011 | IR 05000341-11-002, on 01/01/2011 - 03/31/2011, Fermi Power Plant, Unit 2, Routine Integrated, Maintenance Effectiveness, Outage Activities, Identification and Resolution of Findings |
IR 05000341/2010005 | 3 February 2011 | IR 05000341-10-005, 10/01/2010 - 12/31/2010; Fermi Power Plant, Unit 2; Routine Integrated Ir. Operability Evaluations and Follow-Up of Events and Notices of Enforcement Discretion |
NRC-10-0070, Response to Request for Additional Information for License Amendment Request to Revise the Core Spray Flow Requirement | 22 October 2010 | Response to Request for Additional Information for License Amendment Request to Revise the Core Spray Flow Requirement |
NRC-10-0073, Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-1 | 4 October 2010 | Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-1 |
ML102140387 | 30 July 2010 | Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010 |
ML102140429 | 23 July 2010 | Fermi 2, Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification |
IR 05000341/2010006 | 30 April 2010 | IR 05000341-10-006-ERRATA, on 01/25/2010 - 04/05/2010, Fermi Power Plant, Unit 2, Component Design Bases Inspection (CDBI) |
ML101180295 | 27 April 2010 | IR 05000341-10-006; on 01/25 - 04/05/2010; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI) |
ML100150036 | 14 January 2010 | Email from Mahesh Chawla to Alan Hassoun Regarding LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 - Revised RAIs |
ML093490004 | 14 December 2009 | E-mail to A. Hassoun and R. W. Johnson - LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification |
ML093070294 | 16 September 2009 | Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modificat |
NRC-09-0054, Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modifi | 16 September 2009 | Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modificat |
ML091950440 | 13 July 2009 | Proposed LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 |
NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification | 10 June 2009 | Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification |
IR 05000341/2008005 | 30 January 2009 | IR 05000341-08-005; on 10/01/2008 - 12/31/2008; Fermi Power Plant, Unit 2; Annual Heat Sink Performance; Surveillance Testing; and Other Activities |
NRC-08-0049, Response to NRC Unresolved Item Resolution Inspection Report 05000341-08-008 | 4 August 2008 | Response to NRC Unresolved Item Resolution Inspection Report 05000341-08-008 |
IR 05000341/2008008 | 20 June 2008 | IR 05000341-08-008, 02/25/2008 - 05/07/2008, Fermi Power Plant, Unit 2, Routine Followup of Unresolved Items |
ML081340284 | 8 May 2008 | Comment (22) of Ronald W Gaston on Behalf of Detroit Edison on Proposed Rules PR-20, 30, 40, 50, 70 and 72 Regarding Decommissioning Planning |