Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20217L63314 August 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML17072A40813 March 2017NRR E-mail Capture - NRC Issuance of an Expedited Amendment Associated with Emergency Core Cooling System
ML16230A61317 August 2016NRR E-mail Capture - Fermi 2 - NRC Issuance of Amendment Associated with Surveillance Requirement (SR) 3.5.1.4
ML16011A0145 January 2016Comment (21) of Kevin Kamps Opposing Fermi 2 License Renewal
ML16011A0155 January 2016Comment (22) of Michael J Keegan Opposing Fermi 2 License Renewal Application Draft Supplemental Environmental Impact Statement
ML16011A0081 January 2016Comment (14) of Art Myatt Opposing the Construction of Fermi 3 and the Relicensing of Fermi 2 for the 2025-2045 Timeframe
ML16011A03028 December 2015Comment (37) of David Schonberger on Behalf of Alliance to Halt Fermi 3 on DTE Electric Company; Fermi 2 Nuclear Power Plant; Issuance of Draft Environmental Impact Statement
ML15174A2571 September 2015Letter to Licensees Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events
ML15155B41614 July 2015Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3
ML15049A15317 February 2015Speech-S-15-001: Prepared Remarks of NRC Chairman Stephen G. Burns Platts 11th Annual Nuclear Energy Conference February 17, 2015- Washington, D.C
ML15037A6186 February 2015Memorandum and Order (Ruling on Petitions to Intervene and Requests for a Hearing) LBP-15-5
ML14330A25920 November 2014Transcript of Oral Arguments in the Matter of Fermi Nuclear Power Plant, Unit 2, Monroe, Michigan on November 20, 2014, Pages 1-233
ML14255A47412 September 2014Applicant DTE Electric Company Answer Opposing Petitions to Intervene
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
ML14230B04018 August 2014Petition for Leave to Intervene and Request for Hearing of Don'T Waste Michigan, Citizens Environment Alliance of Southwestern Ontario and Beyond Nuclear
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights
ML14121A53624 April 2014Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13
ML14030A04620 February 2014Letter from Eric J. Leeds Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1
IR 05000341/201300829 October 2013IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI)
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)
ML13044A5611 March 2013Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Flooding Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12172A19219 March 20122012 Fermi Power Plant Initial License Examination Miscellaneous Correspondence
ML12056A04312 March 2012Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments
ML12056A04412 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12056A04512 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML12054A67912 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML12054A69412 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents
ML12054A73512 March 2012Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events12 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status12 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments12 March 2012Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments
ML11167A1148 June 2011Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74
IR 05000341/20110022 May 2011IR 05000341-11-002, on 01/01/2011 - 03/31/2011, Fermi Power Plant, Unit 2, Routine Integrated, Maintenance Effectiveness, Outage Activities, Identification and Resolution of Findings
IR 05000341/20100053 February 2011IR 05000341-10-005, 10/01/2010 - 12/31/2010; Fermi Power Plant, Unit 2; Routine Integrated Ir. Operability Evaluations and Follow-Up of Events and Notices of Enforcement Discretion
NRC-10-0070, Response to Request for Additional Information for License Amendment Request to Revise the Core Spray Flow Requirement22 October 2010Response to Request for Additional Information for License Amendment Request to Revise the Core Spray Flow Requirement
NRC-10-0073, Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-14 October 2010Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-1
ML10214038730 July 2010Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010
ML10214042923 July 2010Fermi 2, Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification
IR 05000341/201000630 April 2010IR 05000341-10-006-ERRATA, on 01/25/2010 - 04/05/2010, Fermi Power Plant, Unit 2, Component Design Bases Inspection (CDBI)
ML10118029527 April 2010IR 05000341-10-006; on 01/25 - 04/05/2010; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI)
ML10015003614 January 2010Email from Mahesh Chawla to Alan Hassoun Regarding LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 - Revised RAIs
ML09349000414 December 2009E-mail to A. Hassoun and R. W. Johnson - LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification
ML09307029416 September 2009Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modificat
NRC-09-0054, Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modifi16 September 2009Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modificat
ML09195044013 July 2009Proposed LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477
NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification10 June 2009Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification
IR 05000341/200800530 January 2009IR 05000341-08-005; on 10/01/2008 - 12/31/2008; Fermi Power Plant, Unit 2; Annual Heat Sink Performance; Surveillance Testing; and Other Activities
NRC-08-0049, Response to NRC Unresolved Item Resolution Inspection Report 05000341-08-0084 August 2008Response to NRC Unresolved Item Resolution Inspection Report 05000341-08-008
IR 05000341/200800820 June 2008IR 05000341-08-008, 02/25/2008 - 05/07/2008, Fermi Power Plant, Unit 2, Routine Followup of Unresolved Items
ML0813402848 May 2008Comment (22) of Ronald W Gaston on Behalf of Detroit Edison on Proposed Rules PR-20, 30, 40, 50, 70 and 72 Regarding Decommissioning Planning