Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RS-22-082, Defueled Safety Analysis Report Update, Revision 1122 June 2022Defueled Safety Analysis Report Update, Revision 11
ML21076A37117 August 2021Approval of Certified Fuel Handler Training and Retraining Program
ML21179A03421 June 20214 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21179A05121 June 2021Amendment 23 to Fire Protection Report, Volume 4, Cross Reference from Old to New Configuration of Fppdp
JAFP-21-0014, Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs3 March 2021Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs
ML20300A23517 November 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident
ML20342A2874 November 2020Non-Concurrence on Dresden Nuclear Power Station, Units 2 and 3 - NRC Inspection Report 05000237/2020090 and 05000249/2020090
RS-20-070, Defueled Safety Analysis Report Update, Revision 1022 June 2020Defueled Safety Analysis Report Update, Revision 10
ML20105A5075 June 2020SPRA Report Staff Assessment
ML18138A3856 March 2019Staff Assessment of Flood Hazard Integrated Assessment (CAC Nos. MG0221 and MG0222; EPID L-2017-JLD-0050)
ML18236A26217 September 2018Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal
RS-18-077, Defueled Safety Analysis Report Update, Revision 920 June 2018Defueled Safety Analysis Report Update, Revision 9
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of Plant21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of Plant
ML17179A52021 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of Plant
RS-16-117, Submittal of Defueled Safety Analysis Report Update, Revision 820 June 2016Submittal of Defueled Safety Analysis Report Update, Revision 8
ML16075A32916 March 2016OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations
ML16069A2229 March 2016Speech-S-16-004: Perspectives from Commissioner Baran Remarks by NRC Commissioner Jeff Baran 2016 Regulatory Information Conference March 9, 2016
ML15174A2571 September 2015Letter to Licensees Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events
ML14171A36020 June 2014Defueled Safety Analysis Report Update, Revision 7
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights
RS-14-077, Response to Request for Additional Information Re Potential Loss of Spent Fuel Pool Cooling5 March 2014Response to Request for Additional Information Re Potential Loss of Spent Fuel Pool Cooling
ML14030A04620 February 2014Letter from Eric J. Leeds Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)
ML13128A0567 May 2013IR 05000237-13-002, 05000249-13-002; 01/01/2013 - 03/31/2013; Dresden Nuclear Power Station, Units 2 & 3; Adverse Weather Protection and Identification and Resolution of Problem
ML13044A5611 March 2013Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Flooding Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
SVPLTR 13-0005, Response to NRC Acknowledgement of Response to NRC Request for a Written, Response to NRC Observations and Concerns Regarding Dresden Station, Response Plan for External Flooding Events31 January 2013Response to NRC Acknowledgement of Response to NRC Request for a Written, Response to NRC Observations and Concerns Regarding Dresden Station, Response Plan for External Flooding Events
RS-12-107, Defueled Safety Analysis Report Update, Revision 621 June 2012Defueled Safety Analysis Report Update, Revision 6
ML12054A73512 March 2012Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML12054A69412 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents
ML12054A67912 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML12056A04512 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML12056A04412 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12056A04312 March 2012Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments
NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments12 March 2012Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status12 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events12 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
IR 05000237/201100827 October 2011IR 05000237-11-008 (Drs), 05000249-11-008 (Drs), on 07/27/2011 - 10/17/2011, Dresden Nuclear Power Station, Routine Triennial Fire Protection Baseline Inspection
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, Introduction29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, Introduction
ML11202A17929 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, Introduction
ML11167A1148 June 2011Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74
RS-10-172, Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.12 October 2010Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.
RS-10-098, Submittal of Revision 5 to Defueled Safety Analysis Report21 June 2010Submittal of Revision 5 to Defueled Safety Analysis Report
ML0822000519 July 2008Comment (2) of David P. Helker, on Behalf of Exelon and Amergen, Concerning Draft Regulatory Guide DG-1195, Availability of Electric Power Sources.
RS-08-076, Defueled Safety Analysis Report Update19 June 2008Defueled Safety Analysis Report Update
SVPLTR 08-0014, Response to Non-Cited Violations, 05000237-08-007 and 05000249-08-00729 February 2008Response to Non-Cited Violations, 05000237-08-007 and 05000249-08-007
ML07170077011 July 2007Staff Response to TIA 2005-009 Regarding Emergency Diesel Generator Testing, Revision 1
ML05178034722 August 2003E-mail W/ Attachment from M. Dapas to J. Dyer, DPO on Dresden Heavy Loads Handling System
IR 05000237/200300230 April 2003IR 05000237-03-002, IR 05000249-03-002, on 12/28/2002 - 03/31/200; Exelon Generation Company; Dresden Nuclear Power Station, Units 2 and 3. Maintenance Risk Assessment, Operability Evaluations, Identification and Resolution of Problems, Eve
ML03101002621 February 2003NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane