Semantic search

Jump to navigation Jump to search
 Start dateSiteTitle
05000374/FIN-2015002-0330 June 2015 23:59:59LaSalleInadequate 10 CFR 50.59 Evaluation for Jet Pump Plugs Affecting Fuel Bundle Cooling
05000483/FIN-2014008-0330 September 2014 23:59:59CallawayEmergency Diesel Generator Operability Evaluations using 7 Day Mission Time
05000387/FIN-2014002-0131 March 2014 23:59:59SusquehannaAdequacy of Compensatory Measures to Restore Technical Specification Operability
05000382/FIN-2013003-0130 June 2013 23:59:59WaterfordFailure to provide design control measures to withstand the effects of flooding on the reactor auxiliary building roof
05000382/FIN-2012003-0230 June 2012 23:59:59WaterfordFailure to Provide Adequate Design Control Measures for Verifying or Checking the Adequacy of the Ultimate Heat Sink Thermal Performance Analysis
05000237/FIN-2011004-0130 September 2011 23:59:59DresdenClassification of the Emergency Diesel-Driven Flood Pump to Required Quality Standards
05000286/FIN-2011003-0330 June 2011 23:59:59Indian PointLicensee-Identified Violation
05000275/FIN-2010007-0530 June 2010 23:59:59Diablo CanyonInadequate Operability Determination Associated With the Offsite Degraded Voltage Protection Scheme
05000275/FIN-2010007-0330 June 2010 23:59:59Diablo CanyonNon-Conservative Decision Making resulted in a Violation of Technical Specification
05000247/FIN-2010003-0230 June 2010 23:59:59Indian PointLicensee-Identified Violation
05000286/FIN-2010002-0331 March 2010 23:59:59Indian PointLicensee-Identified Violation
05000454/FIN-2009007-0331 March 2009 23:59:59ByronConcerns with Licensee\\\'s Margin to Overfill (MTO) Analysis Related to Steam Generator Tube Rupture (SGTR) Event.