Semantic search

Jump to navigation Jump to search
 SiteStart dateReporting criterionTitle
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bQuad Cities8 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell FlangesQuad Cities24 April 2023Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges
RS-23-002, Application to Adopt TSTF-332, ECCS Response Time TestingClinton13 January 2023Application to Adopt TSTF-332, ECCS Response Time Testing
RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing IntervalDresden1 November 2022Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationDresden
Nine Mile Point
Clinton
Quad Cities
LaSalle
3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration
RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces AnalysisLaSalle12 January 2023Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis
RS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities StationQuad Cities25 May 2022Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station
RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed ValvesClinton24 May 2022Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves
RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool CoolingClinton24 May 2022Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling
RS-22-056, Constellation Radiological Emergency Plan Addendum RevisionQuad Cities21 April 2022Constellation Radiological Emergency Plan Addendum Revision
RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad AirlockClinton7 April 2022Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock
RS-22-011, Submittal of Relief Requests Associated with the Sixth Inservice Testing IntervalQuad Cities17 February 2022Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsCalvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
4 January 2022Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements
RS-21-107, 5 to Technical Requirements ManualQuad Cities21 October 20215 to Technical Requirements Manual
RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 DieselDresden
Clinton
Quad Cities
LaSalle
19 August 2021Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel
RS-21-066, Amendment 23 to Fire Protection Report, Volume 3, Cross Reference from Old to New Configurations of FppdpDresden21 June 2021Amendment 23 to Fire Protection Report, Volume 3, Cross Reference from Old to New Configurations of Fppdp
RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsPeach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
30 June 2021Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements
RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bLaSalle31 March 2021Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RS-21-036, Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ConditionDresden16 March 2021Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test FrequencyClinton24 February 2021License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency
RS-21-006, Application to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application MethodologyLaSalle10 February 2021Application to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology
RS-20-153, Amendment 29 to Fire Protection Report, Chapter 3, Guidelines of BTP Cmeb 9.5-1Byron17 December 2020Amendment 29 to Fire Protection Report, Chapter 3, Guidelines of BTP Cmeb 9.5-1
RS-20-139, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69Clinton24 November 2020Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69
RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)LaSalle29 October 2020Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)
RS-20-132, License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ConditionDresden29 October 2020License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
RS-20-126, EP-AA-111-F-02, Rev. 1, Braidwood PAR FlowchartBraidwood13 October 2020EP-AA-111-F-02, Rev. 1, Braidwood PAR Flowchart
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsDresden
Clinton
Quad Cities
LaSalle
18 November 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568Dresden
Peach Bottom
Nine Mile Point
Limerick
Quad Cities
LaSalle
3 September 2020Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568
RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4bClinton30 April 2020Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b
RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3Quad Cities1 April 2020Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3
RS-20-038, Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment SurveillanceDresden6 May 2020Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance
RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement ProcessDresden
Peach Bottom
Nine Mile Point
Limerick
Quad Cities
LaSalle
30 April 2020License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process
RS-20-029, Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 9 to Fire Protection ReportLaSalle13 April 2020Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 9 to Fire Protection Report
RS-20-028, 1 to Updated Safety Analysis Report, CPS TsbClinton31 March 20201 to Updated Safety Analysis Report, CPS Tsb
RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)Calvert Cliffs
Peach Bottom
Nine Mile Point
Braidwood
Limerick
Ginna
Clinton
28 February 2020Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)
RS-20-002, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 IssuesByron
Braidwood
Ginna
6 February 2020Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues
RS-20-001, Request for License Amendment Regarding Automatic Operation of Transformer Load Tap ChangerClinton14 January 2020Request for License Amendment Regarding Automatic Operation of Transformer Load Tap Changer
RS-19-101, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...Dresden30 October 2019Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...
RS-19-098, Submittal of Revision 15 to Updated Final Safety Analysis Report, and Revision 24 to Fire Protection ReportQuad Cities21 October 2019Submittal of Revision 15 to Updated Final Safety Analysis Report, and Revision 24 to Fire Protection Report
RS-19-078, License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies.Byron
Braidwood
24 September 2019License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies.
RS-19-076, Supplement to License Amendment Request to Increase Technical Specifications Allowable MSIV Leakage RatesQuad Cities22 July 2019Supplement to License Amendment Request to Increase Technical Specifications Allowable MSIV Leakage Rates
RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory ControlDresden
Clinton
18 June 2019Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramCalvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Palisades
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
25 June 2019Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program
RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1Quad Cities5 March 2019Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1
RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee ControlDresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Quad Cities
FitzPatrick
LaSalle
14 June 2019Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control
RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsLaSalle14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...Peach Bottom28 September 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...
RS-18-106, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsLimerick14 November 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-18-103, Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose CalculationClinton29 August 2018Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose Calculation
RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...Peach Bottom28 August 2018Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)Quad Cities14 August 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Quad Cities14 August 2018Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-18-060, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...Peach Bottom29 June 2018Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...
RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe AccidentLimerick29 June 2018Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident
RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under ...LaSalle22 June 2018Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under ...
RS-18-052, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsLimerick7 June 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsLimerick7 June 2018Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
RS-18-036, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsLaSalle9 May 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-18-030, Relief Requests Associated with the Fourth Inservice Inspection IntervalBraidwood19 March 2018Relief Requests Associated with the Fourth Inservice Inspection Interval
RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel GeneratorLaSalle19 April 2018License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator
RS-18-022, Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.Dresden14 February 2018Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.
RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Quad Cities26 February 2018Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose CalculationClinton9 January 2018License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation
RS-18-003, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsDresden12 January 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-18-001, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Peach Bottom5 January 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-17-170, Company Emergency Plan Annex and Addendum RevisionsDresden
Byron
Braidwood
Clinton
Quad Cities
LaSalle
19 December 2017Company Emergency Plan Annex and Addendum Revisions
RS-17-164, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Clinton20 December 2017Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
RS-17-162, Radiological Emergency Plan Addendum RevisionLaSalle15 November 2017Radiological Emergency Plan Addendum Revision
RS-17-157, Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test IntervalsLaSalle8 November 2017Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals
RS-17-155, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...Peach Bottom15 December 2017Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...
RS-17-153, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...Limerick15 December 2017Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...
RS-17-152, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...LaSalle15 December 2017Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...
RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlClinton15 November 2017Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
RS-17-133, Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test IntervalsLaSalle3 October 2017Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals
RS-17-131, Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test IntervalsLaSalle27 September 2017Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals
RS-17-130, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities28 September 2017Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.LaSalle13 December 2017Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements ManualQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 8, Electric PowerQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient AnalysisQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantQuad Cities19 October 2017Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
RS-17-125, Relief Request RV-2 Associated with the Fourth Inservice Testing IntervalByron25 September 2017Relief Request RV-2 Associated with the Fourth Inservice Testing Interval
RS-17-111, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities27 July 2017Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-17-101, Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design AnalysisLaSalle28 July 2017Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis
RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)LaSalle8 August 2017Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)
RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)LaSalle17 July 2017Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)Peach Bottom28 August 2017Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
RS-17-086, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Dresden13 July 2017Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
RS-17-082, Redacted Dresden Nuclear Power Station, Units 2 & 3, Amendment 21 to Fire Protection Report, Updated Fire Hazards Analysis, Vol. 1Dresden21 June 2017Redacted Dresden Nuclear Power Station, Units 2 & 3, Amendment 21 to Fire Protection Report, Updated Fire Hazards Analysis, Vol. 1
RS-17-082, Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21Dresden21 June 2017Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramDresden21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemDresden21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
RS-17-079, Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate TestingClinton1 June 2017Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing
RS-17-072, Fourth 10-Year Interval Inservice Inspection Program Relief RequestsLaSalle30 May 2017Fourth 10-Year Interval Inservice Inspection Program Relief Requests
RS-17-069, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Quad Cities27 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-17-068, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.Peach Bottom30 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.
RS-17-067, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under.Nine Mile Point30 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under.
RS-17-066, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Limerick30 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-17-065, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation ..LaSalle29 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation ..
RS-17-063, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Dresden27 June 2017Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-17-060, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesDresden3 May 2017Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-17-051, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities27 April 2017Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement ProcessCalvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Three Mile Island
Braidwood
Limerick
Ginna
Clinton
Quad Cities
LaSalle
28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process
RS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Dresden10 February 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation ValvesLaSalle16 February 2017Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves
RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External EventsPeach Bottom28 February 2017Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events
RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesClinton2 March 2017Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal OperationsClinton4 May 2017License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations
RS-17-008, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.Quad Cities26 January 2017Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.
RS-17-006, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses WQuad Cities12 January 2017Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses Wi
RS-16-257, Withdrawal of Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities22 December 2016Withdrawal of Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-16-254, Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities15 December 2016Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-16-251, Request to Resume Review of Licensing ActionsClinton15 December 2016Request to Resume Review of Licensing Actions
RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramByron
Braidwood
15 December 2016Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory GuidesByron
Braidwood
15 December 2016Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements ManualByron
Braidwood
15 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual
RS-16-245, Radiological Emergency Plan RevisionsDresden
Nine Mile Point
Quad Cities
07201036
9 December 2016Radiological Emergency Plan Revisions
RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access OpeningsDresden
Quad Cities
LaSalle
12 December 2016Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings
RS-16-236, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe.Nine Mile Point14 December 2016Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe.
RS-16-234, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...Limerick15 December 2016Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...
RS-16-233, Fifth Six-Month Status Report for Phases 1&2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under.LaSalle14 December 2016Fifth Six-Month Status Report for Phases 1&2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under.
RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ConditionClinton17 November 2016License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ConditionClinton17 November 2016Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
RS-16-210, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses wQuad Cities16 November 2016Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses wi
RS-16-208, Response to NRC Acknowledgement of Suspension Request for Licensing ActionsClinton1 November 2016Response to NRC Acknowledgement of Suspension Request for Licensing Actions
RS-16-205, Relief Requests Associated with the Fourth Interval Inservice Testing ProgramLaSalle17 October 2016Relief Requests Associated with the Fourth Interval Inservice Testing Program
RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 AccidentClinton31 October 2016Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 9 - Auxiliary SystemsClinton31 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 9 - Auxiliary Systems
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 5 - Reactor Coolant System and Connected SystemsClinton31 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 5 - Reactor Coolant System and Connected Systems
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 14 - Initial Test ProgramClinton31 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 14 - Initial Test Program
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix a - GlossaryClinton31 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix a - Glossary
RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesLaSalle26 October 2016License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesQuad Cities19 September 2016Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalLaSalle28 October 2016Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal
RS-16-176, County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-icLaSalle1 December 2016County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ich
RS-16-161, Request for NRC to Suspend Review of License Amendment RequestsClinton11 August 2016Request for NRC to Suspend Review of License Amendment Requests
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)Peach Bottom26 August 2016Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)
RS-16-111, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsNine Mile Point30 June 2016Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-16-110, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsQuad Cities30 June 2016Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-16-109, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 6/6/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsPeach Bottom30 June 2016Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 6/6/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-16-108, Fourth Six Month Status Report for Phases 1 & 2 Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-1Limerick30 June 2016Fourth Six Month Status Report for Phases 1 & 2 Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-10
RS-16-107, County, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident CondiLaSalle30 June 2016County, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Condit
RS-16-106, Fourth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Dresden30 June 2016Fourth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-16-090, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Dresden16 August 2016Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-16-089, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Nine Mile Point1 July 2016Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective PagesLaSalle11 April 2016LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages
RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of PlantLaSalle11 April 2016LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant
RS-16-080, LaSalle County, Units 1 and 2 - Transmittal of Updated Final Safety Analysis Report (Ufsar), Revision 22 and Fire Protection Report (Fpr), Revision 7LaSalle11 April 2016LaSalle County, Units 1 and 2 - Transmittal of Updated Final Safety Analysis Report (Ufsar), Revision 22 and Fire Protection Report (Fpr), Revision 7
RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test.Clinton31 March 2016Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test.
RS-16-068, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal ApplicationLaSalle4 April 2016Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application
RS-16-064, EP-AA-1004, Addendum 3, Revision 2, Emergency Action Levels for Dresden StationDresden23 March 2016EP-AA-1004, Addendum 3, Revision 2, Emergency Action Levels for Dresden Station
RS-16-059, EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station.Quad Cities28 March 2016EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station.
RS-16-058, EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station.Clinton28 March 2016EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station.
RS-16-047, EP-AA-1005, Addendum 3, Revision 1, Emergency Action Levels for LaSalle StationLaSalle11 February 2016EP-AA-1005, Addendum 3, Revision 1, Emergency Action Levels for LaSalle Station
RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access OpeningsDresden
Quad Cities
LaSalle
3 February 2016County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings
RS-16-029, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Nine Mile Point26 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Peach Bottom26 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-16-019, License Amendment Request to Incorporate Revised Alternative Source Term Dose CalculationClinton29 January 2016License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation
RS-16-015, License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesClinton25 January 2016License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049Clinton14 December 2015Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049
RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014LaSalle2 December 2015Corrections to the License Renewal Application Dated December 9, 2014
RS-15-304, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.Quad Cities16 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..Peach Bottom15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
RS-15-302, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..Nine Mile Point15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..
RS-15-301, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..Limerick15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..LaSalle16 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..
RS-15-299, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..Dresden16 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
RS-15-253, Withdrawal of Relief Request RV-1 and Revision to Relief Request RG-1 Associated with the Fourth Inservice Testing IntervalByron21 September 2015Withdrawal of Relief Request RV-1 and Revision to Relief Request RG-1 Associated with the Fourth Inservice Testing Interval
RS-15-246, Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion TimeClinton10 September 2015Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time
RS-15-239, Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal ApplicationLaSalle28 September 2015Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application
RS-15-223, Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal ApplicationLaSalle26 August 2015Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application
RS-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Nine Mile Point28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-215, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order.Quad Cities28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order.
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Peach Bottom28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-212, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.Limerick28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal ApplicationLaSalle6 August 2015Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application
RS-15-185, County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near.Dresden
LaSalle
22 July 2015County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near.
RS-15-183, Request for Second Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsLimerick9 July 2015Request for Second Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
RS-15-180, Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal ApplicationLaSalle15 July 2015Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application
RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing IntervalByron22 June 2015Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval
RS-15-153, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Nine Mile Point30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-15-152, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Quad Cities30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-15-151, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..Peach Bottom30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-15-150, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.Limerick30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.
RS-15-149, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..LaSalle30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..
RS-15-148, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..Dresden30 June 2015Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..
RS-15-138, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Clinton15 July 2015Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-117, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Nine Mile Point8 June 2015Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-114, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..Peach Bottom8 May 2015Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..
RS-15-101, Request for Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.Limerick2 April 2015Request for Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
RS-15-088, Request for Schedule Relaxation from NRC Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Bases External EventsQuad Cities4 March 2015Request for Schedule Relaxation from NRC Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Bases External Events
RS-15-086, Partial Withdrawal of Request for Exemption from 10 CFR 50, Appendix a, GDC-56 - Penetration Z-48 (Drywell)Nine Mile Point30 March 2015Partial Withdrawal of Request for Exemption from 10 CFR 50, Appendix a, GDC-56 - Penetration Z-48 (Drywell)
RS-15-071, Response to NRC Request for Additional Information, Set 45, Dated January 22, 2015, Related to License Renewal ApplicationByron
Braidwood
23 February 2015Response to NRC Request for Additional Information, Set 45, Dated January 22, 2015, Related to License Renewal Application
RS-15-057, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Nine Mile Point19 February 2015February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-038, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentLimerick31 March 2015Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-15-024, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Quad Cities27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-018, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Clinton27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal ApplicationByron
Braidwood
15 December 2014Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application
RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Revision 15, Chapter 6 - Engineered Safety FeaturesByron
Braidwood
15 December 2014Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Revision 15, Chapter 6 - Engineered Safety Features
RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test ProgramByron
Braidwood
15 December 2014Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test Program
RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.Dresden
Quad Cities
LaSalle
22 December 2014License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.
RS-14-298, Expedited Seismic Evaluation Process Report Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentLaSalle19 December 2014Expedited Seismic Evaluation Process Report Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-14-235, Response to NRC Request for Additional Information, Set 38, Dated 08/04/2014; LRA Changes from NRR Staff Feedback on 07/30/2014 Telecon; and, LRA Changes from NRC Region Ill IP-71002 Inspection, to Byron, Units 1 & 2, Braidwood, Units 1 &Byron
Braidwood
29 August 2014Response to NRC Request for Additional Information, Set 38, Dated 08/04/2014; LRA Changes from NRR Staff Feedback on 07/30/2014 Telecon; and, LRA Changes from NRC Region Ill IP-71002 Inspection, to Byron, Units 1 & 2, Braidwood, Units 1 & 2
RS-14-218, Responses to NRC Requests for Additional Information, Sets 33 and 34, Both Dated June 23, 2014; and Corrections and Clarifications Related to the License Renewal ApplicationByron
Braidwood
18 July 2014Responses to NRC Requests for Additional Information, Sets 33 and 34, Both Dated June 23, 2014; and Corrections and Clarifications Related to the License Renewal Application
RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement ProcessDresden
Byron
Braidwood
Clinton
Quad Cities
LaSalle
14 July 2014Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process
RS-14-162, Corrections to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal ApplicationByron
Braidwood
23 May 2014Corrections to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application
RS-14-128, Updated Final Safety Analysis Report, Revision 20, Technical Specifications BasesLaSalle11 April 2014Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective PagesLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective Pages
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary SystemsLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary Systems
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric PowerLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric Power
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety FeaturesLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety Features
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected SystemsLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident AnalysesLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident Analyses
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of PlantLaSalle11 April 2014LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of Plant
RS-14-127, Response to Request for Additional Information Related to License Amendment Request to Revise Peak Calculated Primary Containment Internal PressureLaSalle12 June 2014Response to Request for Additional Information Related to License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure
RS-14-126, Response to NRC Request for Additional Information, Set 20, Dated April 7, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal ApplicationByron
Braidwood
6 May 2014Response to NRC Request for Additional Information, Set 20, Dated April 7, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application
RS-14-115, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through EndPeach Bottom30 May 2014Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End
RS-14-097, Units 1 & 2 - Responses to NRC Requests for Additional Information, Set 14, Dated March 18, 2014, Related to License Renewal ApplicationByron
Braidwood
17 April 2014Units 1 & 2 - Responses to NRC Requests for Additional Information, Set 14, Dated March 18, 2014, Related to License Renewal Application
RS-14-080, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.Byron
Braidwood
18 March 2014License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.
RS-14-063, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses Re Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Quad Cities30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses Re Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Peach Bottom30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-060, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Limerick30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-059, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)LaSalle30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-058, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Dresden30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-047, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsPeach Bottom26 February 2014Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
RS-14-046, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsQuad Cities27 February 2014Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
RS-14-045, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsLaSalle27 February 2014Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
RS-14-015, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)Quad Cities28 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)
RS-14-009, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)Clinton28 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements ManualClinton9 January 2014Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary SystemsClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary Systems
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 7 - Instrument and Control SystemsClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 7 - Instrument and Control Systems
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected SystemsClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and SystemsClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident AnalysisClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 14 - Initial Test ProgramClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 14 - Initial Test Program
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of PlantClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of Plant
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix a - GlossaryClinton9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix a - Glossary
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.Dresden
Quad Cities
19 December 2013Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.
RS-13-259, Response to Request for Additional Information Re NRC Review of Unit 2 Cycle 15 Core Operating Limits ReportLaSalle31 October 2013Response to Request for Additional Information Re NRC Review of Unit 2 Cycle 15 Core Operating Limits Report
RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program.Braidwood10 October 2013License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program.
RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138Limerick7 October 2013Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138
RS-13-136, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentQuad Cities27 June 2013Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-13-119, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Dresden28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-117, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Clinton28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-111, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050)Dresden28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050)
RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal PressureLaSalle5 September 2013License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure
RS-13-085, Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency...Peach Bottom30 April 2013Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency...
RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..Limerick30 April 2013Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..
RS-13-062, Fifth Ten-Year Interval Inservice Testing ProgramQuad Cities25 February 2013Fifth Ten-Year Interval Inservice Testing Program
RS-13-052, Additional Information Regarding Relief Request I3R-09, Alternative to VT-2 Visual Inspection of Combustible Gas Control System PipingClinton8 February 2013Additional Information Regarding Relief Request I3R-09, Alternative to VT-2 Visual Inspection of Combustible Gas Control System Piping
RS-13-025, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Quad Cities28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-024, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)Peach Bottom28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
RS-13-023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Oyster Creek28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-022, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Limerick28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-020, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Dresden28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-019, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Clinton28 February 2013Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-13-009, Operational Requirements Manual (Orm) 2013Clinton10 January 2013Operational Requirements Manual (Orm) 2013
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary SystemsClinton10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Control SystemsClinton10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Control Systems
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected SystemsClinton10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and SystemsClinton10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems
RS-13-002, Response to Request for Additional Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink.LaSalle18 January 2013Response to Request for Additional Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink.
RS-12-223, License Amendment Request to Revise Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation.Byron
Braidwood
21 December 2012License Amendment Request to Revise Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation.
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications BasesByron14 December 2012Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements ManualByron14 December 2012Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual
RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications BasesBraidwood14 December 2012Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9.0 - Auxiliary SystemsByron
Braidwood
14 December 2012Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9.0 - Auxiliary Systems
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and ControlsByron
Braidwood
14 December 2012Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety FeaturesByron
Braidwood
14 December 2012Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14.0 - Initial Test ProgramByron
Braidwood
14 December 2012Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14.0 - Initial Test Program
RS-12-179, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing IntervalQuad Cities8 October 2012Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval
RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentPeach Bottom19 November 2012Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-12-156, Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power SystemDresden
Peach Bottom
Oyster Creek
Byron
Three Mile Island
Braidwood
Limerick
Clinton
Quad Cities
LaSalle
25 October 2012Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System
RS-12-155, Submittal of Relief Requests Associated with the Fifth Lnservice Testing IntervalDresden30 October 2012Submittal of Relief Requests Associated with the Fifth Lnservice Testing Interval
RS-12-154, Attachment D to Proto-Power Calculation 97-195, Revision aLaSalle17 September 2012Attachment D to Proto-Power Calculation 97-195, Revision a
RS-12-154, Attachment 2 - Heat Transfer Calculations Used to Develop Attachment 5 and Table A5-1 in the July 12, 2012, License Amendment RequestLaSalle17 September 2012Attachment 2 - Heat Transfer Calculations Used to Develop Attachment 5 and Table A5-1 in the July 12, 2012, License Amendment Request
RS-12-151, Fifth Interval Lnservice Inspection Program Plan and Relief RequestsDresden28 September 2012Fifth Interval Lnservice Inspection Program Plan and Relief Requests
RS-12-150, Fifth Interval Inservice Inspection Program Plan and Relief RequestsQuad Cities28 September 2012Fifth Interval Inservice Inspection Program Plan and Relief Requests
RS-12-149, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing IntervalQuad Cities13 September 2012Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval
RS-12-026, Submittal of Relief Requests Associated with the Fifth Inservice Testing IntervalQuad Cities15 February 2012Submittal of Relief Requests Associated with the Fifth Inservice Testing Interval
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 15 - Accident and Transient AnalysesQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 15 - Accident and Transient Analyses
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 12 - Radiation ProtectionQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 12 - Radiation Protection
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 11 - Radioactive Waste ManagementQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 11 - Radioactive Waste Management
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 07 - Instrumentation and ControlsQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 07 - Instrumentation and Controls
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 05 - Reactor Coolant System and Connected SystemsQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 05 - Reactor Coolant System and Connected Systems
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 01 - IntroductionQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 01 - Introduction
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Appendix aQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Appendix a
RS-11-159, Quad Cities, Units 1 and 2 - Technical Specification BasesQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Technical Specification Bases
RS-11-159, Quad Cities, Units 1 and 2 - Technical Requirements ManualQuad Cities19 October 2011Quad Cities, Units 1 and 2 - Technical Requirements Manual
RS-11-123, Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for Rcs..LaSalle15 August 2011Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for Rcs..
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification BasesDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary SystemsDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and ControlsDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and Controls
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety FeaturesDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety Features
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected SystemsDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected Systems
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test ProgramDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test Program
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1)Dresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1)
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion SystemDresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion System
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9Dresden29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9
RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.LaSalle4 April 2011License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
RS-10-208, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation InstrumentationDresden13 December 2010Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation
RS-10-172, Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.Dresden
Quad Cities
12 October 2010Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.
RS-10-165, Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation InstrumentationDresden6 October 2010Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation
RS-10-152, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation InstrumentationDresden15 September 2010Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation
RS-10-096, Supplemental Information Concerning Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection InstrumentationQuad Cities2 June 2010Supplemental Information Concerning Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation
RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5BClinton21 May 2010Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B
RS-10-039, License Amendment Request to Administratively Revise Technical SpecificationsClinton4 June 2010License Amendment Request to Administratively Revise Technical Specifications
RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)Quad Cities16 February 2010Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
RS-10-031, Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3)LaSalle15 February 2010Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3)
RS-10-030, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)Byron15 February 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
RS-10-029, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled ProgramBraidwood15 February 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program
RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.Dresden
Clinton
Quad Cities
3 March 2010Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.
RS-10-024, Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled ProgramDresden16 February 2010Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program
RS-10-021, License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup ModeDresden4 October 2010License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode
RS-10-018, Request for License Amendment Regarding Shutdown Cooling System Isolation InstrumentationDresden4 February 2010Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation
RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.LaSalle22 February 2010Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.
RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)Clinton15 February 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
RS-10-001, LaSalle, Units 1 and 2, Attachment 8 - NEDO-33485, Rev. 0, Safety Analysis Report for LaSalle County Station Units 1 and 2, Thermal Power Optimization.LaSalle27 January 2010LaSalle, Units 1 and 2, Attachment 8 - NEDO-33485, Rev. 0, Safety Analysis Report for LaSalle County Station Units 1 and 2, Thermal Power Optimization.
RS-09-157, Submittal of Site-Specific Safstor Decommissioning Cost EstimateByron16 November 2009Submittal of Site-Specific Safstor Decommissioning Cost Estimate
RS-09-153, Response to Request for Additional Information Regarding Generic Letter 2008-01Peach Bottom10 November 2009Response to Request for Additional Information Regarding Generic Letter 2008-01
RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) SystemDresden
Quad Cities
10 November 2009Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System
RS-09-135, Additional Information Supporting the License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.LaSalle28 October 2009Additional Information Supporting the License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.
RS-09-130, Additional Information Supporting Request for License Amendment Regarding Application of Alternative Source TermLaSalle28 September 2009Additional Information Supporting Request for License Amendment Regarding Application of Alternative Source Term
RS-09-118, Submittal of Relief Requests Associated with the Third Inservice Inspection IntervalBraidwood4 September 2009Submittal of Relief Requests Associated with the Third Inservice Inspection Interval
RS-09-114, Site-Specific Safstor Decommissioning Cost EstimateLaSalle27 August 2009Site-Specific Safstor Decommissioning Cost Estimate
RS-09-111, Submittal of Clinton Power Station Site-Specific Safstor Decommissioning Cost EstimateClinton27 August 2009Submittal of Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate
RS-09-105, Withdrawal of Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building TemperatureClinton4 August 2009Withdrawal of Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature
RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell LeakageDresden
Quad Cities
28 August 2009Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage
RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building TemperatureClinton15 June 2009Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature
RS-09-078, Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation InstrumentationClinton23 June 2009Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation
RS-09-077, Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building..Clinton20 June 2009Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building..
RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating LicenseDresden
Quad Cities
7 April 2009Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License
RS-09-020, Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.LaSalle26 March 2009Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.
RS-09-003, Additional Information Supporting Requests for License Amendments to Adopt TSTF-423, Technical Specifications End States, NEDC-32988-ADresden
Clinton
Quad Cities
30 January 2009Additional Information Supporting Requests for License Amendments to Adopt TSTF-423, Technical Specifications End States, NEDC-32988-A
RS-08-161, Technical Specification BasesByron15 December 2008Technical Specification Bases
RS-08-161, Braidwood, Units 1 and 2 - Technical Specification BasesBraidwood15 December 2008Braidwood, Units 1 and 2 - Technical Specification Bases
RS-08-132, Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5LaSalle23 October 2008Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5
RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5LaSalle23 October 2008LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5
RS-08-050, Amergen Energy Co, Llc., Three Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Dresden
Peach Bottom
Oyster Creek
Byron
Three Mile Island
Braidwood
Limerick
Quad Cities
LaSalle
11 April 2008Amergen Energy Co, Llc., Three Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Table of Contents Through List of Effective PagesLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Table of Contents Through List of Effective Pages
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Auxiliary SystemsLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Auxiliary Systems
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 8.0 - Electric PowerLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 8.0 - Electric Power
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 7.0 - Instrumentation and Control SystemsLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 7.0 - Instrumentation and Control Systems
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 6.0 - Engineered Safety FeaturesLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 6.0 - Engineered Safety Features
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 5.0 - Reactor Coolant System and Connected SystemsLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 5.0 - Reactor Coolant System and Connected Systems
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 3.0 - Design of Structures, Components, Equipment, and SystemsLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 3.0 - Design of Structures, Components, Equipment, and Systems
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 15.0 - Accident AnalysesLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 15.0 - Accident Analyses
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 12.0 - Radiation ProtectionLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 12.0 - Radiation Protection
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 11.0 - Radioactive Waste ManagementLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 11.0 - Radioactive Waste Management
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 1.0 - Introduction and General Description of PlantLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 1.0 - Introduction and General Description of Plant
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix NLaSalle14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix N
RS-08-045, LaSalle, Units 1 and 2, Technical Requirements ManualLaSalle14 April 2008LaSalle, Units 1 and 2, Technical Requirements Manual
RS-08-025, Response to Request for Additional Information Related to Relief Request I3R-11, Hydrogen Recombiner System Piping - 10 CFR 50.55a(a)(3)(i).LaSalle6 March 2008Response to Request for Additional Information Related to Relief Request I3R-11, Hydrogen Recombiner System Piping - 10 CFR 50.55a(a)(3)(i).
RS-07-143, Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.LaSalle12 October 2007Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-07-139, Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.Byron
Braidwood
10 October 2007Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.
RS-07-124, Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.LaSalle7 September 2007Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-07-118, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement ProcessDresden9 October 2007Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process
RS-07-117, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement ProcessQuad Cities9 October 2007Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process
RS-07-113, Additional Information Supporting Request for Emergency License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink.LaSalle2 August 2007Additional Information Supporting Request for Emergency License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink.
RS-07-075, Withdrawal of Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program.Clinton30 April 2007Withdrawal of Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement ProcessClinton21 June 2007Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process
RS-07-051, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.LaSalle18 June 2007Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing ProgramDresden
Peach Bottom
Oyster Creek
Byron
Three Mile Island
Braidwood
Limerick
Quad Cities
8 August 2007Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program
RS-07-034, Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak DetectionLaSalle6 April 2007Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection
RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessDresden
Peach Bottom
Oyster Creek
Byron
Three Mile Island
Braidwood
Limerick
Clinton
Quad Cities
LaSalle
12 April 2007Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
RS-06-176, Site-Specific Decommissioning Cost EstimatesByron
Braidwood
LaSalle
18 December 2006Site-Specific Decommissioning Cost Estimates
RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program.LaSalle17 November 2006Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program.
RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program.Clinton16 November 2006Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-06-149, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical PowerLaSalle12 October 2006Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power
RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement ProcessLaSalle18 October 2006Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process
RS-06-126, Additional Information Supporting License Amendment Request Associated with Direct Current Electrical PowerLaSalle13 September 2006Additional Information Supporting License Amendment Request Associated with Direct Current Electrical Power
RS-06-048, ILRT Interval Extension Risk AssessmentLaSalle31 March 2006ILRT Interval Extension Risk Assessment
RS-06-019, Response to NRC Request for Additional Information with Respect to Request for License Amendment Related to Application of Alternative Radiological Source TermByron
Braidwood
13 February 2006Response to NRC Request for Additional Information with Respect to Request for License Amendment Related to Application of Alternative Radiological Source Term
RS-06-004, Additional Information Supporting Request for License Amendment Regarding Offsite Power Instrumentation and Voltage ControlDresden13 January 2006Additional Information Supporting Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control
RS-06-003, Request for a License Amendment to Revise Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak DetectionLaSalle16 March 2006Request for a License Amendment to Revise Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection
RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance RequirementsClinton1 December 2005Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements
RS-05-132, Additional Information Supporting the Request for License Amendment Related to 24-Month Fuel CycleClinton30 September 2005Additional Information Supporting the Request for License Amendment Related to 24-Month Fuel Cycle
RS-05-130, Fourth Ten-Year Interval Inservice Testing ProgramQuad Cities29 September 2005Fourth Ten-Year Interval Inservice Testing Program
RS-05-114, Rev. 0 to Calculation DRE05-0048, Dresden Units 2 & 3 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis.Dresden14 August 2005Rev. 0 to Calculation DRE05-0048, Dresden Units 2 & 3 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis.
RS-05-111, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source TermClinton19 August 2005Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term
RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable ValuesClinton21 September 2005Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values
RS-05-064, Commitments and Plans Related to Extended Power Uprate OperationDresden
Quad Cities
13 May 2005Commitments and Plans Related to Extended Power Uprate Operation
RS-05-062, Additional Information Supporting the Request for License Amendment Related to 21-Month Fuel CycleClinton23 May 2005Additional Information Supporting the Request for License Amendment Related to 21-Month Fuel Cycle
RS-05-039, Response to Request for Additional Information for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable ValuesClinton30 March 2005Response to Request for Additional Information for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values
RS-05-037, Request for License Amendment Regarding Offsite Power Instrumentation and Voltage ControlDresden4 April 2005Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control
RS-05-032, Request for Technical Specification Change to Revise Secondary Containment Bypass Leakage Surveillance RequirementClinton25 March 2005Request for Technical Specification Change to Revise Secondary Containment Bypass Leakage Surveillance Requirement
RS-05-027, Request for Amendment to Appendix a, Technical Specifications for the Oscillation Power Range Monitor InstrumentationClinton1 April 2005Request for Amendment to Appendix a, Technical Specifications for the Oscillation Power Range Monitor Instrumentation
RS-05-008, Additional Information Supporting Main Steam Line Flow - High Instrumentation Amendment RequestQuad Cities21 January 2005Additional Information Supporting Main Steam Line Flow - High Instrumentation Amendment Request
RS-05-001, Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel..LaSalle13 April 2005Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel..
RS-04-188, Request for Amendment to Technical Specifications Associated with Direct Current Electrical PowerLaSalle9 December 2004Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power
RS-04-174, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source TermClinton17 December 2004Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term
RS-04-172, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source TermClinton9 December 2004Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term
RS-04-147, Response to NRC Inspection Items Regarding Concrete Expansion AnchorsDresden
Quad Cities
30 September 2004Response to NRC Inspection Items Regarding Concrete Expansion Anchors
RS-04-141, Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement ProcessDresden
Peach Bottom
Byron
Braidwood
Clinton
Quad Cities
LaSalle
15 September 2004Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process
RS-04-131, Transmittal of Supplemental Information Supporting the Request for Technical Specification Changes to Eliminate Selected Response Time Testing RequirementsLaSalle2 September 2004Transmittal of Supplemental Information Supporting the Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity ProgramDresden
Peach Bottom
Oyster Creek
Byron
Three Mile Island
Braidwood
Limerick
Clinton
Quad Cities
LaSalle
29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program
RS-04-110, Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High)Quad Cities21 July 2004Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High)
RS-04-105, Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High)Quad Cities19 July 2004Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High)
RS-04-096, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source TermDresden
Quad Cities
30 June 2004Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term
RS-04-086, Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source TermClinton1 July 2004Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term
RS-04-069, License Amendment Request Activation of the Trip Outputs of the Oscillation Power Range Monitor SystemLaSalle30 April 2004License Amendment Request Activation of the Trip Outputs of the Oscillation Power Range Monitor System
RS-04-062, Technical Specifications Changes Related to Main Steam Line Flow-High Isolation InstrumentationQuad Cities10 June 2004Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation
RS-04-043, Request for Technical Specification Changes to Eliminate Selected Response Time Testing RequirementsLaSalle12 March 2004Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements
RS-04-039, Amendment to the Application for Renewed Operating Licenses for Dresden and Quad Cities Nuclear Power StationsDresden
Quad Cities
5 March 2004Amendment to the Application for Renewed Operating Licenses for Dresden and Quad Cities Nuclear Power Stations
RS-04-004, Request for Amendment to Technical Specificaiton 5.5.12, Primary Containment Leakage Rate Testing Program.Dresden15 January 2004Request for Amendment to Technical Specificaiton 5.5.12, Primary Containment Leakage Rate Testing Program.
RS-04-002, License Amendment Request Regarding Activation of the Trip Outputs of the Oscillation Power Range Monitor SystemDresden
Quad Cities
27 February 2004License Amendment Request Regarding Activation of the Trip Outputs of the Oscillation Power Range Monitor System
RS-03-239, Additional Information Supporting the Request for License Amendment Related to Application of the Alternative Source TermClinton23 December 2003Additional Information Supporting the Request for License Amendment Related to Application of the Alternative Source Term
RS-03-229, Additional Information Regarding License Amendment Request for Main Steam Line Low Pressure Isolation SetpointDresden
Quad Cities
5 December 2003Additional Information Regarding License Amendment Request for Main Steam Line Low Pressure Isolation Setpoint
RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureDresden
Byron
Braidwood
Clinton
Quad Cities
LaSalle
5 November 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure
RS-03-199, Request for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable ValuesClinton11 November 2003Request for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values
RS-03-185, Additional Information Supporting the Request for Amendment to Technical Specifications 3.6.5.1, Drywell, and 5.5.13, Primary Containment Rate Testing Program.Clinton15 September 2003Additional Information Supporting the Request for Amendment to Technical Specifications 3.6.5.1, Drywell, and 5.5.13, Primary Containment Rate Testing Program.
RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.Dresden
Peach Bottom
Byron
Three Mile Island
Braidwood
Limerick
Clinton
Quad Cities
LaSalle
19 September 2003Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.
RS-03-172, Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source TermDresden
Quad Cities
15 September 2003Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term
RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve TestingDresden
Quad Cities
8 August 2003Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing
RS-03-164, Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power OperationsClinton19 August 2003Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations
RS-03-160, Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.Quad Cities5 August 2003Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.
RS-03-157, Additional Information Regarding Inservice Testing Program Relief RequestsDresden6 August 2003Additional Information Regarding Inservice Testing Program Relief Requests
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing ProgramLaSalle19 August 2003Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program
RS-03-140, Request for Amendment to Technical Specifications Associated with Direct Current Electrical PowerDresden29 July 2003Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureDresden
Byron
Braidwood
Clinton
Quad Cities
LaSalle
19 June 2003Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.LaSalle20 June 2003Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8LaSalle10 June 2003Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8
RS-03-083, Additional Information Supporting Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. Reflects One-time Deferral of Primary Containment Type a TestQuad Cities11 April 2003Additional Information Supporting Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. Reflects One-time Deferral of Primary Containment Type a Test
RS-03-081, Request for License Amendment for Core Flow Operating Range Expansion & Oscillation Power Range Monitor (OPRM) InstrumentationClinton1 May 2003Request for License Amendment for Core Flow Operating Range Expansion & Oscillation Power Range Monitor (OPRM) Instrumentation
RS-03-075, Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation InstrumentationLaSalle18 April 2003Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation
RS-03-069, Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power OperationsClinton28 March 2003Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations
RS-03-060, Request for License Amendment Related to Application of Alternative Source TermClinton3 April 2003Request for License Amendment Related to Application of Alternative Source Term
RS-03-044, Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.Quad Cities27 February 2003Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.
RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation FunctionDresden
Quad Cities
28 March 2003Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function
RS-03-036, Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve TestingDresden
Quad Cities
14 February 2003Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing
RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8LaSalle18 April 2003Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8
RS-03-026, Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser SystemDresden31 January 2003Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System
RS-03-018, Proposed Alternative Testing Requirements for Containment Isolation Check Valves 1C11-F122 & 1/a175 for Second 10-Year Inservice Testing ProgramClinton3 February 2003Proposed Alternative Testing Requirements for Containment Isolation Check Valves 1C11-F122 & 1/a175 for Second 10-Year Inservice Testing Program
RS-03-013, Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing ProgramClinton29 January 2003Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing Program
RS-03-006, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis.LaSalle13 January 2003Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis.
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup ModeDresden20 December 2002Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode
RS-02-207, Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1Byron
Braidwood
31 December 2002Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1
RS-02-174, Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1Dresden
Quad Cities
10 October 2002Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.LaSalle24 October 2002Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
RS-02-150, Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power OperationsClinton23 August 2002Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations
RS-02-076, Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12LaSalle31 May 2002Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12
RS-02-047, Supplemental Information Supporting a License Amendment Request to Revise Plant System Requirements During Fuel Handling Based on Alternative Source TermClinton1 March 2002Supplemental Information Supporting a License Amendment Request to Revise Plant System Requirements During Fuel Handling Based on Alternative Source Term
RS-02-013, Response to Request for Additional Information Regarding Risk Aspects of Inclined Fuel Transfer System License Amendment Request for Clinton Power StationClinton15 January 2002Response to Request for Additional Information Regarding Risk Aspects of Inclined Fuel Transfer System License Amendment Request for Clinton Power Station
RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup TransformersRobinson27 September 2017License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers
RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source TermRobinson14 September 2016License Amendment Request to Modify the Licensing Basis Alternate Source Term
RNP-RA/16-0046, ISFSIs - Transmittal of Emergency Plan, Emergency Implementing Procedure Revisions, and 10 CFR 50.54(q) Summary of AnalysesRobinson
07200003
07200060
30 June 2016ISFSIs - Transmittal of Emergency Plan, Emergency Implementing Procedure Revisions, and 10 CFR 50.54(q) Summary of Analyses
RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..Robinson19 November 2015Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..
RNP-RA/15-0034, Proposed Changes to Emergency PlanRobinson13 May 2015Proposed Changes to Emergency Plan
RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805Robinson1 April 2015Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805
RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) InstrumentationRobinson10 February 2014License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation
RNP-RA/12-0137, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Revision and 10 CFR 50.54(q) Summary of AnalysisRobinson
07200003
07200060
31 December 2012Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Revision and 10 CFR 50.54(q) Summary of Analysis
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsRobinson7 March 2008Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
RNP-RA/04-0119, Transmittal of Emergency Plan RevisionRobinson
07200003
29 September 2004Transmittal of Emergency Plan Revision
RNP-RA/04-0067, Standard Procedure, Volume 99, Book/Part 99, EGR-NGGC-0153, Rev 10, Engineering Instrument SetpointsRobinson20 August 2004Standard Procedure, Volume 99, Book/Part 99, EGR-NGGC-0153, Rev 10, Engineering Instrument Setpoints
RNP-RA/03-0142, Transmittal of Emergency Procedure RevisionsRobinson19 November 2003Transmittal of Emergency Procedure Revisions
RNP-RA/03-0121, Supplement to Amendment Request Regarding One-Time Extension of Containment Type a Test IntervalRobinson13 October 2003Supplement to Amendment Request Regarding One-Time Extension of Containment Type a Test Interval
RNP-RA/02-0077, Radiological Environmental Operating Report for 2001Robinson15 May 2002Radiological Environmental Operating Report for 2001
RNP-RA/02-0067, Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source TermRobinson10 May 2002Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term
RNP-RA/02-0066, Request for Amendment Re Increase Authorized Reactor Core Power Level from 2399 Mwt to 2339 Mwt (Approximately 1.7 Percent)Robinson16 May 2002Request for Amendment Re Increase Authorized Reactor Core Power Level from 2399 Mwt to 2339 Mwt (Approximately 1.7 Percent)
RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel26 September 2012NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel
RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel26 September 2012NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel
RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 508 December 2008Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50
RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste9 May 2008Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste
Enclosure 3 - Bibliography
Enclosure 2: List of Low-Level Radioactive Waste Compacts and Unaffiliated States
Enclosure 4: List of Recently Issued FSME Generic Communications
RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions30 June 2006NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions
RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions30 June 2006NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions
RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & SafetySummer15 September 1999Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety
RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring InstrumentSummer17 December 1993(VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and SystemsSummer31 May 2018Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems
RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure ChangeSummer6 October 2017(Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change
RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and SystemsSummer25 May 2016Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EASummer7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..Summer7 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..
RC-13-0140, 10 CFR 71.95 Report on the 8-120B CaskSummer
07109168
20 September 201310 CFR 71.95 Report on the 8-120B Cask
RC-13-0069, Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection IntervalSummer16 May 2013Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval
RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 YearsSummer3 April 2013Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years
RC-12-0141, Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST)Summer20 September 2012Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST)
RC-11-0158, License Amendment Request - LAR (11-04569), Technical Specification Change to Extend Integrated Leak Rate Test Interval One-TimeSummer12 October 2011License Amendment Request - LAR (11-04569), Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time
RC-11-0157, License Amendment Request LAR 11-04821, Request for Prior NRC Approval to Exempt Five-High-Head Safety Injection Containment Isolation Valves from Local Leak Rate Testing RequirementsSummer12 October 2011License Amendment Request LAR 11-04821, Request for Prior NRC Approval to Exempt Five-High-Head Safety Injection Containment Isolation Valves from Local Leak Rate Testing Requirements
RC-11-0094, Technical Specification Bases Revision Updated Through June 2011Summer31 August 2011Technical Specification Bases Revision Updated Through June 2011
RC-11-0052, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.Summer2 May 2011License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.
RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67Summer17 February 2009License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67
RC-07-0025, License Amendment Request - LAR 05-3594 Steam Generator Tube IntegritySummer15 February 2007License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity
RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube IntegritySummer24 May 2006License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity
RC-04-0074, License Amendment Request - LAR 03-4159 Elimination of Hydrogen Recombiners and Change to Hydrogen Analyzers Using the Consolidated Line Item Improvement ProcessSummer21 May 2004License Amendment Request - LAR 03-4159 Elimination of Hydrogen Recombiners and Change to Hydrogen Analyzers Using the Consolidated Line Item Improvement Process
RC-02-0123, Application for Renewed Operating License, Appendix F Severe Accident Mitigation AlternativesSummer6 August 2002Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives
RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bRiver Bend27 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsRiver Bend4 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.River Bend18 November 2019Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.
RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)River Bend20 December 2018Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
RBG-47918, Removal of the Table of Contents from the Technical SpecificationsRiver Bend29 November 2018Removal of the Table of Contents from the Technical Specifications
RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6River Bend18 October 2018Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6
RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)River Bend24 July 2018Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
RBG-47883, Amendment 1 to License Renewal ApplicationRiver Bend2 August 2018Amendment 1 to License Renewal Application
RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)River Bend10 July 2018Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
RBG-47859, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlRiver Bend26 April 2018Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control