Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21281A171 | 7 December 2021 | General Atomics Triga Reactor Facility - Approval of License Termination Based on the Final Status Survey Report and Supporting Information | |
ML21232A698 | 28 September 2021 | General Atomics Triga Reactors - U.S. EPA MOU Consultation Letter | |
ML21246A270 | 18 May 2021 | Email from P. Pater, Ga, to M. Doell, NRC - Ga Triga Fssr Clarification Items | |
ML21246A264 | 18 May 2021 | Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1 | |
ML21246A265 | 5 May 2021 | Triga Sr-90/Cs-137 Ratio Tables | |
ML21246A258 | 4 May 2021 | Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio | |
ML21246A271 | 26 February 2021 | Email from P. Pater, Ga, to M. Doell, NRC - Preliminary NRC Musings on the Ga Fssr | |
ML21246A268 | 25 February 2021 | Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results | |
ML21056A025 | 23 February 2021 | General Atomics Triga Reactors, Acceptance of Final Status Survey Report in Support of License Termination (EPID No. L-2019-DF1-0000) | |
ML21246A256 | 3 February 2021 | GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report | |
ML21012A276 | 31 December 2020 | Attachment G - General Atomics Triga Reactor Fssr Gamma Spectroscopy Results | |
ML21012A275 | 31 December 2020 | Attachment a - General Atomics Triga Reactor Fssr Survey Unit Map | |
ML21012A274 | 31 December 2020 | Final Status Survey Report (Fssr) for the General Atomics Triga Reactor Facility | |
ML21012A273 | 14 December 2020 | General Atomics Triga Reactor Facility Final Status Survey Report -Cover Letter | |
ML21246A259 | 23 September 2020 | Case Summary of Scenario 3 Worker External Exposure | |
ML21246A263 | 23 September 2020 | Triga Final Buried Pipe Scenario 1 | |
ML21246A266 | 23 September 2020 | Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20 | |
ML20161A189 | 8 June 2020 | General Atomics 050-00163, Soil Sample Results 2020 | |
IR 05000089/2020001 | 30 March 2020 | General Atomics - NRC Inspection Report 05000089/2020001; 05000163/2020001 | Earthquake |
ML20049A039 | 5 February 2020 | Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020 | |
ML21246A260 | 12 December 2019 | Ta 11 Client Soil Sample Results | |
ML19337D382 | 26 November 2019 | General Atomics Confirmatory Survey Report from Orau | |
ML21246A267 | 26 November 2019 | 5339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California | |
ML21246A261 | 4 November 2019 | Ta Client Pipe Scale Results | |
ML21246A272 | 25 October 2019 | Ga Gamma Spectrum Analysis Outside Pipe Scale Report | |
ML21246A255 | 17 September 2019 | Letter to M. Doell, NRC, from M. Grogan, Ga - Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 1 | |
ML19266A509 | 17 September 2019 | General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1 | |
IR 05000089/2019001 | 6 September 2019 | General Atomics - NRC Inspection Report 050-00089/2019-001; 050 00163/2019-001 | |
ML21246A253 | 19 August 2019 | Ga Gamma Spectrum Analysis Pipe Inner Scale Report | |
ML19247C549 | 2 August 2019 | Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility | |
ML19247C586 | 15 July 2019 | Triga Reactor Facility Final Status Survey Plan - July 2019 | |
ML21246A269 | 18 April 2019 | DDI-001-JSG-19 Final Update to 06/30/2019 and Application of Radionuclide Scaling Factors for Bldg. 21 04-18-2019 - Signed | |
ML19079A246 | 18 March 2019 | Submittal of General Atomics Triga Mark 1 and Mark F Annual Reports for Calendar Year 2018 (3 Copies Each) | |
IR 05000089/2018001 | 19 November 2018 | General Atomics; NRC Inspection Report 050-00089/18-001, 050-00163/18-001, and 070-00734/18-001 | |
ML18303A124 | 19 March 2018 | General Atomics Triga Mark I and Mark F Annual Reports for 2017 | |
ML18303A172 | 17 March 2017 | General Atomics Triga Mark I and Mark F Annual Reports for 2016 | |
ML16285A300 | 1 February 2017 | Ga Release Criteria Approval Letter | |
ML16242A319 | 15 August 2016 | General Atomics, Request for Approval of Release Criteria for General Atomics' Triga Reactor Facility | |
CAC:L53111 | 15 August 2016 | ||
ML18303A151 | 24 March 2016 | General Atomics Triga Mark I and Mark F Annual Reports for 2015 | |
ML15362A506 | 18 December 2015 | Request for Approval of Release Criteria for General Atomics Triga Reactor Facility | |
IR 05000089/2015001 | 24 November 2015 | IR 05000089/2015001, 05000163/2015001, and 07000734/2015001, September 8-9, 2015, General Atomics | |
ML15317A340 | 15 October 2015 | Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA | |
ML14290A486 | 3 June 2015 | Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures | |
ML15273A059 | 17 March 2015 | General Atomics Triga Mark I and Mark F Annual Reports for Calendar Year 2014 | |
ML15069A370 | 20 February 2015 | General Atomics Transmittal of Semiannual Effluent Report | |
ML14177A760 | 19 June 2014 | FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014 | |
ML14073A172 | 4 March 2014 | General Atomics, Triga, Mark I Reactor - Annual Report for Calendar Year 2013 | |
ML14073A171 | 4 March 2014 | General Atomics, Submittal of Mark I and Mark F Annual Reports for Calendar Year 2013 | |
ML14073A173 | 4 March 2014 | General Atomics, Triga, Mark F Reactor, Annual Report for Calendar Year 2013 |