Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23326A039 | 24 January 2024 | Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
ML24023A065 | 23 January 2024 | Inservice Inspection Request for Information | |
0CAN012402, Emergency Plan Revision 50 | 17 January 2024 | Emergency Plan Revision 50 | |
2CAN012401, U.S. Additional Protocol | 17 January 2024 | U.S. Additional Protocol | |
ML24017A158 | 17 January 2024 | Submittal of Emergency Plan Revision 50 | |
PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | 11 January 2024 | Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | |
2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | 11 January 2024 | Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Safe Shutdown High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Large early release frequency TORMIS Tornado Missile Risk Evaluator Maintenance Rule Program Offsite Circuit |
0CAN012401, Registration of Cask Use | 10 January 2024 | Registration of Cask Use | |
IR 05000313/2023420 | 10 January 2024 | Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 | |
IR 05000313/2023402 | 2 January 2024 | Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23354A002 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) | 14 December 2023 | Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) | Probabilistic Risk Assessment Power change Exclusive Use Affidavit |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
IR 05000313/2023405 | 12 December 2023 | Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 | Affidavit |
ML23341A083 | 11 December 2023 | Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter | Affidavit |
ML23305A092 | 7 December 2023 | Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b | Tornado Missile Internal Flooding Probabilistic Risk Assessment Emergency Lighting FLEX TORMIS Battery sizing |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23275A207 | 28 November 2023 | Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | Anticipated operational occurrence Surveillance Frequency Control Program Safeguards Contingency Plan Nonconservative Technical Specifications Fuel cladding |
ML23325A141 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
IR 05000313/2023003 | 21 November 2023 | Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Job Performance Measure Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Downpower |
2CAN112302, Submittal of Amendment 31 to Safety Analysis Report | 16 November 2023 | Submittal of Amendment 31 to Safety Analysis Report | Anticipated operational occurrence Hydrostatic Temporary Modification Aging Management Surveillance Frequency Control Program Fuel cladding |
ML23313A096 | 13 November 2023 | Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Operability Determination Fire Protection Program Downpower |
ML23243B045 | 13 November 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
ML23296A100 | 24 October 2023 | Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR | |
0CAN102303, Registration of Cask Use | 24 October 2023 | Registration of Cask Use | |
ML23285A190 | 11 October 2023 | Enclosures 1 - 4: Summary of Changes to ANO Emergency Plan, Rev. 49, Emergency Plan, Rev. 49, Summary of Changes to ANO On-Shift Staffing Analysis, Rev. 3 and Emergency Plan On-Shift Staffing Analysis, Rev. 3 | Safe Shutdown Boric Acid Health Physics Network High Radiation Area Offsite Dose Calculation Manual B.5.b Process Control Program Severe Accident Management Guideline Earthquake Deep Dose Equivalent Pandemic Fuel cladding Minimum staff Fire Protection Program Siren Exclusive Use Overexposure |
0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 | 11 October 2023 | (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 | |
IR 05000313/2023011 | 10 October 2023 | Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 | Commercial Grade Dedication |
0CAN102301, Evacuation Time Estimate (ETE) Study | 4 October 2023 | Evacuation Time Estimate (ETE) Study | Pandemic COVID19 Siren |
PMNS20231101, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 | 2 October 2023 | Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 | |
ML23199A019 | 25 September 2023 | Authorization and Safety Evaluation for Alternative Request ANO-CISI-002 | |
ML23269A023 | 22 September 2023 | NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions | Safe Shutdown High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Open Phase Condition Large early release frequency Tornado Missile Risk Evaluator Maintenance Rule Program |
1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | 21 September 2023 | Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Safe Shutdown Boric Acid High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Tornado Missile Protection Surveillance Frequency Control Program Large early release frequency TORMIS Tornado Missile Risk Evaluator Offsite Circuit |
IR 05000313/2023010 | 20 September 2023 | Biennial Problem Identification and Resolution Inspection Report 05000313/2023010 and 05000368/2023010 | Mission time Past operability Condition Adverse to Quality Significance Determination Process Operability Determination |
ML23257A241 | 19 September 2023 | Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 | Anticipated operational occurrence |
0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) | 14 September 2023 | Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) | |
2CAN092301, Reply to a Notice of Violation | 8 September 2023 | Reply to a Notice of Violation | Condition Adverse to Quality |
0CAN092301, Emergency Plan Implementing Procedure Revision | 5 September 2023 | Emergency Plan Implementing Procedure Revision | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Grace period Unidentified leakage |
ML23240A341 | 28 August 2023 | NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | |
IR 05000313/2023005 | 21 August 2023 | Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle | Fitness for Duty Commercial Grade Dedication Cyber Security |
0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 | 17 August 2023 | Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 |