Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 5482911 August 2020 20:22:00At 1334 EDT on Tuesday August 11th, the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) Ventilation System lost power due to a trip of the Station Blackout (SBO) electric power supply breaker. The trip was due to a fault at the Conowingo Dam and Conowingo was not able to realign electric power to the SBO within an hour. Power restoration is complete and TSC Ventilation was restored at 1725 EDT. This report is being submitted pursuant to 10CFR 50.72(b)(3)(xiii) as a Major Loss of Emergency Preparedness Capabilities due to a reduction in the effectiveness of the Onsite Technical Support Center (TSC). The NRC Resident Inspector has been notified.