Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 5532524 June 2021 14:56:00This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the Technical Support Center (TSC) supply fan belt had failed, which affects the functionality of an emergency response facility. Corrective maintenance activities will be performed to restore functionality. The work includes replacing the failed belt and restarting the TSC supply fan. The work duration is approximately 8 hours. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. (The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency.) There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector and Illinois Emergency Management Agency have been notified.