 Entered dateEvent description
ENS 5484921 August 2020 12:53:00On August 21, 2020 at 0908 CDT, River Bend Station was operating at 100% reactor power when reactor recirculation pump 'B' tripped. At 0918 CDT, a manual reactor scram was inserted at 67% reactor power after receiving indications of thermal hydraulic instability as indicated by flux oscillations on the period based detection system (PBDS) and average power range monitors (APRMs). All control rods fully inserted and there were no complications. All systems responded as designed. Currently River Bend Station Unit 1 is stable and pressure is being maintained using turbine bypass valves. This event is being reported under 10 CFR 50.72(b)(2)(iv)(B), as any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical and 10 CFR 50.72 (b)(3)(iv)(A) Specified System Actuation as result of Group 3 isolations. NRC Resident Inspector has been briefed on this event. No radiological releases have occurred due to this event from the unit.
ENS 5434824 October 2019 16:25:00At 1035 CDT the Automatic Depressurization System (ADS) was rendered inoperable due to the failure of the 'A' Safety Vent Valve (SVV) Compressor (SVV-C4A) to manually start with SVV-C4B tagged out. System pressure slowly dropped below 131 psig (normal pressure is 165 psig). This caused the ADS safety relief valves to be declared inoperable. The station entered Technical Specification 3.5.1 Condition G. The Required Action was to be in Mode 3 in 12 hours. As a result, the station was in a condition that could have prevented the fulfillment of a safety function. The breaker for SVV-C4B was reset and the clearance for SVV-V4B was released. System pressure was restored to greater than 131 psig at 1116 CDT which allowed exit of the action statement to be in Mode 3 in 12 hours. System parameters are currently stable in the normal pressure range. Investigation for the cause of the system failure is ongoing. No radiological releases have occurred due to this event from the unit. The licensee notified the NRC Resident Inspector.
ENS 540961 June 2019 03:15:00

At 2345 CDT at River Bend Station (RBS) Unit 1, a manual Reactor scram was inserted in anticipation of receiving an automatic Reactor Water Level 3 (9.7") scram due to the isolation of the 'B' Heater String with the 'A' Heater String already isolated. The 'B' heater string isolation caused loss of suction and subsequent trip of the running Feed Water Pumps 'A' and 'C'. All control rods fully inserted with no issues. Subsequently Reactor level was controlled by the Reactor Core Isolation Cooling (RCIC) system. Feed Water Pump 'C' was restored 4 minutes after the initial trip and the RCIC system secured. Currently RBS-1 is stable and is being cooled down using Turbine Bypass Valves. No radiological releases have occurred due to this event from the unit. The plant is currently under a normal shutdown electrical lineup. The licensee notified the NRC Resident Inspector.

  • * * UPDATE AT 1603 EDT ON 6/10/19 FROM ALFONSO CROEZE TO JEFF HERRERA * * *

This amended event notification is being made to provide additional information that was not included in the original notification made on 6/1/19 at 0315 EDT. This event was reportable under 10 CFR 50.72(b)(3)(iv)(A) which was not annotated or described in the original report. Forty-two minutes after the Feed Water Pump 'C' was started, the pump tripped causing a Reactor Water Level 3 (9.7") RPS actuation. Feed Water was restored five minutes later using the Feed Water Pump 'A'. The NRC Resident Inspector has been notified. Notified the R4DO (Warnick).