Issue date | Title | Topic | |
---|---|---|---|
ML24036A108 | 6 February 2024 | Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) | |
ML24031A660 | 31 January 2024 | International, Submittal of Rsi Responses for Revision to HI-STORM Umax CoC Amendments 0, 1, and 2 | |
ML24031A664 | 31 January 2024 | International, HI-STORM Umax FSAR Proposed FSAR Revision 4.1A | |
ML24031A663 | 31 January 2024 | International, HI-STORM Umax FSAR Proposed FSAR Revision 3.1A | |
ML24031A662 | 31 January 2024 | International, HI-STORM Umax FSAR Proposed FSAR Revision 2.1A | |
ML24031A661 | 31 January 2024 | International, Rsi Responses on HI-STORM Umax Revisions to Amendments 0, 1, and 2 | |
ML24030A979 | 30 January 2024 | Enclosure 3: HI-STAR 370 Safety Analysis Report (SAR) HI-2220077, Revision 0 (Non-Proprietary) | |
ML24030A976 | 30 January 2024 | International, Application Request for a Certificate of Compliance (CoC) for Holtec'S Model No. HI-STAR 370 Type B(U)-96 Transportation Package | |
ML24030A977 | 30 January 2024 | Enclosure 1: Holtec Proposed Certificate of Compliance (No. 9401) for the HI-STAR 370 (Holtec Proprietary Information) | |
ML24030A980 | 25 January 2024 | Enclosure 4: Affidavit Pursuant to 10 CFR 2.390 to Withhold Information from Public Disclosure | Affidavit |
ML24023A581 | 23 January 2024 | Final Brief of Intervenor Holtec International | Earthquake |
ML24018A201 | 18 January 2024 | Attachment 2 (Non-Proprietary): HI-2200343-A, Topical Report for Allowance of Heat Load Patterns in HI-Storm 100 and HI-Storm FW Systems | |
ML24018A202 | 18 January 2024 | Attachment 3: Affidavit Pursuant to 10CFR2.390 | Affidavit |
ML24018A199 | 18 January 2024 | International, Administrative Change to HI-2200343-A | |
ML24017A184 | 16 January 2024 | Deferred Joint Appendix - Volume II of II | Incorporated by reference Decommissioning Funding Plan Aging Management Design basis earthquake License Renewal Earthquake Pandemic COVID-19 Fuel cladding Environmental Justice Exclusive Use Affidavit |
ML24017A183 | 16 January 2024 | Ja Volume 1 | |
ML23355A081 | 21 December 2023 | International - Withdrawal of HI-STORM FW Multipurpose Canister Storage System Amendment 9 | |
ML23355A084 | 21 December 2023 | International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment | |
ML23348A309 | 14 December 2023 | Attachment 7 - Affidavit of Kimberly Manzione | Affidavit |
ML23348A303 | 14 December 2023 | Attachment 1 - HI-STORM Umax Amendment 5 Summary of Proposed Changes | |
ML23348A302 | 14 December 2023 | International HI-STORM Umax Amendment 5 Submittal | Affidavit |
ML23348A304 | 14 December 2023 | Attachment 2 - HI-STORM Umax Amendment 5 Proposed Certificate of Compliance | Time of Discovery Design basis earthquake Fuel cladding Liquid penetrant |
ML23348A306 | 14 December 2023 | Attachment 4 - Proposed HI-STORM Umax FSAR Revision 8 - Changed Pages | Earthquake |
PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | 12 December 2023 | Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | Cyber Security |
ML23345A023 | 8 December 2023 | Intervenor Brief for Holtec International | |
ML23338A306 | 4 December 2023 | Attachment 1: HI-STORM 100 Amendment 18 RAI Responses (non-proprietary) | |
ML23338A310 | 4 December 2023 | Attachment 5: Holtec International, Affidavit | Affidavit |
ML23338A308 | 4 December 2023 | Attachment 3: HI-STORM 100 Amendment 18 Proposed FSAR Revision 22E Pages (non-proprietary) | Time to boil |
ML23338A305 | 4 December 2023 | International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 | Affidavit |
ML23338A007 | 1 December 2023 | Initial Brief of Intervenor Holtec International | Earthquake |
ML23334A191 | 30 November 2023 | International, Submittal of Topical Report HI-2210161-A Version | |
ML23334A184 | 30 November 2023 | International, Submittal of HI-STAR 80 Safety Analysis Report, Revision 5 | Affidavit |
ML23334A192 | 30 November 2023 | HI-2210161-A, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems | Fuel cladding |
ML23334A186 | 30 November 2023 | International, Safety Analysis Report on the HI-STAR 80 Package, Revision 5 | Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Finite Element Analysis Design basis earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Exclusive Use Depleted uranium |
ML23321A220 | 17 November 2023 | International, Affidavit | Affidavit |
ML23321A247 | 17 November 2023 | Attachment 1: Holtec International - Summary of Additional Clarifications/Changes Submitted for Review | |
ML23321A219 | 17 November 2023 | International, NRC Clarification Questions from EA-23-044 Holtec Pec Presentation ML23297A261 (Edited Excerpt from the Pec Transcript ML23307A107) | Tornado-Generated Missile Earthquake |
ML23321A249 | 17 November 2023 | Attachment 3: Holtec International - HI-STORM FW FSAR Proposed Revision Ioj, Changed Pages (non-proprietary) | Fuel cladding |
ML23321A254 | 17 November 2023 | Attachment 8: Holtec International - Affidavit | Affidavit |
ML23321A246 | 17 November 2023 | HI-STORM FW Amendment 7 RAI Response Clarifications (Part 3) | Affidavit |
ML23321A217 | 17 November 2023 | International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference | Affidavit |
ML23297A261 | 25 October 2023 | CBS Pec Presentation Slides | Exemption Request |
ML23289A213 | 16 October 2023 | International - Schedule for Responses to HI-STORM FW Amendment 9 Requests for Additional Information | |
ML23263B123 | 20 September 2023 | HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information |