Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18095A488 | 17 September 1990 | Requests Regional Waiver of Compliance from Tech Spec 3.6.2.3, Containment Cooling Sys. Waiver Requested in Order to Allow Replacement of Containment Fan Cooler Unit Motor #22 W/O Requiring Plant Shutdown | Shutdown Margin Probabilistic Risk Assessment |
ML18095A490 | 13 September 1990 | Provides Supplemental Info Applicable to Clarification of 10CFR50,App R Exemption Request Re Fire Suppression Sys for Panel 335,per NRC Request | Exemption Request |
ML20059E682 | 4 September 1990 | Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld | |
ML18095A464 | 31 August 1990 | Forwards Revised Response to NRC Bulletin 88-004 Re Potential pump-to-pump Interaction.Util Pursuing Permanent Solution to Issue & Will Implement Appropriate Permanent Field Change by End of Unit 1 10th Refueling Outage | |
ML18095A462 | 31 August 1990 | Provides Revised Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Only HXs Exhibiting Unsatisfactory Test Results Will Be Inspected & Possibly Cleaned | |
ML18095A443 | 30 August 1990 | Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Rev 6 to Odcm. | Offsite Dose Calculation Manual |
ML18095A453 | 30 August 1990 | Forwards RERR-28, Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revised Odcm.W/O Revised ODCM | Offsite Dose Calculation Manual |
ML18095A439 | 29 August 1990 | Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances | Fitness for Duty |
ML18095A442 | 28 August 1990 | Clarifies 900710 Request for Amends to Licenses DPR-70 & DPR-75,changing Sections I & M.Under Proposed Change,Section I Should Be Changed to Read Section 2.J for License DPR-70 & Section M Changed to Read Section 2.N for License DPR-75 | |
ML20059B661 | 22 August 1990 | Confirms That 10 Anchor/Darling Model S350W Swing Check Valves Installed at Plant,Per NRC Bulletin 89-002.All 18 Valves Inspected & Retaining Block Studs Replaced W/Upgraded Matl.No Crack Noted on Any Studs Which Were Replaced | Anchor Darling |
ML20059C286 | 21 August 1990 | Provides Correction to 900810 Response to Request for Addl Info Re Util Request for Restatement of OL Expiration Dates | |
ML18095A415 | 10 August 1990 | Forwards Response to Request for Addl Info Re Reinstatement of OL Expiration Dates Based on Original Issuance of Ols. Advises That Correct Expiration Date for OL Proposed to Be 200418 | NJPDES Biofouling |
ML18095A409 | 9 August 1990 | Forwards Responses to NRC Comments Re Plant Simulator Certification for 10CFR55.45(b)(2),per 891228 Ltr | Boric Acid Shutdown Margin Loop seal Fire Barrier Stroke time Locked High Radiation Area Missed surveillance Fire Watch Power change |
ML18095A406 | 8 August 1990 | Forwards Corrected marked-up Pages for Tech Spec Table 3.3-11 Re Subcooling Margin Monitor & Reactor Vessel Level Instrumentation Sys,Per 900223 Ltr.Administrative Changes Made as Indicated | |
ML18095A386 | 30 July 1990 | Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment | |
ML18095A366 | 26 July 1990 | Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations | |
ML18095A376 | 26 July 1990 | Forwards Decommissioning Repts & Certification of Financial Assurance for Plants | |
ML18095A372 | 24 July 1990 | Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 | |
ML18095A375 | 18 July 1990 | Provides Status of Commitments Made to NRC by Util in 900109 Ltr Re NUREG-0737,Item II.D.1,per 900628 Telcon | |
ML18095A374 | 18 July 1990 | Provides Supplemental Info Re Facility sub-cooling Margin Monitor | |
ML18095A361 | 18 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. | |
ML18095A362 | 18 July 1990 | Forwards Corrected Tech Spec Page 3/4 3-5 for License Change Request 89-12 Submitted on 891227 & 900521 | |
ML18095A359 | 13 July 1990 | Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items | |
ML18095A347 | 11 July 1990 | Responds to NRC 900611 Ltr Re Violations Noted in Insp Repts 50-272/90-14 & 50-311/90-14.Corrective Actions:Directive from Radiation Protection Mgt to All Radiation Protection Personnel Issued Re Control of Compliance Agreement Sheets | |
ML18095A345 | 10 July 1990 | Forwards Addl Info Re License Change Request 89-03 Re Reactor Trip Sys Instrumentation | |
ML18095A346 | 10 July 1990 | Responds to NRC 900608 Ltr Re Violations Noted in Insp Repts 50-272/90-12 & 50-311/90-12.Corrective Actions:Assessment of ECCS & Component Performance Undertaken & ECCS Flow Testing Procedure Upgraded to Address Human Factors | |
ML18095A349 | 10 July 1990 | Forwards Jn Steinmetz of Westinghouse 900614 Ltr Re Reassessment of Util Response to Bulletin 88-002 | |
ML18095A348 | 10 July 1990 | Submits Supplemental Rept Identifying Root Cause of Missed Commitment & Corrective Actions to Assure Future Compliance Re Implementation of Mods to Facility PASS | |
ML18095A344 | 9 July 1990 | Provides Written Notification Re Change in Calculated Peak Clad Temp,Per 900606 Verbal Notification | |
ML18095A328 | 2 July 1990 | Responds to NRC 900530 Ltr Re Violations Noted in Insp Repts 50-272/90-09 & 50-311/90-09.Corrective Actions:Util Intends to Use Nuclear Shift Supervisor as Procedure Reader & EOP, Rev 2 Under Development | |
ML18095A330 | 2 July 1990 | Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl | Scram Discharge Volume |
ML18095A339 | 29 June 1990 | Forwards Correction to 890913 License Change Request 88-09, Consisting of Tech Spec Page 3/4 4-13 | |
ML18095A322 | 28 June 1990 | Provides Supplemental Info Re 900223 Proposed Revs to Tech Specs for Reactor Vessel Level Instrumentation Sys.Tables 3.3-11a & 3.3-11b Should Be Combined Into Single Table | |
ML18095A323 | 28 June 1990 | Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits | |
ML18095A324 | 28 June 1990 | Forwards Retyped Pages to 871224 License Change Request 87-15 & Modified,Per 900620 Ltr | |
ML18095A321 | 26 June 1990 | Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout | |
ML18095A316 | 25 June 1990 | Forwards Supplemental Info Re Response to Generic Ltr 88-14. All Committed Actions Complete as of 900613 | |
ML18095A314 | 25 June 1990 | Provides Schedule Change for Implementation of Control Room Mods.Schedule Modified to Address Overhead Annunciator Human Engineering Discrepancies During Phase III | |
ML18095A320 | 25 June 1990 | Responds to NRC 900524 Ltr Re Violations Noted in Insp Repts 50-272/90-11 & 50-311/90-11.Corrective Actions:All Overdue Operations & Maint Procedure Files Reviewed for Outstanding Rev Requests & Procedure Upgrade Program Initiated | |
ML18095A300 | 20 June 1990 | Provides Addl Info Re Application for Amend to Licenses DPR-70 & DPR-75 Concerning Turbine Valve Surveillance Interval,Per 900320 Request.Util Adding Direction to Personnel If Unnacceptable Flaws Found | |
ML20043H622 | 20 June 1990 | Provides Supplemental Info Re NRC Bulletin 88-008 for Fifth Refueling Outage.Detailed Test Rept Being Prepared to Document Results of Each Individual Insp Re Insulation, Hangers & High Energy Break Areas | |
ML18095A299 | 20 June 1990 | Forwards Westinghouse Affidavit Supporting 900412 Request for Withholding Proprietary Info from Public Disclosure Per 10CFR2.790 | |
ML18095A272 | 8 June 1990 | Responds to NRC 900329 Ltr Re Weaknesses Noted in Insp Repts 50-272/90-80 & 50-311/90-80.Corrective Actions:Fire Doors Placed on Blanket Preventive Maint Work Order & Damaged Fire Doors Will Be Repaired Immediately | Fire Watch |
ML18095A271 | 6 June 1990 | Submits Info in Support of 900522 Verbal Request for Relief from Requirements of ASME Section XI | Safe Shutdown Temporary Modification Through Wall Leak |
ML18095A261 | 1 June 1990 | Forwards Corrected Operating Data Rept, Page for Apr 1990 Monthly Operating Rept | |
ML18095A252 | 1 June 1990 | Forwards Application in Support of Request for Renewal of NJPDES Permit NJ0005622,per Requirements of Subsection 3.2 of Plant Environ Protection Plan,Nonradiological | Grab sample NJPDES Biofouling |
ML18095A259 | 1 June 1990 | Forwards Corrected Unit Shutdown & Power Reductions, Page for Apr 1990 Monthly Operating Rept | |
ML18095A241 | 30 May 1990 | Submits Special Rept 90-4 Addressing Steam Generator Tube Plugged During Fifth Refueling Outage.Plugging Completed on 900516.Cause of Tube Degradation Attributed to Normal Wear Due to Erosion/Corrosion Factors | |
ML18095A243 | 30 May 1990 | Informs of Util Plans Re Facility Cycle 6 Reload Core, Expected to Achieve Burnup of 16600 Mwd/Mtu.All Postulated Events within Allowable Limits Based on Review of Basis of Cycle 6 Reload Analysis & Westinghouse SER | |
ML18095A253 | 29 May 1990 | Provides Addl Info Re End of Life Moderator Temp Coefficient.Feedback Used in Steam Line Break Has No Relationship to Full Power Moderator Density Coefficient |