ML20065D05117 September 1990Forwards Objectives & Scope of 901205 Emergency Plan ExerciseHigh Radiation Area
ML20064A70914 September 1990Forwards Endorsement 133 to Nelia Policy NF-187 & Endorsement 116 to Maelu Policy MF-54
ML20059F4894 September 1990Forwards Listing of Changes,Tests & Experiments Completed During Month of Aug 1990 for Plant
ML20059B97228 August 1990Forwards Reactor Head & Upper Shell Insp Plan,Per 900419 Meeting.Insp Plan Does Not Encompass Uppermost shell-to- Shell Weld Due to Technological LimitationsLiquid penetrant
ML20059F03127 August 1990Provides Schedule for Completion of Installation of Mods to Plants Reactor Water Level Instrumentation,Per Generic Ltr 84-23.Penetrations Will Be Installed During Outage 13 for Dresden & During Outage 12 for Quad-Cities
ML20059E95327 August 1990Forwards Summary of Fabrication History for Upper Reactor Vessel,Per 900419 Technical Meeting.Summary Indicates That Fabrication Mismatches,Considered to Be Significant for Development of Insp Plan,Identified at head-to-flange WeldHydrostatic
ML20059C72023 August 1990Forwards Effluent & Waste Disposal Semiannual Rept,Jan-June 1990 Gaseous Effluents-Summation of All Releases & Rev 8 to Quad-Cities Station Process Control Program for Processing of Radioactive Wet WasteProcess Control Program
ML20058P3489 August 1990Forwards Summary of Fuel Performance,End of Cycle 10,May 1990. No Leakage or Fuel Failure Noted
ML20058M8227 August 1990Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective ActionsScram Discharge Volume
ML20058M8046 August 1990Advises That W/Completion of Operator Training Program,Plant SPDS Meets Requirements Delineated in NUREG-0737,Suppl 1
ML20058M8596 August 1990Forwards Rept of Metallurgical Exam That Revealed No Evidence of Defects,Porosity or Slag in Weld Overlay. Rept Responds to IGSCC Insp Performed on Facility IGSCC Susceptible PipingWeld Overlay
ML20058M4101 August 1990Forwards Listing of Changes,Tests & Experiments Completed During Month of Jul 1990 for Plant
ML20058M82931 July 1990Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements of Corrective Actions. Status of Implementation of Generic Safety Issues EnclScram Discharge Volume
ML20055J16326 July 1990Forwards Reactor Containment Bldg Integrated Leak Rate Test Quad-Cities Nuclear Power Station Unit 2,900427-28, & Related Apps Describing Type a Test,Per 10CFR50,App J, Section V.B.1.Next Test Scheduled for Fall 1991
ML20055H76325 July 1990Forwards Financial Info Re Decommissioning of Plants
ML20055G63318 July 1990Responds to Generic Ltr 89-06 Re SPDS to Meet Requirements of Suppl 1 to NUREG-0737.SPDS Lesson Plan Incorporated Into Initial License Class Training Program
ML17202L2862 July 1990Forwards Dresden II Upper Vessel Contract Variation Review, La Salle II Upper Vessel Fabrication Summary & Quad-Cities II Upper Vessel Fabrication Summary.
ML20055D47429 June 1990Forwards Annual FSAR Update for Quad-Cities Station
ML20055D43429 June 1990Forwards Comm Ed Rept on Evaluation of Cracking in Quad- Cities Unit 2 Reactor Head, Per Commitment Made at 900419 Meeting W/Nrr.Rept Concludes That Cracks Caused by Interdendritic Stress Corrosion Cracking Mechanism
ML20055C85515 June 1990Forwards Special Neutron Attenuation Test for High Density Spent Fuel Racks (Wet), Final Rept.Rept Provides Results of Neutron Radioassay Measurement Program Conducted During Fall,1989 Refueling Outage
ML20043D7664 June 1990Responds to J Lieberman 900501 Ltr Re Rl Dickherber. Confidence in Dickherber Performance in Future for Nonlicensed Duties Can Be Based Upon Demonstrated Record of Good Past Performance
ML20043D7694 June 1990Responds to 900501 Ltr Re Work Hours for Dickherber.During Outage,Dickherber Worked Extended Hours Traditionally Associated W/Refueling ActivitiesFitness for Duty
ML20043G4252 June 1990Forwards Listing of Changes,Tests & Experiments Completed During May 1990
ML20043D3201 June 1990Forwards Rev 24 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20043B66822 May 1990Forwards Proposed Changes to SER Re Hot Shutdown Repairs in Event of Fire,Per 10CFR50,App R Section Iii.G Covering Spurious Operations & High Impedance Faults & Electrical Isolation DeficiencySafe Shutdown
Exemption Request
ML20043A46810 May 1990Forwards Proposed Changes to 880721 SER Re App R Section Iii.G Exemption for Fire Zones 1.1.1.1S & 1.1.1.2,southern & Northern Torus Level in Unit 1 Reactor Bldg Column & Unit 1 Reactor Bldg Elevations 623 Ft & 647 FtSafe Shutdown
Fire Barrier
Exemption Request
ML20042H0013 May 1990Forwards Listing of Changes,Tests, & Experiments Completed During Apr 1990Post Accident Monitoring
ML20042G3502 May 1990Responds to NRC 900404 Ltr Re Violations Noted in Insp Repts 50-254/90-02 & 50-265/90-02.Corrective Actions:Continuous Fire Watch Initiated & Training Conducted on Procedure RevContinuous fire watch
Fire Protection Program
Fire Watch
ML20042F1181 May 1990Advises of Listed Value for Secondary Containment,Per NRC Request for Addl Info Re LER 50-254/87-025.Value Based on Info Contained in Plant FSAR
ML20042F0691 May 1990Responds to Generic Ltr 83-28,Item 4.5.3 Re Reactor Protection Sys on-line Functional Test Intervals.Endorses Two BWR Owners Group Topical Repts NEDC-30844 & NEDC-30851P Generic Evaluations
ML20042F1221 May 1990Forwards Preliminary Rept of IGSCC Insp Results.Flaw Indication Detected in Weld Overlay Matl of Weld 02J-S3 & Removed by Boat Sample & Std Weld Overlay Thickness Restored.Final Rept Will Be Forwarded within 30 DaysWeld Overlay
Liquid penetrant
ML20042E44911 April 1990Forwards Request for Rev to Previous NRC Exemption Approval on 860625 Re Combustible Load ValuesSafe Shutdown
Fire Barrier
Exemption Request
ML20042F03523 March 1990Forwards Part 3 of 1989 Operating Rept.W/O Rept
ML19330D51614 March 1990Advises That Revs to Inservice Testing Program & Implementation Procedures Will Be Completed by 900629,per Generic Ltr 89-04Decommissioning Funding Plan
ML20012C0728 March 1990Comments on SALP Board Repts 50-254/89-01 & 50-265/89-01 for Oct 1988 to Nov 1989.Util Appreciates NRC Recognition of Overall Improvements in Areas of Operation & Emergency Preparedness & Good Performance in Area of Security
ML20012B5922 March 1990Forwards Listing of Changes,Tests & Experiments Computed During Month of Feb 1990 for Plant
ML20006F3368 February 1990Responds to NRC Ltr 900110 Ltr Re Violations Noted in Insp Repts 50-254/89-25 & 50-265/89-25.Corrective Actions:Safety Evaluations Submitted Via 900116 Ltr & Table of Content Will Be Completed for 1989 FSAR Update to Be Submitted by 900630
ML20012A9558 February 1990Responds to Violations Noted in Insp Repts 50-254/89-26 & 50-265/89-26.Corrective Action:Procedure Qis 47-1 Revised to Include Requirement That Equalizing Valve Be Open During Isolation of TransmitterHydrostatic
ML20011E7136 February 1990Forwards Reactor Containment Bldg Integrated Leak Rate Test,Quad Cities Nuclear Power Station,Unit 1,891114-15. Next Type a Test Scheduled for Fall 1990
ML20006E1722 February 1990Forwards Listing of Changes,Tests & Experiments Completed During Jan 1990,including Items Completed in 1989. Interlocks Installed on Refuel Bridge Fuel Handling Machine to Prevent Raising Hoist While Hoist Loaded
ML20006C50730 January 1990Identifies Schedular Change for Completion of Corrective Actions Associated W/Human Engineering Deficiencies 159,187 & 489 Re Escutcheon Plates for Control Switches Which Need Replacement.Plates Will Be Replaced During Outages
ML20006C74022 January 1990Advises of Receipt of Accreditation Renewal by INPO in Sept 1989 for Operator Requalification Training Program,Per Generic Ltr 87-07 Requirements & Informs That Programs Developed Using Systematic Approach to Training
ML19354E85916 January 1990Responds to NRC 891128 Ltr Re Violations Noted in Insp Repts 50-254/89-17 & 50-265/89-17.Corrective Actions:Procedure NSWP-E-01, Electrical Cable Installation Insp, Will Be Revised to Enhance Human Factor Aspect
ML19354D81311 January 1990Forwards Corrected App C to Monthly Operating Rept for Dec 1989 for Quad Cities Units 1 & 2
ML20005F6443 January 1990Forwards Listing of Changes,Tests & Experiments Completed During Dec 1989.Summary of Safety Evaluations Being Reported in Compliance w/10CFR50.59 & 10CFR50.71(e) Also EnclFitness for Duty
Fire Barrier
ML20005E16922 December 1989Forwards Rev 22 to Security Plan,Reflecting Administrative Changes in Mgt Structure at Facility.Rev Withheld (Ref 10CFR73.21)
ML20043A57421 December 1989Responds to NRC 891124 Ltr Re Violations Noted in Insp Repts 50-254/89-23 & 50-265/89-23.Corrective Actions:Compressed Gas Cylinder Bottles Secured W/Chain & Fire Marshall Will Increase Tours of Plant Re Transient Combustible MatlFire Barrier
Fire Protection Program
ML20005E12118 December 1989Forwards Final Rept of Fall 1989 IGSCC Insp Plan,Discussing Items Such as Overlay Repair on Weld 02G-S4,mechanical Stress Improvement & Piping Mods
ML19332G3408 December 1989Forwards Response to Generic Ltr 89-21, Implementation Status of USI Requirements. Actions to Resolve USI A-9 Re ATWS Will Be Completed in June 1990 & USI A-42 Re Pipe Cracks in BWRs Will Be Completed in Dec 1990Control of Heavy Loads
ML19332F9091 December 1989Forwards Listing of Changes,Tests & Experiments Completed During Nov 1989Safe Shutdown