Issue date | Title | Topic | |
---|---|---|---|
ML20059G297 | 4 September 1990 | Notifies of Implementation of Procedure on 900831 to Correct wide-range Gas Monitor Display for Noble Gas Spectrum | |
ML20059G499 | 30 August 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jan-Jun 1990 & Rev 0 to APA-ZZ-01003, Odcm | |
ML20059C337 | 23 August 1990 | Advises That Util Plans to Remove Some Thimble Plugging Devices from Plant During Upcoming Refueling Outage.No License Amend Required.Revs to Tech Spec Bases 3/4.2.2 & 3/4.2.3 That Reflect All Removal of Thimble Plugs Encl | |
ML20058N205 | 7 August 1990 | Advises of Implementation of Amend 55,rev to Tech Spec 3/4.7.1.2 Re Auxiliary Feedwater Sys,Effective 900807 | |
ML20081E197 | 27 July 1990 | Forwards Rev 6 to Indexing Instruction T210.0002/Q101, Qualification/Certification Documentation & Rev 6 to T210.002/R353, Required Reading/Personnel Form 2 | |
ML20044B182 | 9 July 1990 | Forwards Westinghouse Revised Proprietary RCS Flow Measurement Uncertainty Calculation Supplementing Setpoint Studies Submitted in Attachment to Util 900412 Ltr.Encl Withheld | |
ML20055E526 | 5 July 1990 | Forwards Revised marked-up Tech Spec Pages for 900306 Application for Amend to License to Place cycle-specific Core Operating Parameters in Core Operating Limits Rept | |
ML20055E786 | 5 July 1990 | Forwards Callaway Plant 1990 Annual Exercise Scenario on 900530 | |
ML20044A660 | 25 June 1990 | Forwards Requested Info Re Seismic Design of safety-related above-ground Vertical Liquid Storage Tanks,Per 900404 Ltr. All Stresses on Tank Roof Angle,Connecting Cylinder to Roof,Remain within Code Allowables Under Postulated Loads | Earthquake |
ML20043H837 | 21 June 1990 | Forwards Response to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issues at Facility | Scram Discharge Volume |
ML20043H272 | 12 June 1990 | Forwards 10CFR50.59 Annual Rept Summaries of Written Safety Evaluations of Changes Approved & Implemented for Plant from 890330 to Present | Safe Shutdown Packing leak |
ML20043E216 | 5 June 1990 | Forwards Endorsements 42-48 for Nelia Policy NF-264 & Endorsements 28-34 for Maelu Policy MF-111 | |
ML20043G933 | 4 June 1990 | Forwards Rev 13 to Operating QA Manual. | |
ML20043D710 | 31 May 1990 | Forwards NPDES Renewal Application Submitted to State of Mo Dept of Natural Resources on 900518 | |
ML20043B584 | 22 May 1990 | Responds to NRC 900423 Ltr Re Violations Noted in Insp Rept 50-483/90-04.Corrective Actions:Security Post Instructions Modified to Require Check of Security Container in QA Area | |
ML20042F283 | 30 April 1990 | Forwards Rev 11 to Inservice Testing Program. | Stroke time Cold shutdown justification |
ML20042F116 | 30 April 1990 | Provides Clarification to SALP 9 Rept 50-483/90-01 for Sept 1988 - Jan 1990.Licensee Voluntarily Retested Few Remaining Const Workers Originally Approved for Unescorted Access Using mini-IPAT | |
ML20042F290 | 27 April 1990 | Forwards Util 900402 Ltr Documenting Agreement Between State of Mo Historic Preservation Officer & Util Re Cultural Resources | |
ML20042D849 | 2 April 1990 | Forwards Listing of Present Level of Nuclear Property Insurance Coverage & Sources of Insurance,Per 10CFR50.54(w) | |
ML20012F160 | 29 March 1990 | Submits Supplemental Info Re Util Response to Station Blackout.Callaway Will Comply W/Numarc Station Blackout Initiative 5A Re Emergency Diesel Generator | |
ML20012D190 | 19 March 1990 | Forwards Rev 15 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20012D744 | 16 March 1990 | Responds to Generic Ltr 89-19 Re Resolution of USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. No Changes or Implementation Schedule Need Be Provided in Response to Generic Ltr 89-19 | |
ML20012C679 | 8 March 1990 | Advises That Installation Date for Regulatory Effectiveness Review Concern 2.6.1 Revised to 900531.Deficiency Will Be Under Continuous Surveillance Until Correction Made | |
ML20012C311 | 6 March 1990 | Forwards Addl Info Re Storage of Enriched Fuel in Spent Fuel Pool Area,Per NRC 900216 Request | |
ML20012B369 | 28 February 1990 | Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums | |
ML20012A414 | 23 February 1990 | Requests NRC Concurrence That Leak Chase Sys Is Integral Part of Containment Boundary & Does Not Need to Be Vented During Containment Integrated Leak Rate Test | |
ML20006E140 | 12 February 1990 | Requests Clarification Re Positive Test Results for Controlled Substances,Specifically How Second Confirmed Positive Test Results Are Handled | Fitness for Duty |
ML20011E794 | 2 February 1990 | Requests Emergency Relief from Tech Spec 3.1.3.1.b Due to Electrical Problem W/Rod Control Sys.Action Required to Prevent Plant Shutdown from 100% Power When Adverse Weather Conditions Exist in Svc Area | |
ML20006D106 | 29 January 1990 | Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Dredge & Visual Shoreline Insps of Missouri River Near Plant Intake Indicated Presence of Small Numbers of Asiatic Clams | Safe Shutdown Ultimate heat sink Coatings Zebra Mussel Biofouling |
ML20006C231 | 24 January 1990 | Forwards Callaway Plant Annual Exercise,891011, Emergency Exercise Scenario for 1989 Exercise | |
ML20006B137 | 19 January 1990 | Forwards ECCS Evaluation Model Revs 10CFR50.46 Annual Rept. Util Will Provide Followup Rept Based on Results of Westinghouse Investigation to Be Completed in Second Quarter 1990 | Fuel cladding |
ML20005E816 | 3 January 1990 | Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design | Anchor Darling |
ML20005E514 | 2 January 1990 | Certifies That fitness-for-duty Program That Meets Requirements of 10CFR26 Will Be Implemented on 900103 | |
ML20005G351 | 28 December 1989 | Forwards Addl Info Supporting NRC Review of Proposed Revs to Tech Spec 3/4.1.3, Movable Control Assemblies. | |
ML20005E522 | 28 December 1989 | Responds to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. | |
ML19353B004 | 4 December 1989 | Forwards Response to NRC 891016 Ltr Re Results of Regulatory Effectiveness Review on 890918-21.Encl Withheld (Ref 10CFR73.21) | |
ML19332F186 | 30 November 1989 | Responds to Generic Ltr 89-15 Re Emergency Response Data Sys.Sys Will Be Implemented by Jul 1991,to Allow Addl Features to Be Developed for Plant Computer Sys & to Be Installed in Conjunction W/New Plant Computer Sys | |
ML19332E988 | 30 November 1989 | Discusses Visual Insp of Hafnium Rod Cluster Control Assemblies During Refuel-2 in Fall 1987.Results Indicate Guide Card Fretting Wear Per NRC Info Notice 87-019.All Hafnium Rods Replaced W/Silver/Indium/Cadnium Assemblies | |
ML19332D444 | 22 November 1989 | Responds to Generic Ltr 89-21,forwarding Table Providing Implementation Status of Each USI at Facility | |
ML19327C074 | 7 November 1989 | Forwards Executed Amend 3 to Indemnity Agreement B-93, Reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements. | |
ML19324C429 | 7 November 1989 | Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Bulletin Provisions as Clarified by Suppl Met & Documentation Associated W/Review Being Maintained at Facility | |
ML19332B612 | 31 October 1989 | Provides Individual Plant Exam Method & Schedule.Completion of Level 1 PRA Scheduled for Jul 1991.Containment Performance Analysis Will Be Completed in Feb 1992.Results Will Be Provided in Sept 1992 | Internal Flooding |
ML20005D618 | 23 October 1989 | Submits Response to Suppl 1 to Generic Ltr 89-07 Re Safeguards Contingency Planning for Surface Vehicle Bombs. Short-term Actions Included to Protect Against Attempted Radiological Sabotage Involving Land Vehicle Bomb | |
ML19325C925 | 4 October 1989 | Submits Corrected Wording to Encl to 890929 Ltr Supporting 10CFR50,App J Exemption to Allow Leak Chase Plugging During Integrated Leak Rate Test | |
ML20248E483 | 29 September 1989 | Forwards Addl Info to Support 10CFR50,App J Exemption to Allow Leaving Leak Chases Plugged During Type a Integrated Leak Rate Test | Exemption Request |
ML20248G087 | 28 September 1989 | Responds to NRC Bulletin 88-011 Re Pressurizer Surge Line Thermal Stratification.Action Items 1.a & B Completed & 1.d Actions Re Stress & Fatigue Ongoing Through Westinghouse Owners Group | |
ML20248C195 | 21 September 1989 | Forwards Summary of Refueling Water Storage Tank Seismic Design Analysis Which Includes Effects of Tank Wall Flexibility.Issue Not Applicable to Condensate Storage Tank at Facility | Hydrostatic Earthquake |
ML20246J701 | 30 August 1989 | Forwards Semiannual Radioactive Effluent Release Rept for First Half 1989.W/o Encl | Offsite Dose Calculation Manual |
ML20246K945 | 29 August 1989 | Forwards Relief Request 0 to Plant Inservice Insp Program Plan,Per Observations During Refuel III | |
ML20246E052 | 18 August 1989 | Forwards Info on Operator Licensing Exam Schedule,Per Generic Ltr 89-12 |