Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20059G2974 September 1990Notifies of Implementation of Procedure on 900831 to Correct wide-range Gas Monitor Display for Noble Gas Spectrum
ML20059G49930 August 1990Forwards Semiannual Radioactive Effluent Release Rept for Jan-Jun 1990 & Rev 0 to APA-ZZ-01003, Odcm
ML20059C33723 August 1990Advises That Util Plans to Remove Some Thimble Plugging Devices from Plant During Upcoming Refueling Outage.No License Amend Required.Revs to Tech Spec Bases 3/4.2.2 & 3/4.2.3 That Reflect All Removal of Thimble Plugs Encl
ML20058N2057 August 1990Advises of Implementation of Amend 55,rev to Tech Spec 3/4.7.1.2 Re Auxiliary Feedwater Sys,Effective 900807
ML20081E19727 July 1990Forwards Rev 6 to Indexing Instruction T210.0002/Q101, Qualification/Certification Documentation & Rev 6 to T210.002/R353, Required Reading/Personnel Form 2
ML20044B1829 July 1990Forwards Westinghouse Revised Proprietary RCS Flow Measurement Uncertainty Calculation Supplementing Setpoint Studies Submitted in Attachment to Util 900412 Ltr.Encl Withheld
ML20055E5265 July 1990Forwards Revised marked-up Tech Spec Pages for 900306 Application for Amend to License to Place cycle-specific Core Operating Parameters in Core Operating Limits Rept
ML20055E7865 July 1990Forwards Callaway Plant 1990 Annual Exercise Scenario on 900530
ML20044A66025 June 1990Forwards Requested Info Re Seismic Design of safety-related above-ground Vertical Liquid Storage Tanks,Per 900404 Ltr. All Stresses on Tank Roof Angle,Connecting Cylinder to Roof,Remain within Code Allowables Under Postulated LoadsEarthquake
ML20043H83721 June 1990Forwards Response to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issues at FacilityScram Discharge Volume
ML20043H27212 June 1990Forwards 10CFR50.59 Annual Rept Summaries of Written Safety Evaluations of Changes Approved & Implemented for Plant from 890330 to PresentSafe Shutdown
Packing leak
ML20043E2165 June 1990Forwards Endorsements 42-48 for Nelia Policy NF-264 & Endorsements 28-34 for Maelu Policy MF-111
ML20043G9334 June 1990Forwards Rev 13 to Operating QA Manual.
ML20043D71031 May 1990Forwards NPDES Renewal Application Submitted to State of Mo Dept of Natural Resources on 900518
ML20043B58422 May 1990Responds to NRC 900423 Ltr Re Violations Noted in Insp Rept 50-483/90-04.Corrective Actions:Security Post Instructions Modified to Require Check of Security Container in QA Area
ML20042F28330 April 1990Forwards Rev 11 to Inservice Testing Program.Stroke time
Cold shutdown justification
ML20042F11630 April 1990Provides Clarification to SALP 9 Rept 50-483/90-01 for Sept 1988 - Jan 1990.Licensee Voluntarily Retested Few Remaining Const Workers Originally Approved for Unescorted Access Using mini-IPAT
ML20042F29027 April 1990Forwards Util 900402 Ltr Documenting Agreement Between State of Mo Historic Preservation Officer & Util Re Cultural Resources
ML20042D8492 April 1990Forwards Listing of Present Level of Nuclear Property Insurance Coverage & Sources of Insurance,Per 10CFR50.54(w)
ML20012F16029 March 1990Submits Supplemental Info Re Util Response to Station Blackout.Callaway Will Comply W/Numarc Station Blackout Initiative 5A Re Emergency Diesel Generator
ML20012D19019 March 1990Forwards Rev 15 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20012D74416 March 1990Responds to Generic Ltr 89-19 Re Resolution of USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. No Changes or Implementation Schedule Need Be Provided in Response to Generic Ltr 89-19
ML20012C6798 March 1990Advises That Installation Date for Regulatory Effectiveness Review Concern 2.6.1 Revised to 900531.Deficiency Will Be Under Continuous Surveillance Until Correction Made
ML20012C3116 March 1990Forwards Addl Info Re Storage of Enriched Fuel in Spent Fuel Pool Area,Per NRC 900216 Request
ML20012B36928 February 1990Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums
ML20012A41423 February 1990Requests NRC Concurrence That Leak Chase Sys Is Integral Part of Containment Boundary & Does Not Need to Be Vented During Containment Integrated Leak Rate Test
ML20006E14012 February 1990Requests Clarification Re Positive Test Results for Controlled Substances,Specifically How Second Confirmed Positive Test Results Are HandledFitness for Duty
ML20011E7942 February 1990Requests Emergency Relief from Tech Spec 3.1.3.1.b Due to Electrical Problem W/Rod Control Sys.Action Required to Prevent Plant Shutdown from 100% Power When Adverse Weather Conditions Exist in Svc Area
ML20006D10629 January 1990Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Dredge & Visual Shoreline Insps of Missouri River Near Plant Intake Indicated Presence of Small Numbers of Asiatic ClamsSafe Shutdown
Ultimate heat sink
Coatings
Zebra Mussel
Biofouling
ML20006C23124 January 1990Forwards Callaway Plant Annual Exercise,891011, Emergency Exercise Scenario for 1989 Exercise
ML20006B13719 January 1990Forwards ECCS Evaluation Model Revs 10CFR50.46 Annual Rept. Util Will Provide Followup Rept Based on Results of Westinghouse Investigation to Be Completed in Second Quarter 1990Fuel cladding
ML20005E8163 January 1990Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar DesignAnchor Darling
ML20005E5142 January 1990Certifies That fitness-for-duty Program That Meets Requirements of 10CFR26 Will Be Implemented on 900103
ML20005G35128 December 1989Forwards Addl Info Supporting NRC Review of Proposed Revs to Tech Spec 3/4.1.3, Movable Control Assemblies.
ML20005E52228 December 1989Responds to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance.
ML19353B0044 December 1989Forwards Response to NRC 891016 Ltr Re Results of Regulatory Effectiveness Review on 890918-21.Encl Withheld (Ref 10CFR73.21)
ML19332F18630 November 1989Responds to Generic Ltr 89-15 Re Emergency Response Data Sys.Sys Will Be Implemented by Jul 1991,to Allow Addl Features to Be Developed for Plant Computer Sys & to Be Installed in Conjunction W/New Plant Computer Sys
ML19332E98830 November 1989Discusses Visual Insp of Hafnium Rod Cluster Control Assemblies During Refuel-2 in Fall 1987.Results Indicate Guide Card Fretting Wear Per NRC Info Notice 87-019.All Hafnium Rods Replaced W/Silver/Indium/Cadnium Assemblies
ML19332D44422 November 1989Responds to Generic Ltr 89-21,forwarding Table Providing Implementation Status of Each USI at Facility
ML19327C0747 November 1989Forwards Executed Amend 3 to Indemnity Agreement B-93, Reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements.
ML19324C4297 November 1989Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Bulletin Provisions as Clarified by Suppl Met & Documentation Associated W/Review Being Maintained at Facility
ML19332B61231 October 1989Provides Individual Plant Exam Method & Schedule.Completion of Level 1 PRA Scheduled for Jul 1991.Containment Performance Analysis Will Be Completed in Feb 1992.Results Will Be Provided in Sept 1992Internal Flooding
ML20005D61823 October 1989Submits Response to Suppl 1 to Generic Ltr 89-07 Re Safeguards Contingency Planning for Surface Vehicle Bombs. Short-term Actions Included to Protect Against Attempted Radiological Sabotage Involving Land Vehicle Bomb
ML19325C9254 October 1989Submits Corrected Wording to Encl to 890929 Ltr Supporting 10CFR50,App J Exemption to Allow Leak Chase Plugging During Integrated Leak Rate Test
ML20248E48329 September 1989Forwards Addl Info to Support 10CFR50,App J Exemption to Allow Leaving Leak Chases Plugged During Type a Integrated Leak Rate TestExemption Request
ML20248G08728 September 1989Responds to NRC Bulletin 88-011 Re Pressurizer Surge Line Thermal Stratification.Action Items 1.a & B Completed & 1.d Actions Re Stress & Fatigue Ongoing Through Westinghouse Owners Group
ML20248C19521 September 1989Forwards Summary of Refueling Water Storage Tank Seismic Design Analysis Which Includes Effects of Tank Wall Flexibility.Issue Not Applicable to Condensate Storage Tank at FacilityHydrostatic
Earthquake
ML20246J70130 August 1989Forwards Semiannual Radioactive Effluent Release Rept for First Half 1989.W/o EnclOffsite Dose Calculation Manual
ML20246K94529 August 1989Forwards Relief Request 0 to Plant Inservice Insp Program Plan,Per Observations During Refuel III
ML20246E05218 August 1989Forwards Info on Operator Licensing Exam Schedule,Per Generic Ltr 89-12