2CAN099009, Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 90092521 September 1990Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 900925
0CAN099002, Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP14 September 1990Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP
0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-0714 September 1990Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07
2CAN099004, Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis7 September 1990Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & AnalysisAnticipated operational occurrence
0CAN099001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised7 September 1990Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised
1CAN099003, Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 19916 September 1990Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 1991
0CAN089009, Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg31 August 1990Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg
0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual30 August 1990Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual
0CAN089008, Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)29 August 1990Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)Fitness for Duty
0CAN089005, Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 90100127 August 1990Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 901001
1CAN089011, Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers16 August 1990Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat CoolersStroke time
Power Operated Valves
2CAN089009, Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 90103113 August 1990Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 901031
0CAN089002, Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 18 August 1990Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 1
05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria2 August 1990Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria
2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info2 August 1990Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info
ML20081E08931 July 1990Advises That Since Guidance Contained in Reg Guide 1.97 Not Addressed in Submittals Re Generic Ltr 82-33,further Clarification of Position Re Compliance W/Generic Ltr Appropriate,Per .Ltr Will Be Submitted by 901215
0CAN079014, Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 90093031 July 1990Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930
0CAN079024, Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures31 July 1990Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures
0CAN079020, Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)31 July 1990Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)
0CAN079018, Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)24 July 1990Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)
0CAN079021, Forwards Rev 12 to QA Manual Operations23 July 1990Forwards Rev 12 to QA Manual Operations
0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl23 July 1990Forwards Rev 12 to QA Manual Operations.W/O Encl
0CAN079011, Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 90021620 July 1990Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 900216
2CAN079008, Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps17 July 1990Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet GapsFuel cladding
0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance17 July 1990Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance
2CAN079001, Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip5 July 1990Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip
ML20043H51619 June 1990Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605
ML20043H31218 June 1990Forwards Responses to Remaining NRC Questions Re Seismically Qualified,Partially Protected,Condensate Storage Tank (Qcst).Analyses in Calculations Demonstrate That Qcst Tank Foundation & Drilled Piers Adequate W/O ModDesign basis earthquake
ML20043F33215 June 1990Submits Addl Info on Tech Spec Change Request for Seismic Instrumentation,Per 890809 Request.Licensee Concurs W/Nrc Recommendation Re Editorial Change
ML20043G06613 June 1990Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control PanelsPost Accident Monitoring
ML20043H34711 June 1990Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20043G38011 June 1990Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day
ML20043F5128 June 1990Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606
ML20043F4347 June 1990Informs of Receipt of Necessary Approvals to Transfer Operating Responsibilities of Plant to Entergy Operations, Per Amends 128 & 102 to Licenses DPR-51 & NPF-6, Respectively.Extension of Amend Request Unnecessary
ML20043E6567 June 1990Requests That Listed Distribution Be Made on All Future NRC Correspondence.Correspondence to Ns Carns Should Be Addressed to Russellville
ML20043E4995 June 1990Provides Supplemental Response to Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02.Corrective Actions:Listed Program Enhancements Being Implemented to LER Process to Provide Timely Determinations of Condition Rept
ML20043E3854 June 1990Concurs w/900516 Ltr Re Implementation of SPDS Complete for Both Units & Requirements of NUREG-0737,Suppl 1 Met
ML20043E3774 June 1990Forwards Response to Concerns Re Control Room Habitability Survey.Addl Mods Identified Will Enhance Overall Reliability of Control Room Sys & Changes Designed to Increase Performance,Effectiveness & Response of Habitability Sys
ML20043C08225 May 1990Withdraws 900410 Request to Amend Tech Spec Table 3.3-1 Re Applicable Operational Modes for Certain Reactor Protective Instrumentation Operability Requirements
ML20043B65322 May 1990Forwards Rev to Industrial Security Plan to Eliminate Need to Protect Certain Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21)
ML20043B70921 May 1990Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R
ML20043A54416 May 1990Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project
ML20043A59915 May 1990Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1
ML20042H0559 May 1990Forwards Civil Penalty in Amount of $50,000 for Violations Noted in Insp Repts 50-313/86-23 & 50-368/86-24 Re Environ Qualification of Electrical Equipment Important to Safety. Comprehensive Corrective Actions Undertaken
ML20043B0849 May 1990Corrects 900309 Ltr Re Completion of Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Design Change Package Addressing Perimeter & Interior Lighting Scheduled to Be Onsite Late Summer 1991
ML20043A8367 May 1990Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance RequirementsMissed surveillance
ML20042F4374 May 1990Requests 90-day Extension to Provide Addl Time for Reviews of Amends 128 & 102 to Licenses DPR-51 & NPF-6,respectively, Re Ownership Transfer
ML20042G4774 May 1990Forwards Summary of Util Exercise Critique Board Evaluation of Radiological Emergency Preparedness Exercise REX-90,per Insp Repts 50-313/90-08 & 50-368/90-08
ML20042F3353 May 1990Forwards Nonproprietary Suppl 1 to CEN-386-NP & Proprietary Suppl 1 to CEN-386-P, Responses to Questions on C-E Rept CEN-386-P, 'Verification of Acceptability of 1-Pin Burnup Limit....' Proprietary Rept Withheld (Ref 10CFR2.790)
ML20042F27030 April 1990Provides Exam Schedules for Reactor Coolant Pumps a & B in Revised Inservice Insp Program Plan.Insps Scheduled for Refueling Outages 1R10 & 1R12 for Pump a Exams & Refueling Outages 1R10,1R12 & 1R14 for Pump B Exams