 Issue dateTitleTopic
ML23290A14717 October 2023NEI 99-02 Rev 8 Draft 9 29 2023 Redline VersionSafe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
High Radiation Area
Half scram
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Locked High Radiation Area
Residual transfer
Significance Determination Process
Operability Determination
Frazil ice
Nonconservative Technical Specifications
Exemption Request
Fuel cladding
Through-Wall Leakage
Scaffolding
Grace period
Power change
Downpower
Unidentified leakage
Integrated Public Alert and Warning System
Siren
ML23290A12517 October 2023NEI - NEI 99-02, Rev. 8, Draft Regulatory Assessment Performance Indicator GuidelineSafe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
High Radiation Area
Half scram
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Locked High Radiation Area
Significance Determination Process
Operability Determination
Frazil ice
Nonconservative Technical Specifications
Fuel cladding
Through-Wall Leakage
Scaffolding
Grace period
Power change
Downpower
Unidentified leakage
Integrated Public Alert and Warning System
Siren
ML23157A1066 June 2023NEI 19-01, Rev 1, Safety and Economic Benefits of Accident Tolerant FuelUltimate heat sink
Probabilistic Risk Assessment
Coatings
Cyber Security
FLEX
Significance Determination Process
Fuel cladding
Fire Watch
Power change
ML23110A67618 April 202304-18-23_NRC_NEI 23-03 Review + EndorseSafe Shutdown
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Aging Management
Exemption Request
Pandemic
Fuel cladding
ML23083B46224 March 2023Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07Safe Shutdown
High winds
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Fatality
Power Uprate
Overspeed trip
ML23138A16624 March 2023Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07Safe Shutdown
High winds
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Fatality
Power Uprate
Overspeed trip
ML23125A3201 March 2023Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 Revision a 5-4-23 Tirice Response to NRC CommentsSafe Shutdown
High winds
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Power change
Downpower
Fatality
Power Uprate
Overspeed trip
ML22298A22825 October 2022NEI 15-09, Rev. 1, Cybersecurity Event NotificationsSafe Shutdown
Time of Discovery
High Radiation Area
Cyber Security
ML22195A16931 July 2022NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 - Change SummaryHigh winds
Internal Flooding
Earthquake
ML22195A16814 July 2022NEI, Marked-Up to Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Process Control Program
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
Unidentified leakage
ML22195A16714 July 2022NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
ML22048A58116 February 2022NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage OperationsHigh winds
Tornado Missile
Very Low Safety Significance Issue Resolution
ML21343A28231 December 2021Redline/Strikeout Version of NEI 21-07 Rev 0-B, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using the NEI 18-04 MethodologyHigh winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21343A2928 December 2021NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 MethodologyHigh winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21337A3803 December 2021NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1Commercial Grade Dedication
Cyber Security
ML21305A00130 November 2021NEI 17-06 Rev 0 Draft B, Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications (Staff Comments IncorporatedCommercial Grade Dedication
Cyber Security
ML21342A16829 October 2021Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021Safe Shutdown
Met Tower
Cyber Security
Fire Protection Program
ML21342A20329 October 2021Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021Cyber Security
Scaffolding
ML21274A0311 October 2021NRC Draft Detailed Comments Related to NEI 21-07, Revision 0, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using the NEI 18-04 MethodologySafe Shutdown
High winds
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21278A47230 September 2021NEI 20-07, Rev. Draft, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C SystemsSafe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
ML21257A23519 August 2021Rulemaking: Proposed Rule: Advanced Reactor Physical Security, Email Exchange Between Nrc and NEI Draft Pages from NEI-20-05 Rev. E
ML21250A3782 August 2021NEI 21-07, Revision 0, Technology Inclusive Guidance for Non-Light Water Reactors SAR Content for Applicants Using the NEI 18-04 MethodologyHigh winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21130A59731 May 2021NEI 20-07, Guidance for Addressing Software Common Cause Failure in High Safety-Significant Safety Related Digital I&C Systems - Draft CAnticipated operational occurrence
Commercial Grade Dedication
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
ML21130A59631 May 2021NEI, Guidance for Addressing Software Common Cause Failure in High Safety-Significant Safety Related Digital I&C Systems - Draft CAnticipated operational occurrence
Commercial Grade Dedication
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
ML21125A2845 May 2021Transmittal of NEI 20-09: Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-Light Water Reactor StandardSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
ML21110A06620 April 2021Nei'S Comparison Table Between NEI 20-07 Sdos and NRC RGs and Endorsed IEEE Stds R2
ML21085A55525 March 2021NEI 20-09 -Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-LWR PRA Standard, March 2021Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML21049A0572 March 2021Rulemaking: Proposed Rule: NRC Markup of NEI-20-05 Draft B Comments on Methodological Approach and Considerations for a Technical Analysis to Demonstrate Compliance with the Performance Criteria of 10 CFR 73.55(a)(7)Probabilistic Risk Assessment
ML20339A48523 November 2020NEI 20-09 - NRC Comments Resolved November 2020Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20322A33917 November 2020NEI ROP White Paper Modification of the Description of Unplanned Scrams with Complications for Nov 18 2020 ROP Public MeetingFuel cladding
ML20245E56131 August 2020Guidance for Addressing Software Common Cause Failure in High Safety-Significant Safety Related Digital I&C SystemsSafe Shutdown
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
ML20245E14731 August 2020Attachment 1 - NEI Guidelines for the Implementation of the Risk-Informed Process for Evaluations Integrated Decision-Making PanelFLEX
Exemption Request
Low Safety Significance Issue Resolution
ML21050A09031 August 2020Staff Detailed Comments - NEI 20_07 Draft Revision B -February 2021Safe Shutdown
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
ML20302A11524 August 2020NEI 20-09 - Nlwr PRA Peer Review Rev1 August 2020Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20211L71424 July 2020Industry Position Regarding Safety Margin: Dispositioning Degraded or Failed Management Measures Above and Beyond Regulatory Requirements, and Meeting Performance Criteria; Follow Up to May 6, 2020 Letter on Smarter Program Inspection PriorBackfit
ML20155K6851 June 2020Availability of NEI 20-09, Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-LWR Standard, for NRC Review and EndorsementSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20154K5661 June 2020Availability of NEI 20-09, Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-LWR Standard, for NRC Review and EndorsementSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20129J85931 May 2020NEI 96-07, Appendix D Revision 1, Draft M, May 2020Safe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20129J85830 May 2020NEI 96-07, Appendix D, Revision 1, Draft M, May 2020 with Redline StrikeSafe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20139A19014 May 202005-14-20 Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with Safety-Related and Important-to-Safety FunctionsSafe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Cyber Security
Fire Protection Program
ML20135H16813 May 2020Request for NRC Endorsement of NEI 96-07, Appendix D, Rev 1Safe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20134J03313 May 2020Submittal of Response to Request for Additional Information (RAI) for NEI 14-05A, Revision 1, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test ServicesNon-Destructive Examination
Commercial Grade Dedication
Nondestructive Examination
Condition Adverse to Quality
ML20126G37430 April 2020NEI 96-07, Appendix D, Revision 1, Draft F, April 2020 with Redline StrikeSafe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20126G37530 April 2020NEI 96-07, Appendix D, Revision 1, Draft F, April 2020Safe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20115E41324 April 2020Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated April 2020Probabilistic Risk Assessment
Cyber Security
Power change
ML20114E19522 April 2020NEI 96-07 Appendix D Revision 1, Draft B, April 2020 with Red-line StrikeSafe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20107D89413 April 2020Email from D. Young Draft B of NEI 20-05, Methodological Approach and Considerations for a Security Assessment to Demonstrate Compliance with the Performance Criteria of 10 CFR 73.55(TBD)Probabilistic Risk Assessment
ML20104A30710 April 2020Draft NEI 20-05, Methodological Approach and Considerations for a Security Assessment to Demonstrate Compliance with the Performance Criteria of 10 CFR 73.55(TBD)Probabilistic Risk Assessment
ML20092J9201 April 2020NEI 96-07 Appendix D Rev 1 February 2020Safe Shutdown
Anticipated operational occurrence
Incorporated by reference
ML20092J9161 April 2020NEI 96-07 Appendix D Rev 1 February 2020_Red LineSafe Shutdown
Anticipated operational occurrence
Incorporated by reference