 TitleIOW
TSTF-448Control Room Habitability1501109
TSTF-449Steam Generator Tube Integrity92644
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B80406
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions70488
TSTF-359Increase Flexibility in Mode Restraints40230
TSTF-358Missed Surveillance Requirements39210
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers37110
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation36290
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection3693
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors36310
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr3182
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A27140
TSTF-258Changes to Section 5.0, Administrative Controls24320
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR2473
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report23470
TSTF-545TS Inservice Testing (IST) Program Removal22130
TSTF-360DC Electrical Rewrite19156
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2618201
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1890
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less18100
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO17103
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec15131
TSTF-312Administratively Control Containment Penetrations1491
TSTF-418RPS and ESFAS Test Times and Completion Times - WCAP-143331470
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1471
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control13152
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action13170
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1380
TSTF-283Modify Section 3.8 Mode Restriction Notes1252
TSTF-529Clarify Use and Application Rules1220
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil1252
TSTF-491Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications1170
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B11234
TSTF-411Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P1160
TSTF-421Revision to RCP Flywheel Inspection Program - WCAP-1566611100
TSTF-339Relocate TS Parameters to Colr1152
TSTF-287Ventilation System Envelope Allowed Outage Time1051
TSTF-485Correct Example 1.4-1940
TSTF-343Containment Structural Integrity942
TSTF-163Minimum Vs. Steady State Voltage and Frequency910
TSTF-340Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable800
TSTF-412Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable831
TSTF-330Allowed Outage Time - Ultimate Heat Sink820
TSTF-284Add Met Vs. Perform to Specification 1.4, Frequency811
TSTF-286Define Operations Involving Positive Reactivity Additions7102
TSTF-547Clarification of Rod Position Requirements710
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves610
TSTF-432Change in Technical Specifications End States - WCAP-16294630
TSTF-500DC Electrical Rewrite - Update to TSTF-360653
TSTF-276Revise DG Full Load Rejection Test620