Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-448Control Room Habitability107464
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B102347
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions61266
TSTF-449Steam Generator Tube Integrity61281
TSTF-051Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations46172
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection3763
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation35160
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B34354
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers2980
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors28240
TSTF-359Increase Flexibility in Mode Restraints27140
TSTF-545TS Inservice Testing (IST) Program Removal25100
TSTF-529, Clarify Use and Application RulesClarify Use and Application Rules2310
TSTF-358Missed Surveillance Requirements22110
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec2191
TSTF-360DC Electrical Rewrite2087
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO19122
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control1892
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR1821
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A1890
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1760
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2616120
TSTF-577Performance Based Frequencies for Steam Generator Tube Inspections1670
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1620
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1681
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report14350
TSTF-563Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program1460
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1370
TSTF-312Administratively Control Containment Penetrations1371
TSTF-418RPS and ESFAS Test Times and Completion Times - WCAP-143331360
TSTF-567Add Containment Sump TS to Address GSI-191 Issues1232
TSTF-547Clarification of Rod Position Requirements1210
TSTF-500DC Electrical Rewrite - Update to TSTF-3601143
TSTF-421Revision to RCP Flywheel Inspection Program - WCAP-156661160
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less1160
TSTF-491Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications1040
TSTF-258Changes to Section 5.0, Administrative Controls10140
TSTF-283Modify Section 3.8 Mode Restriction Notes1041
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil1031
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action950
TSTF-339Relocate TS Parameters to Colr981
TSTF-411Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P940
TSTF-287Ventilation System Envelope Allowed Outage Time931
TSTF-412Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable901
TSTF-554Revise Reactor Coolant Leakage Requirements820
TSTF-569Revise Response Time Testing Definition730
TSTF-485Correct Example 1.4-1720
TSTF-340Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable700
TSTF-163Minimum Vs. Steady State Voltage and Frequency710
TSTF-286Define Operations Involving Positive Reactivity Additions731