Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B52213
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation29230
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2891
TSTF-545TS Inservice Testing (IST) Program Removal1880
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1590
TSTF-449Steam Generator Tube Integrity1451
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR1220
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1130
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1140
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A850
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less840
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec750
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO660
TSTF-360DC Electrical Rewrite522
TSTF-432Change in Technical Specifications End States - WCAP-16294520
TSTF-340Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable500
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers530
TSTF-283Modify Section 3.8 Mode Restriction Notes440
TSTF-284Add Met Vs. Perform to Specification 1.4, Frequency420
TSTF-418RPS and ESFAS Test Times and Completion Times - WCAP-14333430
TSTF-529Clarify Use and Application Rules440
TSTF-500DC Electrical Rewrite - Update to TSTF-360422
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil400
TSTF-339Relocate TS Parameters to Colr310
TSTF-343Containment Structural Integrity320
TSTF-273SFDP Clarifications300
TSTF-411Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P320
TSTF-276Revise DG Full Load Rejection Test310
TSTF-285Charging Pump Swap Ltop Allowance301
TSTF-412Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable300
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves300
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B2170
TSTF-330Allowed Outage Time - Ultimate Heat Sink200
TSTF-438Clarify Exception Notes to Be Consistent with the Requirement Being Excepted200
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors230
TSTF-315Reduce Plant Trips Due to Spurious Signals to the Nis During Physics Testing210
TSTF-142Increase the Completion Time When the Core Reactivity Balance is Not within Limit210
TSTF-299Administrative Controls Program 5.5.2.B Test Interval and Exception210
TSTF-348Cancellation of NRC Environmental Monitoring Program with States200
TSTF-258Changes to Section 5.0, Administrative Controls200
TSTF-308Determination of Cumulative and Projected Dose Contributions in Recp210
TSTF-352Provide Consistent Completion Time to Reach Mode 4200
TSTF-248Revise Shutdown Margin Definition for Stuck Rod Exception101
TSTF-322Secondary Containment and Shield Building Boundary Integrity SRS110
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr110
TSTF-266Eliminate the Remote Shutdown System Table of Instrumentation and Controls100
TSTF-349Add Note to LCO 3.9.5 Allowing Shutdown Cooling Loops Removal from Operation120
TSTF-234110
TSTF-272Refueling Boron Concentration Clarification112
TSTF-361Allow Standby Sdc/Rhr/Dhr LOOP to Inoperable to Support Testing100