Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-448Control Room Habitability56102
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B52213
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions31204
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation29230
TSTF-545TS Inservice Testing (IST) Program Removal1880
TSTF-535Revise Shutdown Margin Definition to Address Advanced Fuel Designs1730
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1590
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR1220
TSTF-495Bases Change to Address GE Part 21 SC05-031200
TSTF-514Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation1110
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1130
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control9102
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A850
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less840
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO660
TSTF-52Implement 10 CFR 50, Appendix J, Option B610
TSTF-484Use of TS 3.10.1 for SCRAM Time Testing Activities610
TSTF-423Technical Specifications End States, NEDC-32988-A660
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers530
TSTF-360DC Electrical Rewrite522
TSTF-400Clarify SR on Bypass of DG Automatic Trips410
TSTF-283Modify Section 3.8 Mode Restriction Notes440
TSTF-500DC Electrical Rewrite - Update to TSTF-360422
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil400
TSTF-306Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration410
TSTF-529Clarify Use and Application Rules440
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves300
TSTF-276Revise DG Full Load Rejection Test310
TSTF-273SFDP Clarifications300
TSTF-542Reactor Pressure Vessel Water Inventory Control3110
TSTF-343Containment Structural Integrity320
TSTF-359Increase Flexibility in Mode Restraints310
TSTF-477Add Action for Two Inoperable Control Room AC Subsystems310
TSTF-2643.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS200
TSTF-299Administrative Controls Program 5.5.2.B Test Interval and Exception210
TSTF-438Clarify Exception Notes to Be Consistent with the Requirement Being Excepted200
TSTF-358Missed Surveillance Requirements200
TSTF-330Allowed Outage Time - Ultimate Heat Sink200
TSTF-258Changes to Section 5.0, Administrative Controls200
TSTF-308Determination of Cumulative and Projected Dose Contributions in Recp210
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B2170
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors230
TSTF-222Control Rod SCRAM Time Testing220
TSTF-348Cancellation of NRC Environmental Monitoring Program with States200
TSTF-464Clarify the Control Rod Block Instrumentation Required Action100
TSTF-334Relaxed Surveillance Frequency for Excess Flow Check Valve Testing100
TSTF-485Correct Example 1.4-1120
TSTF-322Secondary Containment and Shield Building Boundary Integrity SRS110
TSTF-323EFCV Completion Time to 72 Hours100
TSTF-533Remove Colr and PTLR Revision and Date Relocation Provisions Added by TSTF-363, -408, and -419100