Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217L883 | 21 October 1999 | Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 | Incorporated by reference |
ML20217G204 | 13 October 1999 | Safety Evaluation Supporting Amend 179 to License DPR-28 | Time of Discovery Missed surveillance |
BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With | |
ML20212C255 | 17 September 1999 | Safety Evaluation Supporting Amend 175 to License DPR-28 | Shutdown Margin |
BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Vermont Yankee.With | |
BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 | 19 August 1999 | Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 | |
BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with | 31 July 1999 | Monthly Operating Rept for July 1999 for Vermont Yankee. with | |
ML20209J008 | 14 July 1999 | Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting | |
BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With | |
ML20196G507 | 23 June 1999 | Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading | Grab sample Offsite Dose Calculation Manual |
BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With | |
BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Vynp.With | |
ML20206E874 | 29 April 1999 | SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application | Safe Shutdown Earthquake Flow Induced Vibration |
ML20206D930 | 27 April 1999 | 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) | Post Accident Monitoring Fuel cladding |
ML20205S421 | 16 April 1999 | Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion | |
ML20205K758 | 7 April 1999 | Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV | Incorporated by reference |
BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With | |
ML20205F663 | 4 March 1999 | Jet Pump Riser Weld Leakage Evaluation | |
BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With | |
ML20205P824 | 28 February 1999 | Rev 2 to Vermont Yankee Cycle 20 Colr | |
ML20203H988 | 18 February 1999 | SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl | Incorporated by reference |
ML20203A695 | 4 February 1999 | Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) | |
ML20199K715 | 21 January 1999 | Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification | |
ML20199K699 | 20 January 1999 | Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable | |
ML20199L595 | 14 January 1999 | Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) | Incorporated by reference |
BVY-99-071, Corp 1998 Annual Rept. with | 31 December 1998 | Corp 1998 Annual Rept. with | |
BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station | |
ML20198H548 | 23 December 1998 | Rev 2 to Vermont Operational QA Manual,Voqam | |
ML20196H864 | 1 December 1998 | Cycle 19 Operating Rept | Safe Shutdown Tornado Missile Hydrostatic Temporary Modification Abnormal operational transient Scram Discharge Volume Battery sizing Earthquake Fire Watch |
BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With | |
ML20195C416 | 9 November 1998 | SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds | Internal Flooding Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld |
BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With | |
ML20155B647 | 26 October 1998 | Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage | Safe Shutdown Earthquake Flow Induced Vibration |
ML20154N089 | 16 October 1998 | Rev 1 to Vermont Operational QA Program Manual (Voqam) | Nondestructive Examination Condition Adverse to Quality Liquid penetrant Fire Protection Program |
ML20154B695 | 1 October 1998 | SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station | Power-Operated Valves Backfit |
BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With | |
ML20239A136 | 2 September 1998 | SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program | Safe Shutdown Fire Barrier Fire Protection Program |
BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With | |
ML20151U036 | 28 August 1998 | Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project | Safe Shutdown Time to boil Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Power Uprate |
ML20237E922 | 20 August 1998 | Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 | |
BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station | 31 July 1998 | Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station | |
ML20205F649 | 31 July 1998 | Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee | Safe Shutdown Operating Basis Earthquake Earthquake Flow Induced Vibration |
ML20236G001 | 30 June 1998 | Individual Plant Exam External Events | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Squib Tornado-Generated Missile Tornado Generated Missile Large early release frequency Earthquake Fire Watch |
BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station | 30 June 1998 | Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station | |
ML20248C508 | 31 May 1998 | Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 | Shutdown Margin Anticipated operational occurrence Abnormal operational transient |
ML20248C495 | 31 May 1998 | Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr | |
BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station | 31 May 1998 | Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station | |
ML20247J834 | 31 May 1998 | Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 | Safe Shutdown Ultimate heat sink |
ML20247G400 | 12 May 1998 | Interview Rept of Ej Massey | |
ML20247E635 | 30 April 1998 | Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee | Safe Shutdown Earthquake Operating Basis Earthquake Flow Induced Vibration |