Issue date | Title | Topic | |
---|---|---|---|
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML18152B353 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr | Reserve Station Service Transformer |
ML18152B665 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr | Temporary Modification |
ML18152B442 | 27 August 1999 | LER 99-006-00:on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With 990827 Ltr | Safe Shutdown Fire Barrier Fire Watch |
ML18152B441 | 27 August 1999 | LER 99-005-00:on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed | |
ML18151A398 | 13 August 1999 | SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage. | Hydrostatic |
ML18152B377 | 13 August 1999 | LER 99-004-00:on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms | |
ML18152B379 | 31 July 1999 | Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr | Temporary Modification Biofouling |
ML18152B391 | 30 June 1999 | Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr | |
ML18152B434 | 31 May 1999 | Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr | Temporary Modification Biofouling |
ML20195E240 | 31 May 1999 | Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag | |
ML18152B418 | 18 May 1999 | LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr | Time of Discovery |
ML18152B416 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr | Temporary Modification |
ML18152B411 | 28 April 1999 | LER 99-003-00:on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With 990428 Ltr | Safe Shutdown Fire Protection Program Fire Watch Hourly Fire Watch |
ML18152B651 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 | |
ML18153A274 | 29 March 1999 | LER 99-002-00:on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212 | Fire Barrier Fire Protection Program Fire Watch |
ML18153A268 | 19 March 1999 | LER 98-013-01:on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr | Shutdown Margin |
ML18152B733 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr | Temporary Modification |
ML18152B542 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr | |
ML18151A303 | 29 January 1999 | ISI Summary Rept for 1998 Refueling Outage,Including Form NIS-1, Owners Rept for ISIs & Form NIS-2, Owners Rept for Repairs & Replacements. | |
ML18152B726 | 21 January 1999 | LER 99-001-00:on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable | Missed surveillance |
ML18152B601 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr | Temporary Modification Turbine Missile Biofouling |
ML18152B578 | 16 December 1998 | LER 98-014-00:on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition | Shutdown Margin |
ML18152B581 | 16 December 1998 | LER 98-013-00:on 981122,turbine/reactor Trip on High SG Level Occurred.Caused by Instrument Failure.Control Room Operators Placed Unit in Safe,Shutdown Condition | Shutdown Margin |
ML18152B712 | 4 December 1998 | LER 98-S01-00:on 981105,noted Failure to Deactivate Station Access Badge.Caused by Human Error.Licensee Will Now Deactivate Station Badges Before Clearance Is Revoked & Process for Badge Deactivations Have Been Strengthened | Fitness for Duty |
ML18152B704 | 1 December 1998 | LER 98-012-00:on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With 981201 Ltr | |
ML18152B708 | 30 November 1998 | Rev 0 to COLR for Surry 1 Cycle 16,Pattern Un. | |
ML18152B572 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With 981214 Ltr | Temporary Modification |
ML18152B616 | 6 November 1998 | LER 98-011-00:on 981008,diesel Driven Fire Pump Failed to Start During Performance of Monthly Operability Test.Caused by Faulty Overspeed Trip Device Failure.Diesel Driven Fire Pump Declared Inoperable | |
ML18152B624 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With 981111 Ltr | Temporary Modification Coast down |
ML18152B608 | 23 October 1998 | LER 98-010-01:on 980715,intake Canal Level Probes Were Inoperable Due to Marine Growth.Caused by Design of Canal Level Instrumentation.Canal Level Probes Will Continue to Be Monitored More Closely | Biofouling |
ML18152B688 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With 981012 Ltr | Temporary Modification |
ML18153A327 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 | Temporary Modification |
ML18152B781 | 31 July 1998 | LER 98-010-00:on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status | Biofouling |
ML18153A316 | 31 July 1998 | Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2.W/980807 Ltr | Temporary Modification |
ML18152B762 | 30 June 1998 | Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2.W/980707 Ltr | Reserve Station Service Transformer Temporary Modification |
ML18153A258 | 3 June 1998 | LER 98-009-00:on 980509,nonisolable Leak of Reactor Coolant Pump Seal Injection Line Weld,Was Discovered.Caused by Lack of Fusion or Thermal Fatigue Coupled W/Vibration Stress Due to Loose Rod Hanger.Rcp Seal Injection Line Removed | Through Wall Leak |
ML20248F744 | 31 May 1998 | Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity | |
ML18153A314 | 31 May 1998 | Monthly Operating Repts for May 1998 for Surry Power Station,Units 1 & 2.W/980610 | Temporary Modification |
ML18152B824 | 22 May 1998 | LER 98-008-00:on 980228,auxiliary Ventilation Fans Were Noted in Condition Outside of Design Basis.Caused by Failure to Recognize Potential Impact of Certain Design Basis Accident Scenarios.No Corrective Actions Needed | |
ML18152B816 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Surry Power Station Units 1 & 2.W/980508 Ltr | Fire Barrier Temporary Modification |
ML18152B795 | 29 April 1998 | LER 98-007-00:on 980330,radiation Monitors Were Declared Inoperable.Caused by Change in Operating Temperature Range. Preplanned Alternate Method of Monitoring Was Initiated IAW TS Table 3.7-6 | |
ML18153A251 | 22 April 1998 | LER 98-006-00:on 980324,unisolable Through Wall Leak of RCP Thermowell Was Noted.Cause of Leak Is Unknown.Rtd Will Be Replaced | Boric Acid Non-Destructive Examination Through Wall Leak |
ML18153A252 | 22 April 1998 | LER 98-005-01:on 980212,fire Watch Insp Exceeded One Hour. Caused by Lack of Attention to Detail by Individual Involved.Individual Involved Was Coached on Requirement to Perform Fire Watch Patrols within Required Time Frame | Fire Watch |
ML20217P994 | 7 April 1998 | Safety Evaluation Granting Licensee Third 10-yr Inservice Insp Program Relief Requests SR-018 - Sr-024 | VT-2 |
ML18153A295 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Sps,Units 1 & 2.W/ 980408 Ltr | Boric Acid Fire Barrier Temporary Modification |
ML18153A239 | 13 March 1998 | LER 98-005-00:on 980212,fire Watch Insp Frequency Exceeded One H Occurred.Category 2 Root Cause Evaluation Being Conducted to Determine Cause of Event.Station Deviation Issued | Fire Watch |
ML18153A234 | 9 March 1998 | LER 98-003-00:on 980226,no Procedural Guidance for Maintaining EDG Minimum Fuel Supply During Loop,Was Identified.Caused by Absence of Procedural Instructions. Deviation Rept Submitted to Document Deviating Condition | |
ML18153A230 | 6 March 1998 | LER 98-004-00:on 980206,fire Watch Was Released Prematurely Resulting in Violation of Ts.Caused by Inadequate Planning of Repair Activity.Work Orders Will Include Ref to Applicable Procedures Developed to Assist in Repairs | Fire Barrier Continuous fire watch Fire Watch |
ML18153A225 | 4 March 1998 | LER 98-002-00:on 980202,automatic Turbine Trip Resulted in Automatic Reactor Trip.Caused Degraded Generator Voltage Regulator sub-component Failure.Placed Plant in Safe Hot SD & Replaced Intermittent Relay & Relay Socket | Shutdown Margin |