 Issue dateTitleTopic
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with30 September 1999Monthly Operating Rept for Sept 1999 for River Bend Station. with
ML20216G1209 September 1999Rev 3 to Rbs,Cycle 9 ColrShutdown Margin
Anticipated operational occurrence
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection6 August 1999Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection
ML20210K4723 August 1999SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesPower-Operated Valves
Backfit
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With31 July 1999Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With
ML20210C6392 July 1999Rev 2 to River Bend Station,Cycle 9 Colr
RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With
ML20196J80324 June 1999Rev 1 to Rbs,Cycle 9 Colr
RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With
RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With
ML20206A21121 April 1999Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002Stroke time
Incorporated by reference
Power-Operated Valves
RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With
ML20205S06031 March 1999Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331Fuel cladding
ML20205D54826 March 1999SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5)Incorporated by reference
RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With28 February 1999Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With
RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With31 December 1998Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With
ML20198K27022 December 1998Rev 1 to RBS Cycle 8 Colr
RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With30 November 1998Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With
RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With17 November 1998LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With
ML20195C4846 November 1998SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA ProgramTemporary Modification
Process Control Program
ML20155H3493 November 1998Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003Hydrostatic
VT-2
Incorporated by reference
RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With31 October 1998Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With
ML20155C13526 October 1998Rev B to Entergy QA Program ManualSafe Shutdown
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Emergency Lighting
Process Control Program
Fire Protection Program
RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With30 September 1998Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With
ML20154E21728 September 1998Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods
ML20151S5423 September 1998Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site InspFire Barrier
RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With31 August 1998Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With
ML20236X2355 August 1998Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed
RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station31 July 1998Monthly Operating Rept for July 1998 for River Bend Station
RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 130 June 1998Monthly Operating Rept for June 1998 for River Bend Station, Unit 1
ML20249A64312 June 1998SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3)
RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 131 May 1998Monthly Operating Rept for May 1998 for River Bend Station, Unit 1
RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 130 April 1998Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1
ML20217M89530 April 1998QA Program Manual
ML20217P8287 April 1998Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i)Incorporated by reference
RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 131 March 1998Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1
RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 128 February 1998Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1
ML20203L66311 February 1998Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise
RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 131 January 1998Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1
RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 131 December 1997Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1
RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 199731 December 1997Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
ML20203H98912 December 1997Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies
ML20202E9941 December 1997ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007)Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20199K97430 November 1997Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997
RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 130 November 1997Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1
ML20202F01928 November 1997Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1
ML20199H37119 November 1997SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50Nondestructive Examination
VT-2
Incorporated by reference
RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 131 October 1997Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1
RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee13 October 1997LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee