Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with | 30 September 1999 | Monthly Operating Rept for Sept 1999 for River Bend Station. with | |
ML20216G120 | 9 September 1999 | Rev 3 to Rbs,Cycle 9 Colr | Shutdown Margin Anticipated operational occurrence |
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | |
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | 6 August 1999 | Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | |
ML20210K472 | 3 August 1999 | SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | Power-Operated Valves Backfit |
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | |
ML20210C639 | 2 July 1999 | Rev 2 to River Bend Station,Cycle 9 Colr | |
RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With | |
ML20196J803 | 24 June 1999 | Rev 1 to Rbs,Cycle 9 Colr | |
RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With | 31 May 1999 | Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With | |
RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With | |
ML20206A211 | 21 April 1999 | Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 | Stroke time Incorporated by reference Power-Operated Valves |
RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With | |
ML20205S060 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 | Fuel cladding |
ML20205D548 | 26 March 1999 | SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) | Incorporated by reference |
RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With | |
RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With | |
ML20198K270 | 22 December 1998 | Rev 1 to RBS Cycle 8 Colr | |
RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With | |
RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With | 17 November 1998 | LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With | |
ML20195C484 | 6 November 1998 | SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program | Temporary Modification Process Control Program |
ML20155H349 | 3 November 1998 | Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 | Hydrostatic VT-2 Incorporated by reference |
RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With | |
ML20155C135 | 26 October 1998 | Rev B to Entergy QA Program Manual | Safe Shutdown Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Emergency Lighting Process Control Program Fire Protection Program |
RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With | |
ML20154E217 | 28 September 1998 | Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods | |
ML20151S542 | 3 September 1998 | Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp | Fire Barrier |
RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With | |
ML20236X235 | 5 August 1998 | Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed | |
RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station | 31 July 1998 | Monthly Operating Rept for July 1998 for River Bend Station | |
RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 | 30 June 1998 | Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 | |
ML20249A643 | 12 June 1998 | SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) | |
RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 | 31 May 1998 | Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 | |
RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 | |
ML20217M895 | 30 April 1998 | QA Program Manual | |
ML20217P828 | 7 April 1998 | Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) | Incorporated by reference |
RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 | |
RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 | |
ML20203L663 | 11 February 1998 | Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise | |
RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 | |
RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 | |
RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 | 31 December 1997 | Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
ML20203H989 | 12 December 1997 | Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies | |
ML20202E994 | 1 December 1997 | ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20199K974 | 30 November 1997 | Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 | |
RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 | |
ML20202F019 | 28 November 1997 | Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 | |
ML20199H371 | 19 November 1997 | SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 | Nondestructive Examination VT-2 Incorporated by reference |
RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 | 31 October 1997 | Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 | |
RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee | 13 October 1997 | LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee |