ML17300B381 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr | |
ML17300B327 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 | |
ML17313B075 | 27 August 1999 | LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr | Missed surveillance |
ML17313B061 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr | |
ML17313B019 | 16 July 1999 | LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure | Anticipated operational occurrence |
ML17300B315 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr | |
ML17313A992 | 21 June 1999 | Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated | Offsite Dose Calculation Manual |
ML17313A991 | 18 June 1999 | Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys | |
ML17313A973 | 31 May 1999 | Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr | |
ML17313A928 | 7 May 1999 | LER 99-004-00:on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs | |
ML17313A920 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr | |
ML17313A895 | 14 April 1999 | LER 99-003-00:on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked | Ultimate heat sink Missed surveillance |
ML17313A892 | 13 April 1999 | LER 98-003-01:on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc | |
ML17313A889 | 9 April 1999 | LER 99-001-00:on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with 990409 Ltr | Shutdown Margin |
ML17300B307 | 31 March 1999 | Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee. | Safe Shutdown Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML17313A880 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr | |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20207H747 | 10 March 1999 | 1999 Emergency Preparedness Exercise 99-E-AEV-03003 | High Radiation Area Ultimate heat sink Grab sample Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Deep Dose Equivalent Chernobyl Downpower Siren |
ML17313A836 | 1 March 1999 | LER 99-001-00:on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With 990302 Ltr | Shutdown Margin |
ML17313A850 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr | |
ML17313A779 | 5 February 1999 | Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies | |
ML17313A806 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr | |
ML17313A770 | 15 January 1999 | LER 96-008-00:on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised | |
ML17313A738 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr | |
ML20206H210 | 31 December 1998 | SCE 1998 Annual Rept | |
ML17313A703 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr | |
ML17313A670 | 4 November 1998 | Rev 2 to PVNGS Unit 2 Colr. | Shutdown Margin |
ML17313A674 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 981109 Ltr | |
ML17313A661 | 24 October 1998 | LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements | |
ML17313A656 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr | |
ML17313A596 | 14 September 1998 | LER 98-002-00:on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired | |
ML17313A576 | 8 September 1998 | LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters | Time of Discovery |
ML17313A559 | 28 August 1998 | LER 98-001-00:on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to svc.W/980828 Ltr | |
ML20151S094 | 21 August 1998 | Rev 6 to COLR for PVNGS Unit 3 | Shutdown Margin |
ML20151S086 | 21 August 1998 | Rev 4 to COLR for PVNGS Unit 1 | Shutdown Margin |
ML20151S090 | 21 August 1998 | Rev 1 to COLR for PVNGS Unit 2 | Shutdown Margin |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML17313A540 | 13 August 1998 | Special Rept:On 980715,declared PASS Inoperable.Caused by Failure of Offgas Flush/Purge Control Handswitch HS0101. Handswitch Replaced & Post Maintenance Retesting Was Initiated | |
ML17313A530 | 31 July 1998 | Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr | |
ML17313A520 | 30 July 1998 | LER 98-004-00:on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve reviewed.W/980730 Ltr | Time of Discovery Missed surveillance |
ML17313A579 | 7 July 1998 | to PVNGS SG Tube ISI Results for Seventh Refueling Outage Mar & Apr 1998. | |
ML17313A500 | 30 June 1998 | Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr | |
ML17313A467 | 19 June 1998 | LER 98-007-00:on 980520,CR Personnel Observed Flow & Pressure Perturbations on Chemical & Vol Control Sys Letdown Sys.Caused by Cyclic Fatigue Due to Dynamic Pressure Transients.Unit Letdown Piping Replaced | |
ML17313A452 | 19 June 1998 | Rev 5 to COLR for Pvngs,Unit 3. | Shutdown Margin |
ML17313A450 | 19 June 1998 | Rev 4 to COLR for Pvngs,Unit 3. | Shutdown Margin |
ML17313A413 | 5 June 1998 | LER 98-006-00:on 980507,determined That Plant Was Outside Design Basis Due to SI Discharge Check Valve Reverse Flow. Check Valve Was Disassembled,Examined & Reassembled, Whereupon Valve Met Acceptance Criteria | Unanalyzed Condition |
ML17313A421 | 31 May 1998 | Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr | |
ML17313A395 | 26 May 1998 | LER 98-005-00:on 980428,noted That Required Response Time Testing Had Not Been Performed.Caused by Personnel Error. Coached I&C Personnel Responsible for Reviewing Work Authorization Documentation | |
ML17313A369 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr | |
ML17313A325 | 1 April 1998 | LER 98-004-00:on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three Mssv'S & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7 | Safe Shutdown Time of Discovery |