Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18017A9188 October 1999LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr
ML18017A91530 September 1999Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML18017A86710 September 1999LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr
ML18017A86231 August 1999Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr
ML18016B0484 August 1999LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised
ML18017A83631 July 1999Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr
ML18016B01530 June 1999Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML18016A9804 June 1999LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr
ML18016A98531 May 1999Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr
ML18017A89812 May 1999Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines.
ML18016A95830 April 1999Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML18016A91112 April 1999LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr
ML18016A8978 April 1999LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr
ML18016A8945 April 1999Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760
ML18016A91031 March 1999Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
ML18016A86631 March 1999Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept.Boric Acid
Shutdown Margin
Emergency Lighting
ML18017A89328 February 1999Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant.Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Chernobyl
Fuel cladding
ML18016A85528 February 1999Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr
ML18016A82622 February 1999LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 LtrSafe Shutdown
Fire Barrier
Fire Protection Program
ML18016A85318 February 1999Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'.High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Depleted uranium
ML18016A81112 February 1999LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr
ML18016A7975 February 1999LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr
ML18022B0634 February 1999Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable DrawingsHydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML20202J1161 February 1999SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing ProgramIncorporated by reference
ML18016A80431 January 1999Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr
ML18016A79429 January 1999LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by VendorUnanalyzed Condition
ML18016A78031 December 1998Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr
ML18016A76730 November 1998Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr
ML18016A97328 November 1998Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 LtrSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Coatings
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Operability Determination
Fuel cladding
Pressure Boundary Leakage
Continuous fire watch
Siren
ML18016A83528 November 1998ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1.Hydrostatic
Anchor Darling
Nondestructive Examination
Liquid penetrant
ML18016A74125 November 1998Rev 1 to Shnpp Cycle 9 Colr.Shutdown Margin
ML18016A72117 November 1998LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 LtrDownpower
ML18016A7073 November 1998Rev 0 to Harris Unit 1 Cycle 9 Colr.Shutdown Margin
ML18016A72031 October 1998Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr
ML20154F8706 October 1998Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation ValvesHigh Radiation Area
Incorporated by reference
ML18016A62030 September 1998Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
ML18016A59721 September 1998Rev 1 to Harris Unit 1 Cycle 8 Colr.Shutdown Margin
ML18016A58831 August 1998Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr
ML18016A50731 July 1998Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr
ML18016A9437 July 1998Rev 1 to QAP Manual.Safe Shutdown
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Condition Adverse to Quality
Fire Protection Program
ML18016A4847 July 1998LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC SysStroke time
Temporary Modification
ML18016A93730 June 1998Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp.
ML18016A48630 June 1998Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr
ML18016A47030 June 1998LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11
ML18016A4498 June 1998LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr
ML18016A45231 May 1998Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr
ML18016A77126 May 1998Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'.High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure