Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217F992 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20212F564 | 23 September 1999 | SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits | Fire Barrier |
ML20211Q317 | 9 September 1999 | Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 | |
ML20216E488 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With | |
ML20211A692 | 31 July 1999 | Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20209J196 | 12 July 1999 | Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented | |
ML20196K498 | 1 July 1999 | Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable | High Radiation Area Stroke time Incorporated by reference Foreign Material Exclusion Power-Operated Valves Scaffolding |
ML20209G069 | 30 June 1999 | Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20196A116 | 31 May 1999 | Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With | |
ML20206Q483 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With | |
ML20206J120 | 30 April 1999 | Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators | |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205P877 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20207K514 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20206T799 | 31 January 1999 | Iodine Revolatizitation in Grand Gulf Loca | |
ML20207A830 | 31 December 1998 | 1998 Annual Operating Rept for Ggns,Unit 1 | Fire Watch |
ML20206R950 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20206D772 | 31 December 1998 | South Mississippi Electric Power Association 1998 Annual Rept | |
ML20198E248 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20195F412 | 13 November 1998 | Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) | Safe Shutdown Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Finite Element Analysis Condition Adverse to Quality |
ML20195C484 | 6 November 1998 | SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program | Temporary Modification Process Control Program |
ML20195C279 | 5 November 1998 | BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 | |
ML20195F480 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20155C135 | 26 October 1998 | Rev B to Entergy QA Program Manual | Safe Shutdown Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Emergency Lighting Process Control Program Fire Protection Program |
ML20154K239 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With | |
ML20155F196 | 1 September 1998 | Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw | |
ML20153B216 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20237B666 | 31 July 1998 | Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 | |
ML20236R023 | 30 June 1998 | Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 | |
ML20155J081 | 31 May 1998 | 10CFR50.59 SE for Period Jan 1997 - May 1998 | Safe Shutdown Shutdown Margin Loop seal Packing leak Half scram Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Hydrostatic Tornado Generated Missile Excess Flow Check Valve Battery sizing Moisture barrier Control of Heavy Loads Turbine Missile Pressure boundary leak Fire Protection Program Fire Watch Grace period Power change Unidentified leakage |
ML20249B125 | 31 May 1998 | Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 | |
ML20248B626 | 11 May 1998 | Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related | |
ML20217Q670 | 6 May 1998 | SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles | Incorporated by reference |
ML20206J127 | 30 April 1998 | Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves | FLEX |
ML20247F359 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 | |
ML20217M895 | 30 April 1998 | QA Program Manual | |
ML20217P828 | 7 April 1998 | Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) | Incorporated by reference |
ML20217P038 | 6 April 1998 | Safety Evaluation Supporting Amend 135 to License NPF-29 | Exemption Request |
ML20217A029 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 | |
ML20216J421 | 18 March 1998 | SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station | Incorporated by reference |
ML20216J202 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 | |
ML20203A289 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station | |
ML20247B411 | 31 December 1997 | 1997 Annual Financial Rept for South Mississippi Electric Power Association | |
ML20203H974 | 31 December 1997 | 1997 Annual Operating Rept, for Ggns,Unit 1 | |
ML20198P112 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 | |
ML20203B558 | 4 December 1997 | Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 | |
ML20203K403 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 | |
ML20199H371 | 19 November 1997 | SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 | Nondestructive Examination VT-2 Incorporated by reference |
ML20199F343 | 18 November 1997 | SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 | Condition Adverse to Quality |