Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217F99230 September 1999Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20212F56423 September 1999SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity LimitsFire Barrier
ML20211Q3179 September 1999Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996
ML20216E48831 August 1999Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With
ML20211A69231 July 1999Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20209J19612 July 1999Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented
ML20196K4981 July 1999Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI AcceptableHigh Radiation Area
Stroke time
Incorporated by reference
Foreign Material Exclusion
Power-Operated Valves
Scaffolding
ML20209G06930 June 1999Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20196A11631 May 1999Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With
ML20206Q48330 April 1999Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With
ML20206J12030 April 1999Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205P87731 March 1999Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20207K51428 February 1999Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20206T79931 January 1999Iodine Revolatizitation in Grand Gulf Loca
ML20207A83031 December 19981998 Annual Operating Rept for Ggns,Unit 1Fire Watch
ML20206R95031 December 1998Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20206D77231 December 1998South Mississippi Electric Power Association 1998 Annual Rept
ML20198E24830 November 1998Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20195F41213 November 1998Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam)Safe Shutdown
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Finite Element Analysis
Condition Adverse to Quality
ML20195C4846 November 1998SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA ProgramTemporary Modification
Process Control Program
ML20195C2795 November 1998BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006
ML20195F48031 October 1998Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20155C13526 October 1998Rev B to Entergy QA Program ManualSafe Shutdown
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Emergency Lighting
Process Control Program
Fire Protection Program
ML20154K23930 September 1998Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With
ML20155F1961 September 1998Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw
ML20153B21631 August 1998Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20237B66631 July 1998Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1
ML20236R02330 June 1998Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1
ML20155J08131 May 199810CFR50.59 SE for Period Jan 1997 - May 1998Safe Shutdown
Shutdown Margin
Loop seal
Packing leak
Half scram
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Tornado Generated Missile
Excess Flow Check Valve
Battery sizing
Moisture barrier
Control of Heavy Loads
Turbine Missile
Pressure boundary leak
Fire Protection Program
Fire Watch
Grace period
Power change
Unidentified leakage
ML20249B12531 May 1998Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1
ML20248B62611 May 1998Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related
ML20217Q6706 May 1998SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating CyclesIncorporated by reference
ML20206J12730 April 1998Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate ValvesFLEX
ML20247F35930 April 1998Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1
ML20217M89530 April 1998QA Program Manual
ML20217P8287 April 1998Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i)Incorporated by reference
ML20217P0386 April 1998Safety Evaluation Supporting Amend 135 to License NPF-29Exemption Request
ML20217A02931 March 1998Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1
ML20216J42118 March 1998SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear StationIncorporated by reference
ML20216J20228 February 1998Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1
ML20203A28931 January 1998Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station
ML20247B41131 December 19971997 Annual Financial Rept for South Mississippi Electric Power Association
ML20203H97431 December 19971997 Annual Operating Rept, for Ggns,Unit 1
ML20198P11231 December 1997Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1
ML20203B5584 December 1997Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2
ML20203K40330 November 1997Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1
ML20199H37119 November 1997SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50Nondestructive Examination
VT-2
Incorporated by reference
ML20199F34318 November 1997SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1Condition Adverse to Quality