Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217H899 | 18 October 1999 | SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference |
NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Daec.With | |
ML20212H238 | 22 September 1999 | Safety Evaluation Supporting Amend 228 to License DPR-49 | Anticipated operational occurrence |
NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With | |
NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Daec.With | |
NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Daec.With | |
ML20195G990 | 9 June 1999 | Safety Evaluation Supporting Amend 227 to License DPR-49 | |
NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Daec.With | Downpower |
ML20206N755 | 13 May 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves | Power-Operated Valves Backfit |
NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With | |
NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Daec.With | |
ML20207G025 | 3 March 1999 | SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 | Stroke time |
NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Daec.With | |
ML20202B431 | 26 January 1999 | Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr | Incorporated by reference |
ML20202B385 | 26 January 1999 | Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable | Fire Barrier |
NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Daec.With | |
ML20206N321 | 7 December 1998 | Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 | Finite Element Analysis |
NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Daec.With | |
ML20196F957 | 24 November 1998 | Rev 20 to QA Program Description,Ufsar 17.2 for Daec | Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program |
NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Daec.With | |
NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Daec.With | |
NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with | 30 September 1998 | Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with | Safe Shutdown High Radiation Area Fire Barrier Stroke time Commercial Grade Dedication Safe Shutdown Earthquake Coatings Anchor Darling Temporary Modification Incorporated by reference Locked High Radiation Area Abnormal operational transient Design basis earthquake Scram Discharge Volume Feedwater Controller Failure Excess Flow Check Valve Fast acting solenoid valve Earthquake Maintenance Rule Program Fuel cladding Fire Protection Program Fire Watch |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML20153B414 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for DAEC | |
NG-98-1389, Monthly Operating Rept for July 1998 for DAEC | 31 July 1998 | Monthly Operating Rept for July 1998 for DAEC | |
ML20236X532 | 29 July 1998 | Safety Evaluation Re USI A-46 Program Implementation for Plant | Safe Shutdown Safe Shutdown Earthquake Earthquake Scaffolding |
ML20236W002 | 29 July 1998 | Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) | Incorporated by reference |
ML20236S254 | 14 July 1998 | Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods | |
ML20236R325 | 30 June 1998 | Monthly Operating Rept for June 1998 for DAEC | Safe Shutdown Time of Discovery |
ML20249B517 | 31 May 1998 | Monthly Operating Rept for May 1998 for DAEC | VT-2 |
ML20247P565 | 18 May 1998 | Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard | |
ML20247K188 | 8 May 1998 | Rev 0 to Cycle 16 COLR, for May 1998 | |
ML20247H938 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for DAEC | Hydrostatic |
ML20216J917 | 16 April 1998 | Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request | Non-Destructive Examination Nondestructive Examination Incorporated by reference |
ML20217K725 | 16 April 1998 | Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp | |
ML20217K047 | 1 April 1998 | Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety | Weld Overlay Incorporated by reference Liquid penetrant |
ML20217H883 | 1 April 1998 | Safety Evaluation Supporting Request for Relief for Third ISI Program | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center | |
ML20216F679 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for DAEC | Coast down |
ML20217F884 | 23 March 1998 | Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant | |
NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC | 28 February 1998 | Monthly Operating Rept for Feb 1998 for DAEC | Downpower |
NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center | |
ML20199L348 | 31 January 1998 | Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Time to boil Operating Basis Earthquake Scram Discharge Volume Earthquake Pressure Boundary Leakage Power change |
ML20249B333 | 31 December 1997 | 1997 Annual Rept for Alliant Corporation | |
ML20249B339 | 31 December 1997 | Central Iowa Power Coopertive 1997 Annual Rept | |
ML20249B335 | 31 December 1997 | 1997 Annual Rept for Corn Belt Power Cooperative | Open House |
NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center | |
NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC | 30 November 1997 | Monthly Operating Rept for Nov 1997 for DAEC | |
ML20199J684 | 21 November 1997 | SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center | VT-2 Incorporated by reference |
NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC | 31 October 1997 | Monthly Operating Rept for Oct 1997 for DAEC | Downpower |