 Issue dateTitleTopic
ML20217H02030 September 1999Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2
ML20216E5407 September 1999Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826
ML20212B47131 August 1999Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217H03231 August 1999Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20211B12831 August 1999Dynamic Rod Worth Measurement Using Casmo/Simulate
ML20211A97920 August 1999Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2Incorporated by reference
ML20211F34417 August 1999Updated non-proprietary Page 2-4 of TR DPC-NE-2009
ML20211C12917 August 1999ISI Rept Unit 1 Catawba 1999 RFO 11Dissimilar Metal Weld
ML20210R1056 August 1999Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced
ML20210S28931 July 1999Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2
ML20212B48731 July 1999Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2
ML20209E4369 July 1999SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation
ML20196K6637 July 1999Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers
ML20210S29530 June 1999Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2
ML20209H45030 June 1999Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2
ML20209H45631 May 1999Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206T47731 May 1999Rev 3 to UFSAR Chapter 15 Sys Transient Analysis MethodologyBoric Acid
Shutdown Margin
Loop seal
Fuel cladding
Coast down
Affidavit
ML20196L18831 May 1999Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response MethodologyGOTHIC
ML20196A00031 May 1999Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206P52014 May 1999Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated ValvesStroke time
ML20206N8394 May 1999Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 ColrBoric Acid
ML20206R18130 April 1999Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20196A00430 April 1999Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206N82622 April 1999Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not IncludedBoric Acid
Shutdown Margin
ML20205S55521 April 1999Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions
ML20205N36512 April 1999Safety Evaluation Accepting IPE of External Events SubmittalFire Barrier
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20206R19331 March 1999Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20205P95231 March 1999Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2
ML20205P95628 February 1999Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2
ML20204C91128 February 1999Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2
ML20203A2585 February 1999Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE
ML20204C91631 January 1999Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2
ML20199K87113 January 1999Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9High Radiation Area
Hydrostatic
Incorporated by reference
Through-Wall Leak
Dissimilar Metal Weld
ML20199E30731 December 1998Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2
ML20216F99331 December 1998Piedmont Municipal Power Agency 1998 Annual Rept
ML20205E94431 December 19981998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With
ML20206P20831 December 1998Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor
ML20203A41022 December 1998Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 ColrBoric Acid
Shutdown Margin
ML20203A40422 December 1998Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 ColrBoric Acid
Shutdown Margin
ML20198B13414 December 1998Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected AreasFire Barrier
Fire Protection Program
Early Warning Fire Detection
ML20196J8358 December 1998Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys
ML20199E32230 November 1998Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure
ML20198E31530 November 1998Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2
ML20196C02527 November 1998SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station
ML20196A68825 November 1998Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three WeldsHydrostatic
VT-2
ML20196D40419 November 1998Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised
ML20195E55231 October 1998Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2
ML20198E32631 October 1998Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2
ML20154M76612 October 1998LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With