Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217H020 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20216E540 | 7 September 1999 | Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 | |
ML20212B471 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20217H032 | 31 August 1999 | Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20211B128 | 31 August 1999 | Dynamic Rod Worth Measurement Using Casmo/Simulate | |
ML20211A979 | 20 August 1999 | Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 | Incorporated by reference |
ML20211F344 | 17 August 1999 | Updated non-proprietary Page 2-4 of TR DPC-NE-2009 | |
ML20211C129 | 17 August 1999 | ISI Rept Unit 1 Catawba 1999 RFO 11 | Dissimilar Metal Weld |
ML20210R105 | 6 August 1999 | Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced | |
ML20210S289 | 31 July 1999 | Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20212B487 | 31 July 1999 | Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20209E436 | 9 July 1999 | SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation | |
ML20196K663 | 7 July 1999 | Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers | |
ML20210S295 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20209H450 | 30 June 1999 | Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20209H456 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology | Boric Acid Shutdown Margin Loop seal Fuel cladding Coast down Affidavit |
ML20196L188 | 31 May 1999 | Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology | GOTHIC |
ML20196A000 | 31 May 1999 | Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206P520 | 14 May 1999 | Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | Stroke time |
ML20206N839 | 4 May 1999 | Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr | Boric Acid |
ML20206R181 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20196A004 | 30 April 1999 | Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206N826 | 22 April 1999 | Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included | Boric Acid Shutdown Margin |
ML20205S555 | 21 April 1999 | Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions | |
ML20205N365 | 12 April 1999 | Safety Evaluation Accepting IPE of External Events Submittal | Fire Barrier Internal Flooding Probabilistic Risk Assessment Earthquake |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20206R193 | 31 March 1999 | Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20205P952 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20205P956 | 28 February 1999 | Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20204C911 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20203A258 | 5 February 1999 | Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE | |
ML20204C916 | 31 January 1999 | Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20199K871 | 13 January 1999 | Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 | High Radiation Area Hydrostatic Incorporated by reference Through-Wall Leak Dissimilar Metal Weld |
ML20199E307 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 | |
ML20216F993 | 31 December 1998 | Piedmont Municipal Power Agency 1998 Annual Rept | |
ML20205E944 | 31 December 1998 | 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With | |
ML20206P208 | 31 December 1998 | Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor | |
ML20203A410 | 22 December 1998 | Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr | Boric Acid Shutdown Margin |
ML20203A404 | 22 December 1998 | Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr | Boric Acid Shutdown Margin |
ML20198B134 | 14 December 1998 | Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas | Fire Barrier Fire Protection Program Early Warning Fire Detection |
ML20196J835 | 8 December 1998 | Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys | |
ML20199E322 | 30 November 1998 | Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure | |
ML20198E315 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 | |
ML20196C025 | 27 November 1998 | SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station | |
ML20196A688 | 25 November 1998 | Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds | Hydrostatic VT-2 |
ML20196D404 | 19 November 1998 | Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised | |
ML20195E552 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 | |
ML20198E326 | 31 October 1998 | Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 | |
ML20154M766 | 12 October 1998 | LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With |