Issue date | Title | Topic | |
---|---|---|---|
ML20217G697 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With | |
ML20216J873 | 10 September 1999 | Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant | Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Process Control Program Fire Protection Program |
ML20212A444 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with | |
ML17326A201 | 23 August 1999 | LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr | Safe Shutdown High winds |
ML20210S609 | 31 July 1999 | Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with | |
ML20210N600 | 27 July 1999 | ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included | Hydrostatic Coatings Moisture barrier |
ML20210B794 | 15 July 1999 | SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs | Incorporated by reference |
LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified | 30 June 1999 | Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified | |
ML20209F172 | 30 June 1999 | Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With | |
LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed | 25 June 1999 | Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed | |
ML20196C698 | 21 June 1999 | Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable | Incorporated by reference |
ML20195K281 | 31 May 1999 | Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with | |
ML20206R587 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with | |
ML20195B389 | 30 April 1999 | 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models | Fuel cladding |
ML20205N295 | 13 April 1999 | Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored | Fire Barrier Continuous fire watch Hourly Fire Watch |
ML20210T521 | 1 April 1999 | Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 | Shutdown Margin |
ML20205P544 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With | |
ML20204H647 | 21 March 1999 | SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 | License Renewal |
ML20207M832 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With | |
ML20203D431 | 5 February 1999 | Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons | |
ML20199G467 | 20 January 1999 | SER Accepting USI A-46 Implementation for Plant | Safe Shutdown Operating Basis Earthquake Earthquake Scaffolding |
ML20206Q322 | 11 January 1999 | Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 | |
ML20207L045 | 8 January 1999 | Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors | Large early release frequency Earthquake Chernobyl |
ML20199F478 | 8 January 1999 | Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed | Safe Shutdown Boric Acid Power-Operated Valves Backfit |
ML20198S759 | 7 January 1999 | SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 | |
ML20207M228 | 31 December 1998 | 1998 Annual Rept for Bg&E. with | |
ML20199E293 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with | |
ML20206R991 | 8 December 1998 | Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with | Safe Shutdown Shutdown Margin Internal Flooding Emergency Lighting Turbine Missile Through Wall Leak |
ML20198B263 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With | |
ML20195H100 | 16 November 1998 | Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative | |
ML20196E221 | 31 October 1998 | Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves | Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Power change |
ML20195E528 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With | |
ML20154Q719 | 21 October 1998 | Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation | |
ML20154G393 | 5 October 1998 | Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code | |
ML20154M584 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With | |
ML20153C257 | 18 September 1998 | Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 | |
ML20153C109 | 18 September 1998 | Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves | |
ML20151U544 | 4 September 1998 | Bg&E ISI Summary Rept for Calvert Cliffs | Boric Acid Hydrostatic VT-2 |
ML20151T528 | 1 September 1998 | Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced | Reactor Vessel Water Level |
ML20151Y119 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With | |
ML20237D498 | 19 August 1998 | Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval | Incorporated by reference |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML20237B937 | 31 July 1998 | Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant | |
ML20237D594 | 22 July 1998 | Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 | Shutdown Margin |
ML20236L752 | 6 July 1998 | Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness | Incorporated by reference |
ML20236F779 | 30 June 1998 | Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 | Incorporated by reference |
ML20236R088 | 30 June 1998 | Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 | |
ML20236X310 | 19 June 1998 | Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 | Shutdown Margin |
ML20249A957 | 15 June 1998 | Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc | |
ML20249A771 | 31 May 1998 | Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 |