 Issue dateTitleTopic
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with30 September 1999Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With2 September 1999LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with31 August 1999Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With31 July 1999Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.WithZebra Mussel
L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with30 June 1999Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with
ML20209D95327 June 1999Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with31 May 1999Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with
L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable3 May 1999Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable
L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.WithFlow Induced Vibration
ML20205L0409 April 1999SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2Boric Acid
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite5 April 1999Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite
L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with31 March 1999Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with
ML20196K79825 March 1999Rev 4 to COLR, for Cycle 8
L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with28 February 1999Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with
ML20203E11810 February 1999SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description
L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced5 February 1999Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced
ML20196F70131 January 1999BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626Hydrostatic
ML20203D48131 January 1999Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With
ML20207E66328 January 1999Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13Nondestructive Examination
ML20210G70422 January 1999BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122Boric Acid
Fire Barrier
Temporary Modification
ML20207E58631 December 1998Annual Rept 1998 for Toledo Edison
ML20207E56031 December 1998Annual Rept 1998 for Pennpower
ML20198B90231 December 1998BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998Boric Acid
Main transformer failure
ML20207E59031 December 1998Dqe 1998 Annual Rept to Shareholders
ML20199C99731 December 1998Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with
ML20207E55231 December 1998Annual Rept 1998 for Ohio Edison
ML20207E57631 December 1998Annual Rept 1998 for Illuminating Co
ML20204J67531 December 19981998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2
ML20199F53429 December 1998Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1Boric Acid
VT-2
Incorporated by reference
ML20198K85521 December 1998SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1Incorporated by reference
ML20198A1639 December 1998SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) RequestSafe Shutdown
Safe Shutdown Earthquake
Nondestructive Examination
Design basis earthquake
Earthquake
L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with30 November 1998Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with
ML20195J31312 November 1998Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for ReliefVT-2
Incorporated by reference
L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with31 October 1998Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with
ML20206G02931 October 1998BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Temporary Modification
Process Control Program
Fuel cladding
ML20154R91220 October 1998Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept
ML20154P74919 October 1998SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1Incorporated by reference
ML20198F7616 October 1998Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006Packing leak
ML20154C6711 October 1998Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to AmpacityFire Barrier
Aging Management
ML20154D50030 September 1998Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action TakenMissed surveillance
L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With30 September 1998Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With
ML20154E21728 September 1998Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods
L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure21 September 1998Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure
L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with31 August 1998Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with
ML20155B58728 August 1998Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant
ML20236X2355 August 1998Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed
L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 231 July 1998Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2
L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product29 July 1998Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product
L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 230 June 1998Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2
L-98-119, Monthly Operating Repts for Bvps,Units 1 & 231 May 1998Monthly Operating Repts for Bvps,Units 1 & 2