L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | |
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | 2 September 1999 | LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | |
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | |
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | Zebra Mussel |
L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | |
ML20209D953 | 27 June 1999 | Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with | |
L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable | 3 May 1999 | Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable | |
L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With | Flow Induced Vibration |
ML20205L040 | 9 April 1999 | SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite | 5 April 1999 | Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite | |
L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with | |
ML20196K798 | 25 March 1999 | Rev 4 to COLR, for Cycle 8 | |
L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with | |
ML20203E118 | 10 February 1999 | SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description | |
L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced | 5 February 1999 | Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced | |
ML20196F701 | 31 January 1999 | BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 | Hydrostatic |
ML20203D481 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With | |
ML20207E663 | 28 January 1999 | Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 | Nondestructive Examination |
ML20210G704 | 22 January 1999 | BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 | Boric Acid Fire Barrier Temporary Modification |
ML20207E586 | 31 December 1998 | Annual Rept 1998 for Toledo Edison | |
ML20207E560 | 31 December 1998 | Annual Rept 1998 for Pennpower | |
ML20198B902 | 31 December 1998 | BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 | Boric Acid Main transformer failure |
ML20207E590 | 31 December 1998 | Dqe 1998 Annual Rept to Shareholders | |
ML20199C997 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with | |
ML20207E552 | 31 December 1998 | Annual Rept 1998 for Ohio Edison | |
ML20207E576 | 31 December 1998 | Annual Rept 1998 for Illuminating Co | |
ML20204J675 | 31 December 1998 | 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 | |
ML20199F534 | 29 December 1998 | Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 | Boric Acid VT-2 Incorporated by reference |
ML20198K855 | 21 December 1998 | SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 | Incorporated by reference |
ML20198A163 | 9 December 1998 | SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request | Safe Shutdown Safe Shutdown Earthquake Nondestructive Examination Design basis earthquake Earthquake |
L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with | |
ML20195J313 | 12 November 1998 | Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief | VT-2 Incorporated by reference |
L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with | |
ML20206G029 | 31 October 1998 | BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Temporary Modification Process Control Program Fuel cladding |
ML20154R912 | 20 October 1998 | Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept | |
ML20154P749 | 19 October 1998 | SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 | Incorporated by reference |
ML20198F761 | 6 October 1998 | Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 | Packing leak |
ML20154C671 | 1 October 1998 | Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity | Fire Barrier Aging Management |
ML20154D500 | 30 September 1998 | Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken | Missed surveillance |
L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With | |
ML20154E217 | 28 September 1998 | Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods | |
L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure | 21 September 1998 | Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure | |
L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with | |
ML20155B587 | 28 August 1998 | Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant | |
ML20236X235 | 5 August 1998 | Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed | |
L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 | 31 July 1998 | Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 | |
L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product | 29 July 1998 | Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product | |
L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 | 30 June 1998 | Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 | |
L-98-119, Monthly Operating Repts for Bvps,Units 1 & 2 | 31 May 1998 | Monthly Operating Repts for Bvps,Units 1 & 2 |