ML17309A99630 June 1999Rev 35 to HP-90, Emergency Equipment.Safe Shutdown
Unanalyzed Condition
Fitness for Duty
Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Minimum staff
Downpower
Siren
ML17309A99417 June 1999Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples.
ML17241A3541 June 1999Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable StatusEnforcement Discretion
Probabilistic Risk Assessment
ML17309A99527 May 1999Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples.
ML17241A34524 May 1999Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks
ML17229B07119 March 1999Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron CreditShutdown Margin
ML17229B0442 March 1999Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr
ML17229B02023 February 1999Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron DilutionBoric Acid
Shutdown Margin
ML17229B03622 December 1998Rev 20 to Procedure C-200, Odcm.Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML17229A95516 December 1998Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position
ML17229A91625 November 1998Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases
ML17229A92522 November 1998Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1Shutdown Margin
ML17229A91319 November 1998Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position
ML20155C30629 October 1998Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses
ML20153G07826 August 1998Rev 19 to Plstqp, Guard Training & Qualification PlanContraband
ML17229A84424 August 1998Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation SignalEnforcement Discretion
Large early release frequency
ML17229A77315 June 1998Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.bShutdown Margin
ML17229A7603 June 1998Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank
ML17229A74427 May 1998Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant ProceduresOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML17229A74827 May 1998Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions
ML17229A75127 May 1998Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews
ML17229A67527 March 1998Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr
ML17229A6503 March 1998Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative ControlsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Process Control Program
ML17229A63812 February 1998Rev 19 to C-200, Offsite Dose Calculation Manual.Boric Acid
Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML17229A61512 January 1998Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan.High Radiation Area
Anchor Darling
Locked High Radiation Area
ML17229A61412 January 1998Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1.Boric Acid
Shutdown Margin
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
Scaffolding
ML17229A56931 December 1997Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity
ML17309A91329 December 1997Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting ValuesBoric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Fuel cladding
ML17229A58512 December 1997Rev 0 to ADM-29.01, IST Program for Pumps & Valves.Safe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Cold shutdown justification
Power-Operated Valves
ML17229A5491 December 1997Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion
ML17309A91726 November 1997Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis.Boric Acid
Ultimate heat sink
Spent Fuel Pool Instrumentation
ML17229A59326 September 1997Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures.Boric Acid
Offsite Dose Calculation Manual
Foreign Material Exclusion
Process Control Program
Safeguards Contingency Plan
Earthquake
Fuel cladding
Fire Protection Program
ML17229A59218 September 1997Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening.Scaffolding
ML20211Q58410 September 1997Rev 18 to Training & Qualification PlanContraband
ML17229A46222 August 1997Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8Boric Acid
Shutdown Margin
ML17229A4341 August 1997Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE
ML17309A89511 June 1997Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project.Exemption Request
ML17229A36029 May 1997Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related BasesBoric Acid
Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Fuel cladding
ML17229A2986 March 1997Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A.
ML17229A18320 December 1996Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings
ML17229A1619 December 1996Proposed Tech Specs 1.9a Re Core Operating Limits ReptShutdown Margin
Annual Radiological Environmental Operating Report
Fuel cladding
ML17229A11931 October 1996Proposed Tech Specs 6.0 Re Administrative ControlsProcess Control Program
Fire Protection Program
ML17229A11130 October 1996Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel
ML17229A10628 October 1996Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel
ML17229A10928 October 1996Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria
ML17229A09524 October 1996Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage.Hydrostatic
Through-Wall Leak
ML17229A08618 October 1996Startup Physics Testing Rept. W/961018 Ltr
ML17229A24423 September 1996Rev 18 to Offsite Dose Calculation Manual (Odcm).Boric Acid
Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML17228B56415 July 1996Revised Tech Specs Re Core Alteration Definition
ML17229A09612 June 1996Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination.Hydrostatic