Issue date | Title | Topic | |
---|---|---|---|
ML17309A996 | 30 June 1999 | Rev 35 to HP-90, Emergency Equipment. | Safe Shutdown Unanalyzed Condition Fitness for Duty Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Severe Accident Management Guideline Safeguards Contingency Plan Earthquake Deep Dose Equivalent Minimum staff Downpower Siren |
ML17309A994 | 17 June 1999 | Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. | |
ML17241A354 | 1 June 1999 | Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status | Enforcement Discretion Probabilistic Risk Assessment |
ML17309A995 | 27 May 1999 | Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. | |
ML17241A345 | 24 May 1999 | Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks | |
ML17229B071 | 19 March 1999 | Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit | Shutdown Margin |
ML17229B044 | 2 March 1999 | Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr | |
ML17229B020 | 23 February 1999 | Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution | Boric Acid Shutdown Margin |
ML17229B036 | 22 December 1998 | Rev 20 to Procedure C-200, Odcm. | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML17229A955 | 16 December 1998 | Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position | |
ML17229A916 | 25 November 1998 | Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases | |
ML17229A925 | 22 November 1998 | Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 | Shutdown Margin |
ML17229A913 | 19 November 1998 | Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position | |
ML20155C306 | 29 October 1998 | Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses | |
ML20153G078 | 26 August 1998 | Rev 19 to Plstqp, Guard Training & Qualification Plan | Contraband |
ML17229A844 | 24 August 1998 | Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal | Enforcement Discretion Large early release frequency |
ML17229A773 | 15 June 1998 | Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b | Shutdown Margin |
ML17229A760 | 3 June 1998 | Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank | |
ML17229A744 | 27 May 1998 | Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML17229A748 | 27 May 1998 | Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions | |
ML17229A751 | 27 May 1998 | Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews | |
ML17229A675 | 27 March 1998 | Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr | |
ML17229A650 | 3 March 1998 | Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls | Boric Acid Shutdown Margin Anticipated operational occurrence Process Control Program |
ML17229A638 | 12 February 1998 | Rev 19 to C-200, Offsite Dose Calculation Manual. | Boric Acid Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML17229A615 | 12 January 1998 | Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. | High Radiation Area Anchor Darling Locked High Radiation Area |
ML17229A614 | 12 January 1998 | Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. | Boric Acid Shutdown Margin Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML17229A569 | 31 December 1997 | Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity | |
ML17309A913 | 29 December 1997 | Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values | Boric Acid Shutdown Margin Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Fuel cladding |
ML17229A585 | 12 December 1997 | Rev 0 to ADM-29.01, IST Program for Pumps & Valves. | Safe Shutdown Boric Acid Shutdown Margin Stroke time Cold shutdown justification Power-Operated Valves |
ML17229A549 | 1 December 1997 | Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion | |
ML17309A917 | 26 November 1997 | Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. | Boric Acid Ultimate heat sink Spent Fuel Pool Instrumentation |
ML17229A593 | 26 September 1997 | Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. | Boric Acid Offsite Dose Calculation Manual Foreign Material Exclusion Process Control Program Safeguards Contingency Plan Earthquake Fuel cladding Fire Protection Program |
ML17229A592 | 18 September 1997 | Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. | Scaffolding |
ML20211Q584 | 10 September 1997 | Rev 18 to Training & Qualification Plan | Contraband |
ML17229A462 | 22 August 1997 | Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 | Boric Acid Shutdown Margin |
ML17229A434 | 1 August 1997 | Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE | |
ML17309A895 | 11 June 1997 | Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. | Exemption Request |
ML17229A360 | 29 May 1997 | Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Fuel cladding |
ML17229A298 | 6 March 1997 | Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. | |
ML17229A183 | 20 December 1996 | Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings | |
ML17229A161 | 9 December 1996 | Proposed Tech Specs 1.9a Re Core Operating Limits Rept | Shutdown Margin Annual Radiological Environmental Operating Report Fuel cladding |
ML17229A119 | 31 October 1996 | Proposed Tech Specs 6.0 Re Administrative Controls | Process Control Program Fire Protection Program |
ML17229A111 | 30 October 1996 | Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel | |
ML17229A106 | 28 October 1996 | Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel | |
ML17229A109 | 28 October 1996 | Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria | |
ML17229A095 | 24 October 1996 | Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage. | Hydrostatic Through-Wall Leak |
ML17229A086 | 18 October 1996 | Startup Physics Testing Rept. W/961018 Ltr | |
ML17229A244 | 23 September 1996 | Rev 18 to Offsite Dose Calculation Manual (Odcm). | Boric Acid Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML17228B564 | 15 July 1996 | Revised Tech Specs Re Core Alteration Definition | |
ML17229A096 | 12 June 1996 | Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. | Hydrostatic |