Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G51214 October 1999Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1
ML20217G43414 October 1999Rev C to Proposed TS Change Re Conversion to Improved Standard TSs
ML20217D99613 October 1999Risk-Informed ISI Program Plan for Ja FitzpatrickNon-Destructive Examination
VT-2
ML20216J38729 September 1999Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer
ML20196F60722 June 1999Proposed Tech Specs Re pressure-temp LimitsHydrostatic
ML20195B8831 June 1999Proposed Tech Specs,Converting to Improved Std TS
ML20206U14219 May 1999Proposed Tech Specs Revising AOTs for Single Inoperable EDGFire Protection Program
ML20205K1095 April 1999Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing
ML20204B63221 March 1999Plant Referenced Simulation Facility Four Year Performance Testing ReptLoop seal
Squib
Residual transfer
Scram Discharge Volume
Fuel cladding
ML20199H36115 January 1999Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr
ML20206P05431 December 1998Rev 3.2 to EDAMS/RADDOSE-VGrab sample
Met Tower
ML20198M83230 December 1998Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program
ML20197G6183 December 1998Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into AmendOperating Basis Earthquake
Design basis earthquake
Earthquake
Fire Protection Program
ML20154M71816 October 1998Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant ChemistryPower change
ML20155E78315 September 1998Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval PlanStroke time
Hydrostatic
Squib
Cold shutdown justification
Power Operated Valves
ML20236X8043 August 1998Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14Safety Limit Minimum Critical Power Ratio
ML20236M62310 July 1998Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 ProcessFire Protection Program
ML20249B16316 June 1998Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit RequirementsOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20236L2937 June 1998Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys
ML20217K03930 March 1998Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433Grace period
B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy28 February 1998Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy
ML20247F79826 February 1998Proposed Tech Specs Re Allowed Containment Leakage RateOffsite Dose Calculation Manual
Fire Protection Program
ML20202G8846 February 1998Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions
ML20202D4026 February 1998Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads
ML20202D5626 February 1998Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown ModeHydrostatic
Earthquake
Fuel cladding
Pressure boundary leak
Offsite Circuit
Fire Protection Program
ML20199G5927 January 1998Rev 0 to JAF-ISI-0003, Third ISI Interval,Ten-Yr ISI PlanWeld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld
ML20199G5666 January 1998Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize DrawingsPacking leak
Non-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
EVT-1
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
Scaffolding
ML20203J69712 December 1997Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related FunctionsFire Protection Program
ML20217J00214 October 1997Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel StorageOperating Basis Earthquake
Design basis earthquake
Earthquake
Fire Protection Program
ML20217G3078 October 1997Proposed Tech Specs Re Distribution of Inoperable Control RodsShutdown Margin
Scram Discharge Volume
Overtravel
Fire Protection Program
ML20217K58430 September 1997Rev 1 to Ja FitzPatrick Nuclear Power Plant IST Program for Pumps & Valves,Third IntervalStroke time
Hydrostatic
Squib
Cold shutdown justification
Power Operated Valves
ML20211H08026 September 1997Revised Proposed TS Changes to ASME Section XI, Surveillance TestingStroke time
Hydrostatic
Fuel cladding
Offsite Circuit
ML20236N7069 September 1997Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs
ML20149G25714 July 1997JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval CloseoutVT-2
Liquid penetrant
Dissimilar Metal Weld
ML20140D81314 April 1997Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change
ML20198G7213 April 1997Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation
ML20136H37711 March 1997Rev 0 to Power Uprate Startup Test Rept for Cycle 13Shutdown Margin
Temporary Modification
Downpower
Flow Induced Vibration
ML20135B19226 November 1996Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents
ML20134M17520 November 1996Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on PpShutdown Margin
ML20149L7198 November 1996Proposed Tech Specs Re Min Critical Power Ratio Safety LimitFuel cladding
ML20129G00923 October 1996Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain DeletedFuel cladding
ML20128Q74411 October 1996Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month CyclesShutdown Margin
ML20135D03131 July 1996Rev 4 to Radiological Effluent Controls & Offsite Dose Calculation ManualOffsite Dose Calculation Manual
ML20115G06412 July 1996Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit
ML20113B65120 June 1996Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing ProgramOffsite Dose Calculation Manual
Hydrostatic
Process Control Program
Fire Protection Program
ML20112D15330 May 1996Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated BasisAbnormal operational transient
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML20112D27230 May 1996Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements
ML20112D57130 May 1996Proposed Tech Specs,Eliminating Selected Response Time Testing RequirementsFire Protection Program
JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B16 May 1996Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.BOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20108D11724 April 1996Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per DayOffsite Dose Calculation Manual
Hydrostatic
Process Control Program
Fire Protection Program