Issue date | Title | Topic | |
---|---|---|---|
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
ML23114A252 | 28 April 2023 | Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI | Incorporated by reference |
ML22223A141 | 1 September 2022 | Issuance of Amendment No. 353 Adoption of TSTF - 505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Safe Shutdown High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit |
ML22196A061 | 23 August 2022 | Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Incorporated by reference FLEX Large early release frequency |
ML22166A430 | 15 July 2022 | Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation | Reactor Vessel Water Level Surveillance Frequency Control Program |
ML22126A196 | 27 May 2022 | Issuance of Amendment No. 350 Adoption of TSTF-264, Revision 0 | Surveillance Frequency Control Program |
ML22090A086 | 29 April 2022 | Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position | Safe Shutdown Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Fire Protection Program |
ML22094A001 | 15 April 2022 | Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) | Nondestructive Examination VT-2 Incorporated by reference Through-Wall Leakage |
ML21364A043 | 28 February 2022 | Issuance of Amendment No. 348 Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves | Stroke time Incorporated by reference Grace period |
ML21347A038 | 13 January 2022 | Issuance of Amendments to Revise Reactor Coolant Leakage Requirements | Packing leak Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML21277A248 | 16 November 2021 | Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) | Decommissioning Funding Plan |
ML21300A355 | 16 November 2021 | Issuance of Amendment No. 345 Adoption of TSTF-582 | Shutdown Margin Water Inventory Control Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Offsite Circuit |
ML21230A206 | 3 September 2021 | Proposed Alternative to Use ASME OM Code Case OMN-28 | Incorporated by reference |
ML21131A127 | 9 August 2021 | Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) | Loop seal Stroke time Surveillance Frequency Control Program |
ML21216A220 | 5 August 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting | Coatings Nondestructive Examination Incorporated by reference |
ML21166A168 | 25 June 2021 | Incorporated by reference | |
ML21162A042 | 14 June 2021 | Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) | High Radiation Area Water Inventory Control Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit |
ML21049A355 | 28 April 2021 | Issuance of Amendment No. 341 Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control | |
ML21033A530 | 1 April 2021 | Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML21028A673 | 3 February 2021 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 | Incorporated by reference |
ML20287A130 | 5 November 2020 | Review of Quality Assurance Program Changes | Grace period |
ML20269A200 | 30 September 2020 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 | Incorporated by reference |
ML20169A510 | 20 August 2020 | Issuance of Amendment No. 339 Changes to Technical Specifications Related to Primary Containment Hydrodynamic Loads | Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Large early release frequency MELLLA |
ML20140A070 | 21 July 2020 | Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences | Safe Shutdown Boric Acid Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Exemption Request Earthquake GOTHIC |
ML20141L636 | 10 July 2020 | Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 | Time of Discovery High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Turbine Missile Fire Protection Program |
ML20134H940 | 8 July 2020 | Issuance of Amendments Revising the High Radiation Area Administrative Controls | High Radiation Area Offsite Dose Calculation Manual Cyber Security Annual Radioactive Effluent Release Report Process Control Program Safeguards Contingency Plan Deep Dose Equivalent Fire Protection Program Scaffolding |
ML20094G903 | 2 June 2020 | Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' | Probabilistic Risk Assessment Large early release frequency Earthquake |
ML20021A070 | 6 April 2020 | Issuance of Amendments to Delete License Conditions for Decommissioning Trusts | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Preemption Authority Fire Protection Program |
ML20024C661 | 2 March 2020 | Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
ML19295G783 | 19 December 2019 | Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters | Ultimate heat sink Surveillance Frequency Control Program Frazil ice Power change |
ML19269C534 | 27 September 2019 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques | Incorporated by reference |
ML19175A042 | 11 September 2019 | Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules | Time of Discovery Fire Protection Program |
ML19176A033 | 28 August 2019 | Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Fire Protection Program |
ML19189A084 | 19 August 2019 | Issuance of Amendment No. 326 Adoption of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month | Surveillance Frequency Control Program |
ML19192A244 | 18 July 2019 | Proposed Alternative to Use ASME Code Cases N-878 and N-880 | Commercial Grade Dedication Nondestructive Examination Incorporated by reference |
ML19157A203 | 11 July 2019 | Issuance of Amendment No. 325 Reactivity Anomalies Surveillance | Anticipated operational occurrence |
ML19135A444 | 21 June 2019 | Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME Code | Weld Overlay VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML19098A034 | 30 April 2019 | Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins | |
ML18360A635 | 25 February 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4464; EPID No. L-2014-JLD-0049) | Ultimate heat sink Mission time Tornado Missile FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Containment Hardened Vent Battery sizing Earthquake |
ML18304A365 | 16 January 2019 | 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fuel cladding Fire Protection Program Power change |
ML18289A432 | 28 November 2018 | Issuance of Amendment No. 323 Revision to the Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | High winds Ultimate heat sink Water Inventory Control Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML18214A706 | 19 September 2018 | Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML18206A282 | 2 August 2018 | Issuance of Amendments to Relocate the Staff Qualification Requirements | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML18180A372 | 19 July 2018 | Issuance of Amendment No. 319, Revise Technical Specification Surveillance Requirement 3.6.4.1.3 to Allow Opening of Inner and Outer Secondary Containment Access Openings (CAC MG0239; EPID L-2017-LLA-0298) | Surveillance Frequency Control Program Recently irradiated fuel |
ML18039A854 | 30 May 2018 | Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085) | Hydrostatic Nondestructive Examination Incorporated by reference EVT-1 Dissimilar Metal Weld |
ML18044A993 | 13 April 2018 | Request for Alternatives PRR-01, PRR-02, PRR-04, VRR-02, VRR-03, and VRR-04 from ASME OM Code Requirements for Various Pumps and Valves, Fifth 10-Year Inservice Testing Interval (CAC MG0052-MG0061; EPID L-2017-LLR-0067 to L-2017-LLR-0074) | Stroke time Incorporated by reference Grace period |
ML17289A175 | 26 March 2018 | Issuance of Amendment No. 318, Revise Emergency Plan for Emergency Response Organization Requalification Training Frequency Consistent with Exelon Fleet (CAC MG0026; EPID L-2017-LLA-0273) | |
ML18003B382 | 3 January 2018 | Correction to the Safety Evaluation to James A. Fitzpatrick Nuclear Power Plant Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) (Original Safety Evaluation: ML17289A07 | Liquid penetrant |
ML17342A006 | 18 December 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Reserve Station Service Transformer Emergency Lighting FLEX Fukushima Dai-Ichi Tornado Missile Protection Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice Earthquake Fire Protection Program GOTHIC |
ML17289A075 | 12 December 2017 | Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) Note Correction Safety Evaluation See ML18003B382 | Incorporated by reference Liquid penetrant |