Issue date | Title | Topic | |
---|---|---|---|
ML23130A297 | 17 May 2023 | Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information | |
ML23104A105 | 10 March 2023 | NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 | |
ML23019A067 | 19 January 2023 | Inservice Inspection Request for Information | Boric Acid Nondestructive Examination Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
ML22349A011 | 14 December 2022 | NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 | |
ML22213A166 | 1 August 2022 | Information Request, Security IR 2022401 | |
ML22208A054 | 26 July 2022 | Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML22174A136 | 23 June 2022 | NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) | |
ML22159A324 | 9 June 2022 | Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information | Ultimate heat sink Coatings Nondestructive Examination Aging Management Frazil ice |
ML22151A326 | 31 May 2022 | August 2022 Emergency Preparedness Exercise Inspection - Request for Information | Coronavirus |
ML22122A295 | 4 May 2022 | Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information | |
ML22124A245 | 4 May 2022 | NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) | Probabilistic Risk Assessment FLEX |
ML22108A164 | 18 April 2022 | NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) | |
ML22034A548 | 3 February 2022 | NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) | Safe Shutdown Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile |
ML22020A082 | 19 January 2022 | NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) | Probabilistic Risk Assessment Missed surveillance |
ML21312A038 | 5 November 2021 | NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 | |
ML21286A713 | 15 October 2021 | ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Emergency Lighting Aging Management Job Performance Measure Fire Protection Program |
ML21273A067 | 29 September 2021 | NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program | |
ML21236A322 | 19 September 2021 | Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML21252A005 | 20 August 2021 | NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) | Ultimate heat sink Mission time Probabilistic Risk Assessment |
ML21217A330 | 5 August 2021 | (ANO) Problem Identification and Resolution (PIR) Request for Information Combined | Temporary Modification Pandemic Coronavirus |
ML21204A084 | 28 July 2021 | ANO Phase 4 2021013 RFI Gap | Aging Management |
ML21197A037 | 16 July 2021 | NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 | |
0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description | 30 April 2021 | Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description | Cyber Security |
ML21116A109 | 26 April 2021 | NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping | |
ML21105A012 | 9 April 2021 | NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program | Offsite Circuit |
ML21071A217 | 10 March 2021 | NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual | |
ML21026A268 | 26 January 2021 | Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML21022A084 | 22 January 2021 | Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted | Nondestructive Examination Aging Management |
ML21019A514 | 14 January 2021 | March 2021 Emergency Preparedness Exercise Inspection - Request for Information | Coronavirus |
ML20324A641 | 19 November 2020 | NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 | Non-Destructive Examination COVID-19 Dissimilar Metal Weld |
ML20316A010 | 2 November 2020 | NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 | Probabilistic Risk Assessment Incorporated by reference |
ML20262H075 | 17 September 2020 | NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations | Anticipated operational occurrence |
ML20260H476 | 9 September 2020 | NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values | Anticipated operational occurrence |
ML20154K762 | 1 June 2020 | NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations | Surveillance Frequency Control Program Power change |
ML20119A098 | 28 April 2020 | Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information | Job Performance Measure |
ML20106E852 | 13 April 2020 | Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 | Coronavirus |
ML20065H799 | 6 March 2020 | Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values | |
ML20055E909 | 24 February 2020 | NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time | Anticipated operational occurrence Power Uprate |
ML20036D309 | 5 February 2020 | NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 | Incorporated by reference |
ML20013C747 | 10 January 2020 | NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis | Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator |
ML19316A024 | 7 November 2019 | NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) | |
ML19280A040 | 7 October 2019 | NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis | Tornado Missile Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator |
ML19339F590 | 23 September 2019 | Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection | High Radiation Area |
ML19281E003 | 5 August 2019 | ANO 2019 PIR Request for Information | Temporary Modification |
ML19203A012 | 16 July 2019 | Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) | Boric Acid Nondestructive Examination Scaffolding |
ML19106A432 | 16 April 2019 | NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump | |
ML19058A833 | 27 February 2019 | NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 | |
ML18324A805 | 19 November 2018 | Notification of an NRC Triennial Fire Protection Baseline Inspection Report 05000313/2019010 and 05000368/2019010) and Request for Information | Safe Shutdown Fitness for Duty Hydrostatic Probabilistic Risk Assessment Temporary Modification Emergency Lighting Job Performance Measure Thermoset Severe Accident Management Guideline B.5.b Mitigating Strategies Maintenance Rule Program Fire Protection Program |
ML18263A302 | 19 September 2018 | NRR E-mail Capture - ANO-1 - Final RAI License Amendment Request to Adopt TSTF-425, Revision 3 | High winds Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML18263A148 | 11 September 2018 | NRR E-mail Capture - ANO-2 - Final RAI #2 LAR to Update the RCS Pressure-Temperature Limits |