Start date | Status | Title | Topic | |
---|---|---|---|---|
EPID:L-2023-LLA-0064 | 4 May 2023 | Approved Closed | Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) | |
EPID:L-2023-LLA-0029 | 27 February 2023 | Approved Closed | Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) | |
EPID:L-2021-LLA-0224 | 4 November 2022 | Approved Closed | TSTF-563 | |
EPID:L-2022-LLA-0103 | 27 July 2022 | Approved Closed | Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) | |
EPID:L-2022-LLA-0100 | 13 July 2022 | Approved Closed | TSTF-554 | |
EPID:L-2022-LLA-0088 | 13 June 2022 | Approved Closed | TSTF-529 | |
EPID:L-2021-LRO-0071 | 2 March 2022 | Approved Closed | Order of the Secretary (Extending Time for Commission Review) | |
EPID:L-2022-LLA-0026 | 17 February 2022 | Approved Closed | TSTF-493 | |
EPID:L-2022-LLA-0021 | 27 January 2022 | Approved Closed | Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | |
EPID:L-2021-LLA-0174 | 29 September 2021 | Approved Closed | Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) | |
EPID:L-2020-LLA-0195 | 17 September 2021 | Approved Closed | ||
EPID:L-2022-LLQ-0002 | 31 August 2021 | Approved Closed | Bellefonte Nuclear Plant, Units 1 and 2, Status Update and Request for Extension of Construction Permits (CPPR-122 and CPPR-123) | |
EPID:L-2021-LLA-0100 | 29 June 2021 | Approved Closed | ||
EPID:L-2020-LLA-0167 | 17 June 2021 | Approved Closed | ||
EPID:L-2021-LRO-0023 | 10 May 2021 | Approved Closed | Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions | |
EPID:L-2021-LLA-0043 | 11 March 2021 | Approved Closed | TSTF-510 | |
EPID:L-2021-LLA-0035 | 3 March 2021 | Approved Closed | Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N | |
EPID:L-2021-LLA-0030 | 2 March 2021 | Approved Closed | License Amendment Request to Revise Updated Final Safety Analysis Report Section 15.5.5 - Steam Generator Tube Rupture Dose Analysis (WBN-TS-20-04) | |
EPID:L-2021-LLA-0032 | 17 February 2021 | Approved Closed | TSTF-510, TSTF-205, TSTF-448 TSTF-425 | |
EPID:L-2021-LRO-0003 | 11 February 2021 | Approved Closed | Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | |
EPID:L-2020-LLA-0270 | 21 January 2021 | Approved Closed | ||
EPID:L-2020-LLA-0273 | 23 December 2020 | Approved Closed | Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) | |
EPID:L-2020-LLA-0175 | 19 November 2020 | Approved Closed | ||
EPID:L-2021-LLA-0026 | 29 October 2020 | Approved Closed | 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension | |
EPID:L-2020-LLE-0179 | 14 October 2020 | Approved Closed | Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic | |
EPID:L-2020-LLA-0223 | 2 October 2020 | Approved Closed | Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) | |
EPID:L-2020-LLA-0191 | 14 September 2020 | Approved Closed | TSTF-490 | |
EPID:L-2020-LLA-0160 | 1 September 2020 | Withdrawn Closed | TSTF-490 | |
EPID:L-2019-LLA-0286 | 19 August 2020 | Approved Closed | ||
EPID:L-2020-LLA-0185 | 14 August 2020 | Approved Closed | License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) | |
EPID:L-2020-LLA-0161 | 17 July 2020 | Approved Closed | TSTF-510 | |
EPID:L-2020-LLA-0133 | 16 July 2020 | Approved Closed | TSTF-569 | |
EPID:L-2020-LLA-0136 | 22 June 2020 | Approved Closed | Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) | |
EPID:L-2020-LLA-0114 | 19 May 2020 | Approved Closed | Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) | |
EPID:L-2020-LLA-0068 | 3 April 2020 | Approved Closed | TSTF-541 | |
EPID:L-2020-LLA-0037 | 2 March 2020 | Approved Closed | Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat | |
EPID:L-2020-LLA-0005 | 17 January 2020 | Approved Closed | Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology | |
EPID:L-2019-LLA-0272 | 6 December 2019 | Approved Closed | Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) | |
EPID:L-2019-LLA-0209 | 31 October 2019 | Approved Closed | ||
EPID:L-2019-LLA-0228 | 31 October 2019 | Approved Closed | ||
EPID:L-2019-LLS-0000 | 10 October 2019 | Approved Closed | License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | |
EPID:L-2019-LRO-0068 | 27 August 2019 | Approved Closed | Cycle 2 Steam Generator Tube Inspection Report | |
EPID:L-2018-LLE-0012 | 25 July 2019 | Approved Closed | ||
EPID:L-2018-LLA-0494 | 7 June 2019 | Approved Closed | TSTF-500 | |
EPID:L-2019-LLA-0005 | 22 April 2019 | Approved Closed | Package: Letter to P. Noss Authorization for Shipment of the Model No. Bea Research Reactor Package with Rhode Island Nuclear Science Center Fuel Elements | |
EPID:L-2019-LLA-0020 | 7 February 2019 | Approved Closed | TSTF-500 TSTF-360 | |
EPID:L-2018-LLA-0002 | 28 January 2019 | Approved Closed | ||
EPID:L-2018-LLA-0493 | 29 November 2018 | Approved Closed | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24) | |
EPID:L-2018-LLA-0279 | 29 November 2018 | Approved Closed | TSTF-425 | |
EPID:L-2018-LLA-0286 | 25 September 2018 | Approved Closed | Armed Forces Radiobiology Research Institute Reactor Facility Request to Amend the Technical Specifications for License R-84 |